Tender For Restoration Of Road From Mian More To Chowki Dum Sub Division Mendhar Tehsil Mendhar District Poonch (2Nd Call)
Tender Value
60 Lakhs
Estimated cost
Bid Submission
27 Sep 2025
0 days left
EMD
1.20 Lakhs
Bank guarantee accepted
Document Fee
1600
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
mendhar → Jammu And Kashmir
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender For Restoration Of Road From Mian More To Chowki Dum Sub Division Mendhar Tehsil Mendhar District Poonch (2Nd Call)
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:.1 All kinds of soil : |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 4 | Stone Filling in wire crates including cost of wire crates and all carriages upto site complete job |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for:.1 Foundations, footings, bases for columns |
| 6 | Dumping stone including cost of stones.1 in Horizontal on level behind R/wall including carriages |
| 7 | Carriage of material by mechanical transport including loading/unloading and stacking complete.Sand lead upto 50 kms avg. |
| 8 | Carriage of material by mechanical transport including loading/unloading and stacking complete.Stone agg below 40 mm lead upto 20 kms avg. |
| 9 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:.1 All kinds of soil : |
| 10 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 11 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 12 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc.complete. 50 mm thick with 20mm nominal size stone aggregate |
| 13 | Centering and shuttering including strutting, propping etc. and removal of form work for:.1 Foundations, footings, bases for columns |
| 14 | Carriage of material by mechanical transport including loading/unloading and stacking complete.Sand lead upto 50 kms avg. |
| 15 | Carriage of material by mechanical transport including loading/unloading and stacking complete.Stone agg below 40 mm lead upto 20 kms avg. |
| 16 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:.1 All kinds of soil : |
| 17 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 18 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 19 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level andcuring complete with: 1 Cement mortar 1:6 (1 Cement : 6 coarse sand) |
| 20 | Dry random rubble masonry with hard stone in foundation and plinth Without bond stone |
| 21 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc.complete. 50 mm thick with 20mm nominal size stone aggregate |
| 22 | Centering and shuttering including strutting, propping etc. and removal of form work for:.1 Foundations, footings, bases for columns |
| 23 | Carriage of material by mechanical transport including loading/unloading and stacking complete.Sand lead upto 50 kms avg. |
| 24 | Carriage of material by mechanical transport including loading/unloading and stacking complete.Stone agg below 40 mm lead upto 20 kms avg. |
| 25 | Carriage of material by mechanical transport including loading/unloading and stacking complete.Stone lead upto 05 kms avg. |
| 26 | Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil: |
| 27 | Supplying and stacking at site1 Graded crushed stone aggregate of size 63 mm to 45 mm |
| 28 | Supplying and stacking at site1 Graded crushed stone aggregate of size 53 mm to 22.04 mm |
| 29 | Supplying and stacking at siteStone screening of size 11.2 mm nominal size (Type B) |
| 30 | Supplying and stacking at site Moorum |
| 31 | Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to propergrade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate, watering and compacting to the required density. |
| 32 | Providing and laying River Bed Meterials including carriages upto site complete job |
| 33 | Carriage of material by mechanical transport including loading/unloading and stacking complete.Stone agg below 40 mm lead upto 08 kms avg. |
| 34 | Carriage of material by mechanical transport including loading/unloading and stacking complete.Stone agg above 40 mm lead upto 08 kms avg. |
| 35 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:.1 All kinds of soil : |
| 36 | Stone Filling in wire crates including cost of wire crates and all carriages upto site complete job |
| 37 | Dumping stone including cost of stones.1 in Horizontal on level behind R/wall including carriages |
| 38 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:.1 All kinds of soil : |
| 39 | Stone Filling in wire crates including cost of wire crates and all carriages upto site complete job |
| 40 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:.1 All kinds of soil : |
| 41 | Stone Filling in wire crates including cost of wire crates and all carriages upto site complete job |
| 42 | Dumping stone including cost of stones.1 in Horizontal on level behind R/wall including carriages |
AI Tender Summary
Tender Timeline
Sep 22, 2025
11:30 IST
Tender Published
Tender notice published.
CompletedSep 27, 2025
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedSep 29, 2025
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender