| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 13-10-2025 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 20-10-2025 |
| 2 | 03-10-2025 | CORRIGENDUM | BOQ | 08-10-2025 |
| 3 | 03-10-2025 | CORRIGENDUM 01 | Date | 13-10-2025 |
| Sl. No. | Item Description |
| 1 | Uninstalling and dismantling the pump ,descaling and cleaning of all parts for inspection andCarefully assembling the pumps by using existing serviceable parts including replacement of gasket packings, greasing etc and replacement of unserviceable parts as directed, installed atNew Raw water Pump House, checking the serviceability. Make Kirloskar, ModelDSM 150/46 (180HP).Note : (i) Spare parts required for replacement shall be measured and paid separately under respective item 03 to 20 here-in-after and labour element includedin this item for replacementin the BOQ.(ii)Decoupling carefully the pumps from electric motor, taking out from foundation & transporting pump body to workshop for necessary machine works & re-installing the pump to its original position shall be measured & paid for separately under respective items in BOQ. (iii)Thejob to be completed within 8 hrs from time of assignment to avoid interruption of Essential service on account of breakdown else contractor is liable for penalty as decided by Accepting Officer .(iv) The rate of repairing of gland packing work is measured and paid separately under respective item in theBOQ. |
| 2 | Lathe/ Machining worksof any type at workshop required for balancing the impeller, fixing of new parts to existing shafts required for proper setting and smooth functioning to achieve desired discharge of the pump complete all as specified and directed. |
| 3 | Supply only grease of suitable grade for spare parts of pumps complete all as specified and directed. Make: INDIAN OIL SERVO MP-3 or equivalent in HP. |
| 4 | Supply only Polytetrafluoroethylene (PTFE) (Teflon) gland packing 6 to 24mm mm suitable for any size of pumps complete all as specified and directed. |
| 5 | Supply only BrassImpeller, 1st stage suitable for DSM 150/46 Kirloskar pump (180 HP) under item No 1 above. |
| 6 | Supply only Brass Impeller, 2nd stage, suitable for DSM 150/46 Kirloskar pump under item No 1 above. |
| 7 | Supply only Ball bearing, DE, suitable for DSM 150/46 Kirloskar pump under item No 1 above. |
| 8 | Supply only ball bearing, NDE,suitable for DSM 150/46 Kirloskar pump under item No 1 above. |
| 9 | Supply only bearing coversuitable for DSM 150/46 Kirloskar pump under item No 1 above. |
| 10 | Supply only bearing capfor DSM 150/46 Kirloskar pump under item No 1 above. |
| 11 | Supply only pump Shaftsuitable for DSM 150/46 Kirloskar pump under item No 1 above. |
| 12 | Supply only wear ringsuitable for DSM 150/46 Kirloskar pump under item No 1 above. |
| 13 | Supply only shoulder ringsuitable for DSM 150/46 Kirloskar pump under item No 1 above. |
| 14 | Supply only Inter staging ringsuitable for DSM 150/46 Kirloskar pump under item No 1 above. |
| 15 | Supply only CI gland coverfor DSM 150/46 complete all as specified and directed |
| 16 | Supply only shaft Sleeve suitable for DSM 150/46 Kirloskar pump under item No 1 above. |
| 17 | Supply only shaft Sleeve nut suitable for DSM 150/46 Kirloskar pump under item No 1 above. |
| 18 | Supply only lock nut suitable for DSM 150/46 Kirloskar pump under item No 1 above. |
| 19 | Supply only Graphite gland packing 12Sqmm for DSM 150/46 |
| 20 | Supply only set of rubber \"O\" ring for DSM 150/46 Kirloskar pump under item No 1 above. |
| 21 | Ditto all as per item No 1 above herein but capacity of pump set make: Kirloskar, type DSM100/36(100 HP), installed at Old Raw water Pump House.Note : (i) Spare parts required for replacement shall be measured and paid separately under respective item No 22 to 37 here-in-after and labour element includedin this item for replacementin the BOQ. |
| 22 | Supply only CI impeller, 1st stage for DSM 100/36, Kirloskar pump under item No 21 above. |
| 23 | Supply only CI Impeller, 2nd stage, for DSM 100/36Kirloskar pump under item No 21 above. |
| 24 | Supply only Ball bearing, DE,for DSM 100/36Kirloskar pump under item No 21 above. |
| 25 | Supply only Ball bearing, NDE,for DSM 100/36Kirloskar pump under item No 21 above. |
| 26 | Supply only Bearing cover DE/NDE for DSM 100/36Kirloskar pump under item No 21 above. |
