|
| 1 | Providing Distribution Pipeline 1446and FHTCS 241 @Singavaran Panchayat |
| 2 | Earthwork excavation with alead upto 10m in hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small sized boulders and hard gravelly soil |
| 3 | Supply and delivery of following size of PVC pipes and specials as per IS 4985 with ISI mark and manufacturar brand |
| 4 | 63mm PVC Pipe |
| 5 | Solvent |
| 6 | Conveyingof the following classification of PVC pipes loweringinto the trenches laying to proper grade alignment with PVC coupler and specials |
| 7 | 63mm PVC Pipe |
| 8 | Refilling with excavated earth other than sand including allcharges with standard specification |
| 9 | Provision for FHTC for With Post all charges |
| 10 | Provision for Materila Testing Charges |
| 11 | FixingofName Board includingcost, painting, Lettering, installation etc. |
| 12 | Photographic charges for taking photos in various stages before execution, during execution and after execution |
| 13 | Providing Distribution Pipeline 696and FHTCS 116 @ Pulipattu Panchayat |
| 14 | Earthwork excavation with alead upto 10m in hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small sized boulders and hard gravelly soil |
| 15 | Supply and delivery of following size of PVC pipes and specials as per IS 4985 with ISI mark and manufacturar brand |
| 16 | 63mm PVC Pipe |
| 17 | Solvent |
| 18 | Conveyingof the following classification of PVC pipes loweringinto the trenches laying to proper grade alignment with PVC coupler and specials |
| 19 | 63mm PVC Pipe |
| 20 | Refilling with excavated earth other than sand including allcharges with standard specification |
| 21 | Provision for FHTC for With Post all charges |
| 22 | Provision for Materila Testing Charges |
| 23 | FixingofName Board includingcost, painting, Lettering, installation etc. |
| 24 | Photographic charges for taking photos in various stages before execution, during execution and after execution |
| 25 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |