| 1 | Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material / irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. (Average filling depth 150 mm),includingall labour, usage charges of machinery, lead, lifts, loading, unloading transporting etc., complete. |
| 2 | From Km 30.75 to 36.50 of NH-169A and from Km.124.00 to 153.00 of NH-169 (As per Detailed Estimate) |
| 3 | Removal of earth from the choked hill side drain and disposing it on the valley side manually,includingall labour, lead, lifts, loading, unloading ,transporting etc., complete |
| 4 | From Km 30.75 to 36.50 of NH-169A and from Km.124.00 to 153.00 of NH-169 (As per Detailed Estimate) |
| 5 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials by (Tractor) and stacking of serviceable material to be used or auctioned, up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness including all labour, hire charges of all machineries etc., complete (For new road) - In area of light jungle by Mechanical means |
| 6 | From Km 30.75 to 36.50 of NH-169A and from Km.124.00 to 153.00 of NH-169 (As per Detailed Estimate) |
| 7 | Providing and erecting a \"W\" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811, including cost of all materialsall labour, lead, lifts, loading, unloading transporting etc., complete. Type - A, \"W\" : Metal Beam Crash Barrier |
| 8 | From Km 30.75 to 36.50 of NH-169A and from Km.124.00 to 153.00 of NH-169 (As per Detailed Estimate) |
| 9 | BILL NO.2: Emergency Works |
| 10 | Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side, includingall labour, lead, lifts, loading, unloading, transporting etc., complete.Note : Landslide Clearance involves pushing of loose earth slided on the road surface from hill side face on the valley side. Since no cutting of original ground is involved, the output of dozer has been taken as 60 cum per hour for soil, ordinary rock and blasted hard rock. However if there are objections to disposing of earth on valley side, additional resources for its disposal shall be considered as per site conditions. |
| 11 | From Km 30.75 to 36.50 of NH-169A and from Km.124.00 to 153.00 of NH-169 (As per Detailed Estimate) |
| 12 | BILL NO -3 : PERFORMANCE BASED PAVEMENT REPAIR & ROAD MAINTENANCE |
| 13 | Routine Maintenance of road assets and pavement as given below:(i) Clearing and grubbing road land(ii) Repair of potholes/edge cuts/ruts/ patches (iii) Carrying out cleaning, removing of dust/silt/thrash from carriageway.(iv) Cleaning, clearing and repairing roadside open/unlined/lined/covered drains and cross drainage works(v) maintenance of road signs and delineators |
| 14 | IL in Km 30.75to Km 51.60 of NH-169A |
| 15 | SL in Km 124.00 to Km 141.00 of NH-169 |
| 16 | IL in Km 141.00 to Km 153.00 of NH-169 |