| 27 | Supply only Bearing cap for DSM 100/36Kirloskar pump under item No 21 above. |
| 28 | Supply only Pump Shaft for DSM 100/36Kirloskar pump under item No 21 above. |
| 29 | Supply only Wear ringfor DSM 100/36Kirloskar pump under item No 21 above. |
| 30 | Supply only Shoulder ring for DSM 100/36Kirloskar pump under item No 21 above. |
| 31 | Supply only Inter staging ring for DSM 100/36Kirloskar pump under item No 21 above. |
| 32 | Supply only Gland cover for DSM 100/36Kirloskar pump under item No 21 above. |
| 33 | Supply only Shaft Sleeve for DSM 100/36Kirloskar pump under item No 21 above. |
| 34 | Supply only Shaft Sleeve nut for DSM 100/36Kirloskar pump under item No 21 above. |
| 35 | Supply only Set of key for DSM 100/36, SS 410/C40Kirloskar pump under item No 21 above. |
| 36 | Supply only set of \"O\" ring for DSM 100/36 Kirloskar pump under item No 21 above. |
| 37 | Supply only coupling made of MS cast block suitable for existing pump & motor of make Kirloskar model DSM 100/36 or DSM 125/40 or 150/45 including nut, bolts & rubber bushings etc complete all as specified and directed |
| 38 | Ditto all as per item No 1 above but capacity of pump 60HP, make: Kirloskar, type DSM80/36, installed at Booster Pump House at D2 circleNote : (i) Spare parts required for replacement shall be measured and paid separately under respective item No39 to 50 here-in-after and labour element includedin this item for replacementin the BOQ. |
| 39 | Supply only CI Impeller, 1st stage, for DSM 80/36 Kirloskar Pumpunder item No 38 above |
| 40 | Supply onlyCIImpeller, 2nd stage, for DSM 80/36 Kirloskar Pump.under item No 38 above. |
| 41 | Supply only Ball bearing, DE, for DSM 80/36 Kirloskar Pump under item No 38 above. |
| 42 | Supply only Bearing housing DE/NDE for DSM 80/36 Kirloskar Pump under item No 38 above. |
| 43 | Supply only Pump Shaft for DSM 80/36Kirloskar Pump under item No 38 above. |
| 44 | Supply only Wear ring for DSM 80/36Kirloskar Pump under item No 38 above. |
| 45 | Supply only Shoulder ring for DSM 80/36 Kirloskar Pump under item No 38 above. |
| 46 | Supply only Interstaging ring for DSM 80/36Kirloskar Pumpunder item No 38 above. |
| 47 | Supply only Split Gland cover for DSM 80/36Kirloskar Pumpunder item No 38 above. |
| 48 | Supply only Set of key for DSM 80/36Kirloskar Pumpunder item No 38 above. |
| 49 | Supply only Gland packing 6 to 24 sq mm for DSM 80/36 or 100/36 for item No. 21 & 38. |
| 50 | Supply only Set of \"O\" ring for DSM 80/36 Kirloskar Pumpunder item No 38 above. |
| 51 | Opening the pump remove the gland cover from the pump shaft by unscrewing the nut , bolt and washers, proper cleaning after removal of the old burnt gland packing from the pump replacing gland with new Polytetrafluoroethylene (PTFE) (Teflon) gland packing of size 6 to 24mm suitable for Pump size 60 HP to 180 HP Refixing the gland cover carefully assembling of pumps with gasket packings, greasing etc all as specified and directed.Note : (i) Rate of spare parts like gland, gasket etc measured and paid separately in item No 04,15,19, 32 & 49. (ii)Thejob to be completed within 8 hrs from time of assignment to avoid interruption of Essential service on account of breakdown else contractor is liable for penalty as Rs 1000/day is recovered from contractors account.(iii) In every two months the contactor should send their mechanic to check the condition of Teflon and replace it |
| 52 | Dismantling carefully all water connections, decoupling of pumps/ motor from electric motor, taking out from foundation & transporting pump body/ motor to workshop for necessary machining works as directed &required and reinstalling the pump after rectification to its original position and commissioning etc Make Kirloskar, Model DSM 125/40 or DSM 150/45 or 80/36.Note : Necessary Gate pass signed by Contractor, AGE E/M and Security office of NDA will be provided by contractor. |
| 53 | Repair & rewinding of electric induction motor of Centrifugal Pump set by using supper enameled copper wire (Class -F) as per existing gauge, heating and varnishing complete. The electric motor of 3 phase, 415 Volt AC induction type of any make. the repair work involves taking out burnt winding coil from stator, cleaning of slots thoroughly, removing all dirt, grease and other unwanted particle, Capacity of motor 180 HP (135KW) complete all as directed by Engineer-in-charge. Note:(i) Unit rate is deemed to be included for taking out motor from its position, shifting of motor from pump house to workshop, getting back to pump house after rectification, reinstalling at site, connecting up, couple with the pump and testing complete. (ii) Retrieved winding wire will be the contractor’s property & necessary credit amount is deduct from contractors as schedule of credit.(iIi) Cost of varnishing included Quoted Rates. |
| 54 | Ditto all as per item No 53 above but capacity of Motor of capacity 100/120 HP(75KW/90 KW). |
| 55 | Ditto all as per item No 53 above but capacity of Motor of capacity 60HP(45KW). |
| 56 | M&L for Periodical and preventive maintenance of AC, 3 Phase Induction motor of capacity 180HP by dismantling the motor completely without damaging any parts and applying air dry insulating varnish, of appropriate Grade (make Doctor Bake/Appex), cleaning bearings, refix at their existing position with bearing grease, checking terminals and thimbles, tighting the all terminal joints, replace terminal plates where necessary, reinstall the motor at existing position, connecting electric connections and testing complete all as directed by Engineer-in-charge. Note :Spares part required for replacement for smooth functioning of motor shall be measured and paidseparately underrespective item as supply only |
| 57 | Ditto all as per item No 56 above but capacity of Motor 100/120 HP(75KW/90 KW). |
| 58 | Ditto all as per item No 56 above but capacity of Motor 60HP(45 KW) |
| 59 | Supplyonly Terminal plate made of Bakelite as per the existing shape and size of the motor complete for motors mentioned in item No 56 to 58 above. |
| 60 | Disconnecting Calcium Hypo chlorite dosingplant of any make and capacity alongwith components, and transporting to authorized workshop tocarry outrepair/replacement of defective minorspares parts i.e. spring, oil seal, pan head screw, circlip, Stroke knob and nut, bolt and washeretc. including cleaning, washing/reassembling the plants and testingafter repair complete all as directed Note : (i) Defective major components/spares if required shall be measured as Supply and replacement under respective item 61 to 77 here-in-after and labour element includedin this item for replacement .( ii)All itemsbeing spare parts as under will be replaced as requiredas percat part or as per existing sampleto shoot the equipmentfor smooth functioning.(iii) Non taken oversite by the contractor and delay in repair if noticed the recovery shall be made Rs 1000/- per day from contractor bill till completion the job because of unchlorinated water cannotbe supplied to the users. |
| 61 | Supply onlyball ceramic(liquid end) |
| 62 | Supply only oilring seal(liquid end) |
| 63 | Supply only suction valve seat (liquid end) |
| 64 | Supply onlydischarge valve housing (liquid end) |
| 65 | Supply onlyanti syphon valve (liquid end) |
| 66 | Supply onlyspecial function valve(liquid end) |
| 67 | Supply only low level switch (liquid end) |
| 68 | Supply onlydiaphragm(liquid end) |
| 69 | Supply onlyfoot valve assembly(liquid end) |
| 70 | Supply onlywhite suction/ discharge PE tubing |
| 71 | Supply onlyDisc 0.5 SQ inch(EPU drive end) |
| 72 | Supply only EPU Assembly (EPU drive end) |
| 73 | Supply only pulsar assembly with LLS(EPU drive end) |
| 74 | Supply onlyAdj Shaft (EPU drive end) |
| 75 | Supply onlyrotor assembly with bearing brackets & tolerance rings pumps |
| 76 | Supply onlychlorine powder dosing pump with made ofTeflon with max pressure 1.5bar, flow 90 ltr / hrs, 70 stroke per mint in max pressure, with max electric consumption 70watt all as specified and directed. Make/ Model- Toscon/ TJ MD 100 or its equivalent |
| 77 | Supply only chlorine dosing tank 150 Liters and Chemical Volume 120 Liters made of FRP consisting ofWater inlet socket with ball valve, outlet socket with Y shape strainer, ball valve and connecting pipes between preparation tank and service tank’s pipes between preparation tank and service tank. including provided with drainage system, float valve for stopping the overflow the water, conical bottom for sludge deposition, opening with lid for adding granules level gauge, agitator 180W, 960 RPM, singlephase flange mounted motor with plastic shaft and impeller, top lead etc all as specified and directed |
