| 1 | Safe carriage, Loading unloading with proper stacking of following material from ESC. Daligang ot work site/Je-Dump store. |
| 2 | (a) New PCC Pole 8.5/9mtr.long |
| 3 | (b) New S.T.P. Pole 9/11 mtr. Long |
| 4 | ( c ) Different maintenance material cable. Joint kit. PVC Cable, ACSR wire Insulators Transformer oil, ABC cable, etc. |
| 5 | (d) 11 kv HT XLPE Cable 3x185 sqmm, 3x120 sqmm, 3x40 sqmm, etc. |
| 6 | Supply and erection of decentralized items like,lugs, fuse wire, spring contact and other items related to complete LT Fuse unit. |
| 7 | Fabrication, Erection and repairing of damaged wiremess fencing 02mtr. Height with gate and rataining wall including grouting of fabricated Ms angle 65x65x6 mmsq support and its painting as per specification. |
| 8 | Repairing of damaged massonery transformer plinth of size as per requirement at site to maintain the height of 1.5mtr brick bllast, filling of sand in the hollow space, plastening of surface in ratio 1:4:6: and top of plinth 4\" thickness concealing (Including all materials and labour and T&P) |
| 9 | Repairing of damaged/rusted steel tubular pole by digging of pit up to 2\" for proper position putting 3nos angle from of size 35x35x6 sqmm 3nos angle around the damaged part of pole and welding properly and also grouting and plastering 300 mm with cement concrets. |
| 10 | Erection of sub-station type Double Pole on 9/11 meter long ST. Pole along with fizing of necessary clamp/accessories required including fixing of straight M.S. 100x50 mm Top channel 125x65x6mm (2240 mm long) one no. Dropper channel 100x50mm. (2028mmlong)/Angle 100x50 mm 02 nos with arrangement of fixing of 03 nos. pin insulator including sub-station base angle of 65x65x6mm (2250mm) channel 02 nos earthing it properly as per RESPO specification. |
| 11 | Safe Carriage of Centralised Items like O/D, I/D, S/TH, XLPE Cable, ABC, Open Conductor etc.In O&M Head From Central Store LESA to Site |
| 12 | Laying of 11KV 3x185, 3x120, 3x240Sqmm.XLPE cable with drilling machine as per normes of UPPCL |
| 13 | Erection of single pole PCC Pole 11 Mtr. Long with all accessories |
| 14 | Erection of single pole ST Pole 11 Mtr. Long with all accessories. |
| 15 | Supply and repairing/ replacement of damaged tailness fuse unit/materials on Lt distribution piller box with clamping lug of required size of LT PVC. |
| 16 | (a) 500 Amp 600 Volts |
| 17 | (b) 300 Amp. 600 Volts |
| 18 | Resagging of existing LT/HT line opening of ABC on Service point and opening of, consumers service Cable after re-sagging of ABC re-connection of consumers service cable with LT Line (in breakdown time man power has bee provided 24 Hours) and cutting/chopping of tree branches and clear from existing LT/HT line to reduce the tripping/breakdown. |
| 19 | providing chemical earthing of existing 250/400/630 KVA transformer by boaring & lowering 20\" electrode and put chemical for improve earthing resistance below than 1 OHM and connecting of transformer body and neutral with GL Strip. |
| 20 | supply and errection tighting and replacing of damage LT Lead Lugs and Copper L-pies of D.T. of capacity 250, 400 & 630 KVA |
| 21 | Grouting and nozzelling of stay set complete 16X1800mm.sp. With cement concreat sand, brick, blast. |
| 22 | Re-grouting cable and laying cable during breakdown period/faults on main road etc. |
| 23 | Top-up distilled water in battery bank time to time and maintain DC Supply for healthy tripping also maintained waterdensity. |
| 24 | Shifting of transformer from one plinth to another plinth and installed trolly with the help of crane during repairing of plinth. |
| 25 | GST Extra as per Rules |