Tender For Comprehensive Maintenance Of Vehicles Under Ge (West) Bareilly.; 1 Repair/maint of vehicles- Tata 207/Tata Xenon , once in a month for 11 Months by cleaning the vehicle from outside with the help of soap/shampoo /car washing detergent completely by removing dust and dirt from under side of the vehicle, checking of lubricants oil ,water, brake oil and other acessories fluid and top up it if required. Cleaning the vehicle from inside with the help of suction pump removing dirt and dust fromcomplete unit, cleaning of dash board with the help of suitable mild cleaning agent of car . Cleaning of radiator of vehicle, checking its efficiency and proper functionng, checking of brake of the vehicle and do minor repair if required.Do suitable oiling and greasing. Checking allingnment of the wheels functioning of wiper, indicators ,backlight ,head lights, and all electrical work like wiring and testing of all lights and bulbs complete all as specified anddirected . 2 All as above item No 1.00 but for Eicher 10.70/10.75 including Eicher with Hydraulic Telescopic ladder complete all as specified and as directed 3 All as above item No 1.00 but for Maruti Gypsy complete all as specified and as directed 4 All as above item No 1.00 but for Maruti Omini ,Maruti Dzire , Maruti Swift Dzire ,Maruti SX4 and ECO complete all as specified and as directed 5 All as above item No 1.00 but for Tata Indigo complete all as specified and as directed 6 All as above item No 1.00 but for Hindustan Ambassador complete all as specified and as directed 7 Repair/maint of vehicles- Motor cycle-Royal Enfield , once in a month for 11 Months by cleaning the vehicle from outside with the help of soap/shampoo/washing detergent completely by removing dust and dirt from the vehicle, checking of lubricants oil , brake oil and other acessories fluid and top up it if required. checking of brake of the vehicle and do minor repair if required.Do suitable oiling and greasing. Checking of ,clutch and accelerator,Chain & socket , indicators ,back and front light ,and testing of all lights and bulbs,repair of puncture if any ,complete all as specified anddirected 8 All as above item No 7.00 but for Motor Cycle Hero/bajaj platina complete all as specified and as directed 9 Tata 207 DI/Tata Xenon 10 Servicing and Repair/Maintenanceof Vehicles- Tata 207,Tata Xenon each two times at interval of five months comprising checking and repair/replacement of unserviceable spares ofengine ,self starter , gear box FIP(Fuel Injector Pump), shaft,shocker and suspension system ,braking system inlcuding brake shoe ,Radiator cleaning, replacement of all type offilters and greasing of all wheels, Wheel alignment and wheel balancing by computerized Machine including tyre rotationetcofVehicles including dismantling/ Replacingof defective parts with new parts at workshopcomplete all as specifiedand directedNote :-1. Spare parts shall be measured and paid separatly under relevant items here in after but fixing of the same deemed to be included in unit rate.2.Cost of Engine Oilincluded inquoted rate.3 Cost of Brake oil, gear oil and coolant included in quoted rate. 4.Other minor consumable items like nut bolts washer , cotton waste etc are deemed to be included in the quoted rate 11 Air filter ,Oil filter and Fuel filter each set of threeMake - Micro ,bosh 12 Clutch and pressure plate set including clutch bearing and clutch cylinder,Cluthch Paddle completeMake -C K or eqlt 13 Head light assembly complete with connection complete . Make -Autopal, Helonix,Lumax 14 Head light bulb Helogen 12 volt 60 wattMake -Autopal,Helonix 15 Fog lamp 16 Brake/ Back light Assy Make -Autopal, K K 17 Indicator AssyMake -Autopal, K K 18 Wipper Assy withblade complete make -Syndicate,Champion etc 19 Water pump assembly 20 Door Lock assembly Make -Syndicate,ATS 21 Coolant bottle with pipe 22 Wheel Arch Guard cover front and rear as per existing model of Tata 207 DI including clip and bolts 23 Mud pad of best quality 24 Side lookingmirror of side doors of best quality 25 Fan v belt Make -Fenner 26 M & L for rewinding of self starter ofVehicles withsuper enamelled insulating copper wire of existing gauge , insulating materials including assembling and testing complete all as specified and directed by Opening and dismantling of self starter, and replacing with following items.