|
| 1 | Excavation of foundation in ordinary soil loam, clay and sand including lift upto 1.50 m. and lead 30.0 m. including filling, watering and ramming of excavated earth into space between building and side of foundation trenches etc. all complete as per D.S.R. No.-2.8.1 |
| 2 | Providing and Laying cement concrete in 1:5:10 with cement, coarse sand and 40 mm stone ballast including supply of all the materials, labour and T & P etc. all complete as per D.S.R. No.-4.1.10 |
| 3 | R.C.C. work in 1:1.5:3 with cement, coarse sand and 20 mm stone grit in pillars including supply of all the materials, labour and T & P etc. all complete as per D.S.R. No.-4.2.2 |
| 4 | Centering and Shuttering including strutting, propping etc. all complete for foundations, footings, bases of columns as per D.S.R. No.-4.3.1 |
| 5 | Mild Steel or Iron Work in the reinforcement including cutting, bending and binding etc. all complete as per D.S.R. No.-5.22.1 |
| 6 | M-150 class brick work in 1:6 with cement and coarse sand mortar in the foundation and plinth including supply of all the materials, labour and T & P etc. all complete as per D.S.R. No.-6.1.2 |
| 7 | R.C.C. work in 1:1.5:3 with cement, coarse sand and 20 mm stone grit in plinth beam including supply of all the materials, labour and T & P etc. all complete as per D.A.R. No.-5.2.2 |
| 8 | Centering and Shuttering including strutting, propping etc. all complete for foundations, footings, bases of columns as per D.S.R. No.-5.9.1 |
| 9 | Mild Steel or Iron Work in the reinforcement including cutting, bending and binding etc. all complete as per D.S.R. No.-5.22.1 |
| 10 | M-150 class brick work in 1:6 with cement and coarse sand mortar in super structure including supply of all the materials, labour and T & P etc. all complete as per D.S.R. No.-6.4.2 |
| 11 | R.C.C. work in 1:1.5:3 with cement, coarse sand and 20 mm stone grit in pillars including supply of all the materials, labour and T & P etc. all complete as per D.A.R. No.-5.2.2 |
| 12 | Centering and Shuttering including strutting, propping etc. all complete for foundations, footings, bases of columns as per D.S.R. No.-5.9.1 |
| 13 | Mild Steel or Iron Work in the reinforcement including cutting, bending and binding etc. all complete as per D.S.R. No.-5.22.1 |
| 14 | R.C.C. work in 1:1.5:3 with cement, coarse sand and 20 mm stone grit in top beam including supply of all the materials, labour and T & P etc. all complete as per D.A.R. No.-5.3 |
| 15 | Centering and Shuttering including strutting, propping etc. all complete for lintel beams, plinth beams, griders, bressumers and cantielevers as per D.S.R. No.-5.9.5 |
| 16 | Mild Steel or Iron Work in the reinforcement including cutting, bending and binding etc. all complete as per D.S.R. No.-5.22.1 |
| 17 | 12 mm thick plastering in 1:4 with cement and coarse sand mortar including supply of all the materials, labour and T & P etc. all complete as per D.S.R. No.-13.4.1 |
| 18 | 12 mm thick plastering in 1:6 with cement and coarse sand mortar including supply of all the materials, labour and T & P etc. all complete as per D.S.R. No.-13.4.2 |
| 19 | Providing and Applying White Cement Based Putty of average thickness of 1 mm of approved brand and manufacture over the plastered wall surface etc. all complete as per D.S.R. No.-13.80 |
| 20 | Finishing Wall with Water Proofing Cement Paint of approved make new work with three coats to give an even shade and including supply of all the materials, labour and T & P etc. all complete as per D.S.R. No.-13.47.1 |
| 21 | Earth Filling in plith including supply of necessary quantity of the earth embankment to be 200 mm layers including ramming and dressing surface to required levels etc. all complete as per D.S.R. No.-2.25 (a) |
| 22 | Provision of the Inorgation Stone including fixing, writing and painting etc. all complete |
| 23 | Excavation of foundation in ordinary soil loam, clay and sand including lift upto 1.50 m. and lead 30.0 m. including filling, watering and ramming of excavated earth into space between building and side of foundation trenches etc. all complete as per D.S.R. No.-2.8.1 |
| 24 | Providing and Laying cement concrete in 1:5:10 with cement, coarse sand and 40 mm stone ballast including supply of all the materials, labour and T & P etc. all complete as per D.S.R. No.-4.1.10 |
| 25 | R.C.C. work in 1:1.5:3 with cement, coarse sand and 20 mm stone grit in pillars including supply of all the materials, labour and T & P etc. all complete as per D.S.R. No.-4.2.2 |
| 26 | Centering and Shuttering including strutting, propping etc. all complete for foundations, footings, bases of columns as per D.S.R. No.-4.3.1 |
| 27 | Mild Steel or Iron Work in the reinforcement including cutting, bending and binding etc. all complete as per D.S.R. No.-5.22.1 |
| 28 | M-150 class brick work in 1:6 with cement and coarse sand mortar in the foundation and plinth including supply of all the materials, labour and T & P etc. all complete as per D.S.R. No.-6.1.2 |
| 29 | R.C.C. work in 1:1.5:3 with cement, coarse sand and 20 mm stone grit in plinth beam including supply of all the materials, labour and T & P etc. all complete as per D.A.R. No.-5.2.2 |
| 30 | Centering and Shuttering including strutting, propping etc. all complete for foundations, footings, bases of columns as per D.S.R. No.-5.9.1 |
| 31 | Mild Steel or Iron Work in the reinforcement including cutting, bending and binding etc. all complete as per D.S.R. No.-5.22.1 |
| 32 | R.C.C. work in 1:1.5:3 with cement, coarse sand and 20 mm stone grit in pillars including supply of all the materials, labour and T & P etc. all complete as per D.A.R. No.-5.2.2 |
| 33 | Centering and Shuttering including strutting, propping etc. all complete for foundations, footings, bases of columns as per D.S.R. No.-5.9.1 |
| 34 | Mild Steel or Iron Work in the reinforcement including cutting, bending and binding etc. all complete as per D.S.R. No.-5.22.1 |
| 35 | R.C.C. work in 1:1.5:3 with cement, coarse sand and 20 mm stone grit in lintal beam including supply of all the materials, labour and T & P etc. all complete as per D.S.R. No.-5.3 |
| 36 | Centering and Shuttering including strutting, propping etc. all complete for lintel beams, plinth beams, griders, bressumers and cantielevers as per D.S.R. No.-5.9.5 |
| 37 | Mild Steel or Iron Work in the reinforcement including cutting, bending and binding etc. all complete as per D.S.R. No.-5.22.1 |
| 38 | M-150 class brick work in 1:6 with cement and coarse sand mortar in super structure including supply of all the materials, labour and T & P etc. all complete as per D.S.R. No.-6.4.2 |
| 39 | R.C.C. work in 1:1.5:3 with cement, coarse sand and 20 mm stone grit in pillars including supply of all the materials, labour and T & P etc. all complete as per D.S.R. No.-5.2.2 |
| 40 | Centering and Shuttering including strutting, propping etc. all complete for foundations, footings, bases of columns as per D.S.R. No.-5.9.1 |
| 41 | Mild Steel or Iron Work in the reinforcement including cutting, bending and binding etc. all complete as per D.S.R. No.-5.22.1 |
| 42 | R.C.C. work in 1:1.5:3 with cement, coarse sand and 20 mm stone grit in beams on slab level including supply of all the materials, labour and T & P etc. all complete as per D.S.R. No.-5.3 |
| 43 | Centering and Shuttering including strutting, propping etc. all complete for lintel beams, plinth beams, griders, bressumers and cantielevers as per D.S.R. No.-5.9.5 |
| 44 | Mild Steel or Iron Work in the reinforcement including cutting, bending and binding etc. all complete as per D.S.R. No.-5.22.1 |