(a) Carbon brushes -01 Set (b) Solenoid Switch -01 No (c) bendix -01 No (d) Fly wheel -01 No (as per sample). 27 M & L for repair of alternator including repair/replace of rectifier assembly and repair/replace of rotor assembly complete all as specified and as directed 28 M & L for repair of suspension systemby Dismantling front wheel and wheel joint upper and Lower of suspension system,leaf springs, reassembling and testing after repair including replacement of following items:- (a) Suspension Kit -01 Kit, (b) Lower arm bush -08 Nos. (c) Upper arm bush -04 Nos. (d) Wheel joint upper -02 Nos. (e) Wheel joint lower -02 Nos. (f) Coil spring pad -02 Nos. (g) Tie rod end -04 Nos. (h) Upper arm bolt -02 Nos. (j) Kamani bush front -01 No. (k) Penion bearing -02 Nos. (l) Penion -01 No. (m) UJ Cross -01 No. testing complete all as specified and directed 29 Repair of Wheels and braking system including servicing and testingof master and slave cylinder by Dismantling front and rear wheels, greasing, brake work including replacing the following items:-(a) Brake pad front wheel -04 Nos. (b) Rear wheel brake shoes -08 Nos. (c) Wheel bearing inner -02 Nos. (d) Wheel bearing outer -02 Nos. (e) Wheel cylinder kit -01 No. (f) Brake plate assly -01 No. (g) Brake pad assembly -04 Nos.(h) Brake lining-01 No 30 Master cylinder complete 31 Repair/replacement of electronic motorized fuel pump assembly incl dismentling of old unsv complete all as specified and directed. 32 Taking down of radiator complete assembly and repair of radiator including welding/brazing works and replacement of gaskets and seal other items as required all as specified 33 Opening steering assembly, removing stearing rack, lathe work, facing, ramming including replacing the following items:-(a) Centre pin bush -02 Nos. (b) Centre bearing assly -01 No. (c) Link rod repair kit, (d) Check nut -02 No. (e) Lower stearing oil -01 Ltr. 34 Denting and Painting of full body of vehicle in work shop including replacement of rusted M Ssheet by using gas welding,applying two coat of synthetic enamelled paint over one coat of base primer and matching with existing surface Only painting including painting of all army sign and marking and vehicle BA No. on Number plate.complete all as specified and directed 35 Replacement of rusted/ damaged seat cover complete set including repair of Damaged seats and stitching work complete all as specified and directed 36 Supply and fixing of foot matfor Vehicle-Tata 207 complete all as specified and directed 37 Floor matting best quality 38 Replace ofFront glass/roof top rubber beading complete Make -Syndicate,ATS,TATA 39 Repair to Door /Windowglass with rubber beading complete Make -Syndicate,ATS,TATA 40 Supply and fixing of PVC multistranded copper single core cable 25 sqmm required for Battery 41 Supply and fixing of Horn assembly complete including wiring connection and fixing 42 Repair to gear box including bush repair/repalce and greasing etc. Complete. 43 Repair of puncture of tube inner 44 Eicher 10.70/10.75 45 Servicing and Repair/Maintenanceof Vehicles- Eicher 10.70/10.75 each two times at interval of five months comprising checking and repair/replacement of unserviceable spares ofengine ,self starter , gear box FIP (Fuel Injector Pump), shaft,shocker and suspension system ,braking system inlcuding brake shoe ,Radiator cleaning, replacement of all type offilters and greasing of all wheels, Wheel alignment and wheel balancing by computerized Machine including tyre rotationetcofVehicles including dismantling/ Replacingof defective parts with new parts at workshopcomplete all as specifiedand directed.Note :-1. Spare parts shall be measured and paid separatly under relevant items here in after but fixing of the same deemed to be included in unit rate.2.Cost of Engine Oilincluded in quoted rate.3 Cost of Brake oil, gear oil,diffrential oil and coolant included in quoted rate. 4.Other minor consumable items like nut bolts washer , cotton waste etc are deemed to be included in the quoted rate 46 Air filter ,Oil filter and Fuel filter each set of threeMake - Micro ,bosh 47 Clutch and pressure plate set , including clutch cylinder , Clutch bearing completeMake -C K or eqlt 48 Head light assembly complete with connection . Make -Autopal, Helonix,Lumax 49 Head light bulb Helogen 12 volt 60 wattMake -Autopal,Helonix 50 Break/ Back light Assy Make -Autopal, K K 51 Indicator AssyMake -Autopal, K K 52 Fog lamp 53 Wipper Assy withblade complete make -Syndicate,Champion etc 54 Replace ofFront glass/roof top rubber beading complete 55 Repair to Door /Windowglass with replacement of rubber beading complete 56 Door Lock assembly Make -Syndicate,ATS 57 Water pump assembly 58 Side lookingmirror of side doors of best quality 59 Mud pad of best quality 60 Coolant bottle with pipe 61 Fan v belt Make -Fenner 62 Denting and Painting ofVehicle full body in work shop including replacement of rusted M Ssheet by using gas welding,applying two coat of synthetic enamelled paint over one coat of base primer and matching with existing surface Only painting including painting of all army sign and marking and vehicle BA No. on Number plate.complete all as specified and directed 63 Replacement of rusted/ damaged seat/seat cover complete all as specified and directed 64 Floor matting best quality 65 Supply and fixing of foot mat 66 M & L for rewinding of self starter ofVehicles withsuper enamelled insulating copper wire of existing gauge , insulating materials including assembling and testing complete all as specified and directed by Opening and dismantling of self starter, and replacing with following items.(a) Carbon brushes -01 Set (b) Solenoid Switch -01 No (c) bendix -01 No (d) Fly wheel -01 No (as per sample). 67 M & L for repair of alternator including repair/replace of rectifier assembly and repair/replace of rotor assembly complete all as specified and as directed 68 M & L for repair of suspension systemby Dismantling front wheel and wheel joint upper and Lower of suspension system,leaf springs, reassembling and testing after repair including replacement of following items:- (a) Suspension Kit -01 Kit, (b) Lower arm bush -08 Nos. (c) Upper arm bush -04 Nos. (d) Wheel joint upper -02 Nos. (e) Wheel joint lower -02 Nos. (f) Coil spring pad -02 Nos. (g) Tie rod end -04 Nos. (h) Upper arm bolt -02 Nos. (j) Kamani bush front -01 No. (k) Penion bearing -02 Nos. (l) Penion -01 No. (m) UJ Cross -01 No. testing complete all as specified and directed 69 Repair of Wheels and braking system including servicing and testingof master and slave cylinder by Dismantling front and rear wheels, Hub greasing, brake work including replacing the following items:-(a) Brake pad front wheel -04 Nos. (b) Rear wheel brake shoes -08 Nos. (c) Wheel bearing inner -02 Nos. (d) Wheel bearing outer -02 Nos. (e) Wheel cylinder kit -01 No. (f) Brake plate assly -01 No. (g) Brake pad assembly -04 Nos.(h) Brake lining-01 No 70 Master cylinder complete 71 Repair/replacement of electronic motorized fuel pump assembly incl dismentling of old unsv complete all as specified and directed. 72 Opening steering assembly, removing stearing rack, lathe work, facing, ramming including replacing the following items:-(a) Centre pin bush -02 Nos. (b) Centre bearing assly -01 No. (c) Link rod repair kit, (d) Check nut -02 No. (e) Lower stearing oil -01 Ltr. 73 Supply and fixing of PVC multistranded copper single core cable 25 sqmm required for Battery 74 Repair of puncture of tube inner complete all as specified and directed 75 Repair to gear box including bush repair/repalce and greesing etc. Complete. 