| 45 | R.C.C. work in 1:1.5:3 with cement, coarse sand and 20 mm stone grit in slab including supply of all the materials, labour and T & P etc. all complete as per D.A.R. No.-5.3 |
| 46 | Centering and Shuttering including strutting, propping etc. all complete for suspended floors, roofs, landings, balconies and access platerorm as per D.S.R. No.-5.9.3 |
| 47 | Mild Steel or Iron Work in the reinforcement including cutting, bending and binding etc. all complete as per D.S.R. No.-5.22.1 |
| 48 | 12 mm thick plastering in 1:6 with cement and coarse sand mortar including supply of all the materials, labour and T & P etc. all complete as per D.S.R. No.-13.4.2 |
| 49 | Earth Filling in plith including supply of necessary quantity of the earth embankment to be 200 mm layers including ramming and dressing surface to required levels etc. all complete as per D.S.R. No.-2.25 (a) |
| 50 | Providing and Laying 600 x 600 mm Vetrified Floor Tiles over 20 mm thick base of cement mortar in 1:4 with cement and coarse sand mortar laid over the jointed with grey cement slurry mixed with pigment to match shade of tiles complete light shades using white cement including supply of all the materials, labour and T & P etc. all complete as per D.S.R. No.-11.47.2 |
| 51 | Providing and Laying 1st Quality Ceramic Glazed Wall Tiles confirming to the IS:15622 (thickness to be specified by the manufacture) of approved make in all colours, shades expect burgundy, bottle, green, black of any size as approved by the Engineer-In-Charge in the skirting,risers of steps and dados over 12 mm thick bed of cement mortar in 1:3 with cement and coarse sand mortar and jointing with the grey cement slurry @ 3.30 Kg. per Sqm and including supply of all the materials, labour and T & P etc. all complete as per D.S.R. No.-8.31 |
| 52 | Providing and Applying White Cement Based Putty of average thickness of 1 mm of approved brand and manufacture over the plastered wall surface etc. all complete as per D.S.R. No.-13.80 |
| 53 | Finishing Wall with Water Proofing Cement Paint of approved make new work with three coats to give an even shade and including supply of all the materials, labour and T & P etc. all complete as per D.S.R. No.-13.47.1 |
| 54 | Interlocking Earth Work in embankment in ordinary soil excavation to be done from of regular pits 20 cm. layers including ramming and dressing pulverization surface to required levels and slope directed by Engineer-In-Charge |
| 55 | Excavation of foundation in ordinary soil loam, clay and sand including lift upto 1.50 m. and lead 30.0 m. including filling, watering and ramming of excavated earth into space between building and side of foundation trenches etc. all complete |
| 56 | Providing and Laying cement concrete in 1:6:12 with cement, coarse sand and 40 mm brick ballast including supply of all the materials, labour and T & P etc. all complete |
| 57 | M-150 class brick work in 1:4 with cement and coarse sand mortar in foundation and plinth including supply of all the materials, labour and T & P etc. all complete |
| 58 | 15 mm thick plastering in 1:4 with cement and coarse sand mortar including supply of all materials, labour and T & P etc. all complete |
| 59 | Providing and Laying of plain cement concrete in 1:2:4 with cement, coarse sand and 20 mm stone grit including supply of all the materials, labour and T & P etc. all complete |
| 60 | Supply and Laying of the 80 mm thick I shaped mechanically compressed interlocking C.C. pavers block manufactured by high pressure and controlled vibration machine having plane dimension 200 x (160+120 mm) with minimum 5 mm topping of O.P. cement mixed with 25% marble powder than 30 Mpa and 4.5 Kg/No. including supply of all the labour, material and T & P etc. required for proper completion of work as directed by Engineer-In-Charge but excluding U.P.T.T. which shall be paid extra as per rules |
| 61 | Add 18% GST |