76 Repair to tank leakage if any for the fuel tank including cleaning of tank and replacement of u/S float valve assembly and fuel tank lock and key. 77 Supply and fixingof brass battery terminal complete 78 Staff Car Ambassdor 79 Servicing and Repair/Maintenanceof Vehicles- Ambassdor car Make- Hindustaneach two times at interval of five months comprising checking and repair/replacement of unserviceable spares ofengine ,self starter , gear box FIP (Fuel Injector Pump), shaft,shocker and suspension system ,braking system inlcuding brake shoe ,Radiator cleaning, replacement of all type offilters and greasing of all wheels, Wheel alignment and wheel balancing by computerized Machine including tyre rotationetcofVehicles including dismantling/ Replacingof defective parts with new parts at workshopcomplete all as specifiedand directed by Engr in charge Note :-1. Spare parts shall be measured and paid separatly under relevant items here in after but fixing of the same deemed to be included in unit rate.2.Cost of Engine Oilincluded in quoted rate.3.Cost ofBrake oil, gear oil and coolant inluded in quoted rate. 4.Other minor consumable items like nut bolts washer , cotton waste etc are deemed to be included in the quoted rate 80 Air filter ,Oil filter and Fuel filter each set of threeMake - Micro ,bosh 81 Filter element 82 Clutch and pressure plate set , including clutch cylinder , Clutch bearing completeMake -C K or eqlt 83 Head light assembly complete with connection . Make -Autopal, Helonix,Lumax 84 Head light bulb Helogen 12 volt 60 wattMake -Autopal,Helonix 85 Head light Relay 86 Break/ Back light Assy Make -Autopal, K K 87 Indicator AssyMake -Autopal, K K 88 Fog lamp 89 Wipper Assy withblade complete make -Syndicate,Champion etc 90 Repair to Door /Windowglass with replacement of rubber beading complete 91 Door Lock assembly Make -Syndicate,ATS 92 Water pump assembly 93 Side lookingmirror of side doors of best quality 94 Fan v belt Make -Fenner 95 Star Box Cover 96 Car Freshner 97 Parking Light Bulb 98 Bracket 99 Tissue Paper box 100 Perfume 101 Radiator cleaning fluid bottle 102 Coolant bottle with pipe 103 Silencer packing 104 Floor matting best quality 105 Supply and fixing of foot mat 106 M & L for rewinding of self starter ofVehicles withsuper enamelled insulating copper wire of existing gauge , insulating materials including assembling and testing complete all as specified and directed by Opening and dismantling of self starter, and replacing with following items.(a) Carbon brushes -01 Set (b) Solenoid Switch -01 No (c) bendix -01 No (d) Fly wheel -01 No (as per sample). 107 M & L for repair of suspension systemby Dismantling front wheel and wheel joint upper and Lower of suspension system,leaf springs, reassembling and testing after repair including replacement of following items:- (a) Suspension Kit -01 Kit, (b) Lower arm bush -08 Nos. (c) Upper arm bush -04 Nos. (d) Wheel joint upper -02 Nos. (e) Wheel joint lower -02 Nos. (f) Coil spring pad -02 Nos. (g) Tie rod end -04 Nos. (h) Upper arm bolt -02 Nos. (j) Kamani bush front -01 No. (k) Penion bearing -02 Nos. (l) Penion -01 No. (m) UJ Cross -01 No.testing complete all as specified and directed 108 Repair of Wheels and braking system including servicing and testingof master and slave cylinder by Dismantling front and rear wheels, greasing, brake work including replacing the following items:-(a) Brake pad front wheel -04 Nos. (b) Rear wheel brake shoes -08 Nos. (c) Wheel bearing inner -02 Nos. (d) Wheel bearing outer -02 Nos. (e) Wheel cylinder kit -01 No. (f) Brake plate assly -01 No. (g) Brake pad assembly -04 Nos.(h) Brake lining-01 No 109 Master cylinder complete 110 Repair/replacement of electronic motorized fuel pump assembly incl dismentling of old unsv complete all as specified and directed. 111 Opening steering assembly, removing stearing rack, lathe work, facing, ramming including replacing the following items:-(a) Centre pin bush -02 Nos. (b) Centre bearing assly -01 No. (c) Link rod repair kit, (d) Check nut -02 No. (e) Lower stearing oil -01 Ltr. 112 Floor matting best quality 113 Foot mat 114 Tata Indigo 115 Servicing and Repair/Maintenanceof Vehicles- Tata Indigo car two times at interval of five months comprising checking and repair/replacement of unserviceable spares ofengine ,self starter , gear box FIP (Fuel Injector Pump), shaft,shocker and suspension system ,braking system inlcuding brake shoe ,Radiator cleaning, replacement of all type offilters and greasing of all wheels, Wheel alignment and wheel balancing by computerized Machine including tyre rotationetcofVehicles including dismantling/ Replacingof defective parts with new parts at workshopcomplete all as specifiedand directed by Engr in charge Note :-1. Spare parts shall be measured and paid separatly under relevant items here in after but fixing of the same deemed to be included in unit rate.2.Cost of Engine Oil included in quoted rate. 3. Cost of Brake oil, gear oil,diffrential oil and coolant inluded in quoted rate.4 Servicing of vehicle shall be carried out at authorised workshop only.5.Other minor consumable items like nut bolts washer , cotton waste etc are deemed to be included in the quoted rate 116 Oil filter, Fuel Filter and air filter set of three complete 117 Filter element 118 Clutch and pressure plate set , including clutch cylinder , Clutch bearing completeMake -C K or eqlt 119 Head light assembly complete with connection . Make -Autopal, Helonix,Lumax 120 Head light bulb Helogen 12 volt 60 wattMake -Autopal,Helonix 121 Head light Relay 122 Break/ Back light Assy Make -Autopal, K K 123 Indicator AssyMake -Autopal, K K 124 Fog lamp 125 Wipper Assy withblade complete make -Syndicate,Champion etc 126 Replace ofFront glass/roof top rubber beading complete 127 Repair to Door /Windowglass with replacement of rubber beading complete 128 Door Lock assembly Make -Syndicate,ATS 129 Water pump assembly 130 Side lookingmirror of side doors of best quality 131 Fan v belt Make -Fenner 132 Star Box Cover 133 Car Freshner 134 Parking Light Bulb 135 Bracket 136 Tissue Paper box 137 Perfume 138 Radiator cleaning fluid bottle 139 Coolant bottle with pipe 140 Silencer packing 141 Floor matting best quality 142 Supply and fixing of foot mat 143 M & L for rewinding of self starter ofVehicles withsuper enamelled insulating copper wire of existing gauge , insulating materials including assembling and testing complete all as specified and directed by Opening and dismantling of self starter, and replacing with following items.(a) Carbon brushes -01 Set (b) Solenoid Switch -01 No (c) bendix -01 No (d) Fly wheel -01 No (as per sample). 144 M & L for repair of suspension system by Dismantling front wheel and wheel joint upper and Lower of suspension system, leaf springs ,reassembling and testing after repair including replacement of following items:- (a) Suspension Kit -01 Kit, (b) Lower arm bush -08 Nos. (c) Upper arm bush -04 Nos. (d) Wheel joint upper -02 Nos. (e) Wheel joint lower -02 Nos. (f) Coil spring pad -02 Nos. (g) Tie rod end -04 Nos. (h) Upper arm bolt -02 Nos. (j) Kamani bush front -01 No. (k) Penion bearing -02 Nos. (l) Penion -01 No. (m) UJ Cross -01 No. testing complete all as specified and directed 145 Repair of Wheels and braking system including servicing and testingof master and slave cylinder by Dismantling front and rear wheels, greasing, brake work including replacing the following items:-(a) Brake pad front wheel -04 Nos. (b) Rear wheel brake shoes -08 Nos. (c) Wheel bearing inner -02 Nos. (d) Wheel bearing outer -02 Nos. (e) Wheel cylinder kit -01 No. (f) Brake plate assly -01 No. (g) Brake pad assembly -04 Nos.(h) Brake lining-01 No 146 Master cylinder complete 147 Repair/replacement of electronic motorized fuel pump assembly incl dismentling of old unsv complete all as specified and directed. 148 Opening steering assembly, removing stearing rack, lathe work, facing, ramming including replacing the following items:-(a) Centre pin bush -02 Nos. (b) Centre bearing assly -01 No. (c) Link rod repair kit, (d) Check nut -02 No. (e) Lower stearing oil -01 Ltr. 149 Repair to gear box including bush repair/repalce and greesing etc. Complete. 150 Replacement of rusted/ damaged seat/seat cover complete all as specified and directed 151 Denting of certain places of bumper/body, removing dents, painting 2 coat of spray paint to matching existing surfaces. 152 Maruti Gypsy and ECO 153 Servicing and Repair/Maintenanceof Vehicles- Maruti Gypsy MPFI and ECHO each two times at interval of five months comprising checking and repair/replacement of unserviceable spares ofengine ,self starter , gear box FIP (Fuel Injector Pump), shaft,shocker and suspension system ,braking system inlcuding brake shoe ,Radiator cleaning, replacement of all type offilters and greasing of all wheels, Wheel alignment and wheel balancing by computerized Machine including tyre rotationetcofVehicles including dismantling/ Replacingof defective parts with new parts at workshopcomplete all as specifiedand directed by Engr in charge Note :-1. Spare parts shall be measured and paid separatly under relevant items here in after but fixing of the same deemed to be included in unit rate.2.Cost of Engine Oilincluded in quoted rate and supplied by the contractor.3. Cost ofBrake oil, gear oil,diffential oil and coolant included in quoted rate. 4.Other minor consumable items like nut bolts washer , cotton waste etc are deemed to be included in the quoted rate 154 Fuel Filter, Oil Filter and Air Filter set of three complete 155 Clutch and pressure plate set including clutch bearing and clutch cylinder,Clutch Paddle completeMake -C K or eqlt 156 Head light assembly complete with connection. Make -Autopal, Helonix,Lumax 157 Head light Relay 158 Break/ Back light Assy Make -Autopal, K K 159 Indicator AssyMake -Autopal, K K 160 Fog lamp 161 Wipper Assy withblade complete make -Syndicate,Champion etc 162 Spark Plug 163 Replace ofFront glass/roof top rubber beading complete 164 Repair to Door /Windowglass with replacement of rubber beading complete 165 Door Lock assembly Make -Syndicate,ATS 166 Water pump assembly 167 Side lookingmirror of side doors of best quality 168 Fan v belt Make -Fenner 169 Parking Light Bulb 170 Perfume 171 Radiator cleaning fluid bottle 172 Coolant bottle with pipe 173 Silencer packing 174 Cable and Lugs 175 Air Pipe 176 PVC side bumpers 177 M & L for rewinding of self starter ofVehicles withsuper enamelled insulating copper wire of existing gauge , insulating materials including assembling and testing complete all as specified and directed by Opening and dismantling of self starter, and replacing with following items.(a) Carbon brushes -01 Set (b) Solenoid Switch -01 No (c) bendix -01 No (d) Fly wheel -01 No (as per sample). 178 M & L for repair of suspension system by Dismantling front wheel and wheel joint upper and Lower of suspension system, leaf springs ,reassembling and testing after repair including replacement of following items:- (a) Suspension Kit -01 Kit, (b) Lower arm bush -08 Nos. (c) Upper arm bush -04 Nos. (d) Wheel joint upper -02 Nos. (e) Wheel joint lower -02 Nos. (f) Coil spring pad -02 Nos. (g) Tie rod end -04 Nos. (h) Upper arm bolt -02 Nos. (j) Kamani bush front -01 No. (k) Penion bearing -02 Nos. (l) Penion -01 No. (m) UJ Cross -01 No. testing complete all as specified and directed 179 Repair of Wheels and braking system including servicing and testingof master and slave cylinder by Dismantling front and rear wheels, greasing, brake work including replacing the following items:-(a) Brake pad front wheel -04 Nos. (b) Rear wheel brake shoes -08 Nos. (c) Wheel bearing inner -02 Nos. (d) Wheel bearing outer -02 Nos. (e) Wheel cylinder kit -01 No. (f) Brake plate assly -01 No. (g) Brake pad assembly -04 Nos.(h) Brake lining-01 No 180 Master cylinder complete 181 Repair/replacement of electronic motorized fuel pump assembly incl dismentling of old unsv complete all as specified and directed. 182 Opening steering assembly, removing stearing rack, lathe work, facing, ramming including replacing the following items:-(a) Centre pin bush -02 Nos. (b) Centre bearing assly -01 No. (c) Link rod repair kit, (d) Check nut -02 No. (e) Lower stearing oil -01 Ltr. 183 Repair to gear box including bush repair/repalce and greesing etc. Complete. 184 Roof cover best quality including stitching work and fixing complete 185 Floor matting best quality 186 Supply and fixing of foot mat 187 Replacement of rusted/ damaged seat/seat cover complete all as specified and directed 188 Denting of certain places of bumper/body, removing dents, painting 2 coat of spray paint to matching existing surfaces. 189 Staff Cars -Maruti 190 Servicing and Repair/Maintenanceof Vehicles- Maruti SX4/Maruti Omini/ Maruti Swift Dzire/Maruti Dzire each two times at interval of five months comprising checking and repair/replacement of unserviceable spares ofengine ,self starter , gear box FIP (Fuel Injector Pump), shaft,shocker and suspension system ,braking system inlcuding brake shoe ,Radiator cleaning, replacement of all type offilters and greasing of all wheels, Wheel alignment and wheel balancing by computerized Machine including tyre rotationetcofVehicles including dismantling/ Replacingof defective parts with new parts at workshopcomplete all as specifiedand directed by Engr in charge Note :-1. Spare parts shall be measured and paid separatly under relevant items here in after but fixing of the same deemed to be included in unit rate.2. Cost of Engine oil (5W40)suitable for veh consuming 87MT gas as fuel , Brake oil, gear oil ,steering oil and coolant included in quoted rate. 3 Servicing of vehicle shall be carried out at authorised workshop only.4.Other minor consumable items like nut bolts washer , cotton waste etc are deemed to be included in the quoted rate 191 Oil filter, Fuel Filter and Air filter set of three complete 192 Filter element 193 Fan belt 194 Clutch and pressure plate set including clutch bearing and clutch cylinder,Clutch Paddle completeMake -C K or eqlt 195 Head light assembly complete with Bulb and connection complete . Make -Autopal, Helonix,Lumax 196 Head light bulb Helogen 12 volt 60 wattMake -Autopal,Helonix 197 Head light Relay 198 Break/ Back light Assy Make -Autopal, K K 199 Indicator AssyMake -Autopal, K K 200 Cabin light assembly 201 Fog lamp assembly 202 Wipper Assy withblade complete make -Syndicate,Champion etc 203 odometer 204 Replace ofFront glass/roof top rubber beading complete 205 Repair to Door /Windowglass with replacement of rubber beading complete 206 Door Lock assembly Make -Syndicate,ATS 207 Water pump assembly 208 Side lookingmirror of side doors of best quality 209 Star Box Cover 210 Steering/Gear handle Cover 211 Parking Light Bulb 212 Bracket 213 Radiator cleaning fluid bottle 214 Coolant bottle with pipe 215 Silencer packing 216 Cable and Lugs 217 Mud pad of best quality 218 Wheel Cover set 219 Dashboard Lock/Fuel Tank Lock 220 Air Pipe 221 Tissue Paper box 222 Tyre Polish 223 Dashboard Polish 224 Car Freshner 225 Car Polish 226 Perfume 227 Hand Towels 228 M & L for rewinding of self starter ofVehicles withsuper enamelled insulating copper wire of existing gauge , insulating materials including assembling and testing complete all as specified and directed by Opening and dismantling of self starter, and replacing with following items.(a) Carbon brushes -01 Set (b) Solenoid Switch -01 No (c) bendix -01 No (d) Fly wheel -01 No (as per sample). 229 M & L for Servicing of air conditioning including repalcement of Cabin Air filter and charging of refrigerant including electrical works complete all as specified and as directed 230 M & L for repair of suspension system by Dismantling front wheel and wheel joint upper and Lower of suspension system, leaf springs ,reassembling and testing after repair including replacement of following items:- (a) Suspension Kit -01 Kit, (b) Lower arm bush -08 Nos. (c) Upper arm bush -04 Nos. (d) Wheel joint upper -02 Nos. (e) Wheel joint lower -02 Nos. (f) Coil spring pad -02 Nos. (g) Tie rod end -04 Nos. (h) Upper arm bolt -02 Nos. (j) Kamani bush front -01 No. (k) Penion bearing -02 Nos. (l) Penion -01 No. (m) UJ Cross -01 No. testing complete all as specified and directed 231 Repair of Wheels and braking system including servicing and testingof master and slave cylinder by Dismantling front and rear wheels, greasing, brake work including replacing the following items:-(a) Brake pad front wheel -04 Nos. (b) Rear wheel brake shoes -08 Nos. (c) Wheel bearing inner -02 Nos. (d) Wheel bearing outer -02 Nos. (e) Wheel cylinder kit -01 No. (f) Brake plate assly -01 No. (g) Brake pad assembly -04 Nos.(h) Brake lining-01 No 232 Master cylinder complete 233 Repair/replacement of electronic motorized fuel pump assembly incl dismentling of old unsv complete all as specified and directed. 234 Opening steering assembly, removing stearing rack, lathe work, facing, ramming including replacing the following items:-(a) Centre pin bush -02 Nos. (b) Centre bearing assly -01 No. (c) Link rod repair kit, (d) Check nut -02 No. (e) Lower stearing oil -01 Ltr. 235 Repair to gear box including bush repair/repalce and greesing etc. Complete. 236 Floor matting best quality 237 Supply and fixing of foot mat 238 Replacement of rusted/ damaged seat/seat cover complete all as specified and directed 239 Denting of certain places of bumper/body, removing dents,incl painting of complete vehicle with 2 coat of spray paint ,all army signs as directed by JE/Engr-in-charge, complete all as spcd and directed.Note: Cost of paint incl in quoted rates. 240 S&F in replacement of AC compressor 507 of capacity 20 HP suitable for SX4/Dzire car ,complete all as spcd and directed. 241 S&F in replacement of cooling coil and blower, complete set incl wiring complete, suitable for SX4/Dzire car ,complete all as spcd and directed. 242 Motor Cycle Royal Enfield 350 CC/Hero 243 Servicing and Repair/Maintenanceof Vehicles- Motor cycle Royal Enfield 350 CC two times at interval of five months comprising checking and repair/replacement of unserviceable spares ofengine,gear box, FIP(Fuel Injector Pump),suspension system ,braking system , Chain and chain cover, Kick Assembly, replacement of filters and greasing of all wheels,ofVehicles including dismantling/ Replacingof defective parts with new parts at work shopcomplete all as specifiedand directed by Engr in charge Note :-1. Spare parts shall be measured and paid separatly under relevant items here in after but fixing of the same deemed to be included in unit rate.2.Cost of Engine Oilincluded in quoted rate.3. Cost of Brake oil, gear oil included in quoted rate. 4.Other minor consumable items like nut bolts washer , cotton waste etc are deemed to be included in the quoted rate.5.Cost of fuel filter and air filter included in quoted rate. 244 Ditto- but for Motor cycle -Hero/ Baja Platina 245 Brake shoe 246 Clutch plate 247 Brake cable 248 Accelerater Cable 249 Clutch wire cable 250 Head light assly 251 Kick Housing with bearing 252 Shock observer rear and front 253 Chain andsocket 254 Condenser 255 Spark Plug 256 Indicating assly 257 Speedometer assembly 258 Horn complete assembly 259 Speedometer Cable 260 Back light assembly 261 Lock and key of fuel tank & luggage/dak box 262 Labour charge for seat repairincluding replacement of seat cover complete all as specified and directed parts 263 S&F retrading of tyre Eicher/TATA 207 complete all as specified and directed 264 S&F Battery 12 volt 80 AH complete all as specified and directed. 265 S&F starter threee phase suitable for 5 HP three phase motor, complete all as spcd and directed. 266 Notes:- Tenderers may note that amount as given in schedule of credit will be deducted from the total amount to worked out the net contract sum at the time of Acceptance of tender.