| 78 | S &F in replacement Pressure Booster 1 HP with 24 Ltr Tank Capacity 25x 25mm S/D pipe , Max head 42 Meter, Max discharge 3000 ltr per Hrs ,220 volt single phase ,50 HZ, Voltage Range: 180V - 260V, automatic operation with all necessary fixing arrangement complete all as specified and directed |
| 79 | Supply & fix in replacement heavy duty 3 phase DOLMotor Starter for 5 HP with 380-415V, 50 Hz, (with Auto Start Function). Powder coated metal enclosure. dry run Protection. Tested for very long durability. Equipped with a Starting Capacitor & Running Capacitor. Separate Terminal Block for easy wiring Connections.Highly PrécisedVoltmeter & Ammeter to Read Supply Voltage & On-Load Current. Rugged CH Contactor with wide voltage band is designed for exceptional endurance. Fitted with CG type relay for reliable overload protection. with IP54 enclosure complete all as specified and directed |
| 80 | Ditto all as per item No.79 abovebut of capacity of Motor 7.5 HP to 10 HP Motor. |
| 81 | Supply & fix in replacement offully automatic Star deltastarter 3 Phase 75 HPwith current rating 1.5 times more then the capacity of motor power ,370V-415V,provided withIP54 enclosure confirming to standard IEC 60947-1/ISfor smoothly running of motor by reducing inrush current, protecting the motor from overloads. Rated for 415V and 50Hz, this starter is ideal for punitive industrial environments, including protective from high temperatures, dust, and humidity. Also Single-phase preventers are used to safe an inductionmotor against a single phasing failure. Its automatic star-to-delta transition enhances motor’s efficiency and reduces mechanical wear, making it an ideal choice for industries suchas manufacturing, agriculture, and heavy machinery operations all as specified anddirected. Except this following features also included in starter.(a) Protection from over load condition(b) Phase reversal and imbalance protection.(c) Auto restart features.(d) Vibration proof enclosure(e) Indication for on/off status.(f) Voltage and Amp Meter.Make & model : LK (L&T) .MU-G 75 FASD (CS96451LOKO)or its equivalent. |
| 82 | M & L for replacement of AC motor starters (LT) fully automatic star delta starter suitable for 90 kw / 125 HPcentrifugal motorwithrelay range 1.5 time more thanthe capacity of motor Amp,3 phWith single phase preventer. confirming to IS/IEC 60947-4-1 ML-6 , IP 55 sheet metal enclosures control voltage 440 vAC, with start stop push buttons. Following features should be included in Starter.1)All components should be fixed in a sheet (2mm thick) steel enclosure with front opening. 2)Enclosure should be suitably painted & have sufficient space inside the box to accommodate incoming/ outgoing cables. 3) Suitable rating of contactorshould be 3-ph. 415v.165Amp4)Coil voltage 440v.AC. 5)Fixing arrangement of starter should be suitable for wall/structure. 6)Suitable earthing studs should be provided 7)Enclosure should be outdoor type (IP 55 or better) 8)Door cover closing / fixing screws should be such that same do not come out of the door on its opening & remain with cover with suitable arrangement to avoid missing of these screws. 9)Mainsupply should be provided through 200AMP4Pole MCCB with insulated operating handle. 10) Voltmeter & ammeter should be available in starter 11) Indication lamp for on,off and trip position should be available 12) Starter must be provided with glands to insert 3cx120 sqmm al cable and proper fixing arrangement for incoming and outgoing cables. 13)Starter should have stop push button locking featureMake & Model : LK(L&T) / ML6 FASD , cat no SS90923 or its equivalent. |
| 83 | Ditto all as per item No 81 above but capacity of motor 30 HP |
| 84 | M&L for repair and maint of existing unserviceable/ damaged part / portion of the starter panel of any type, any capacityand any makewith supplying and fixing new partto make the existing starter panelincl replacement of of door lock /hinges etc all as directedNOTE:(i) The rates quoted by the contractor are deemed to be with and including necessary cutting, welding, levelling and jointing etc. as directed to match & accommodate with the existing starter panel.(ii) The rate of copper strip/copper wire, nut, bolt, screws etc are include the quoted rates of BOQ.(iii)The rate of material like Door lock, hinges, contactor, relay,are to be measured and paid separately under respective items No 85 to 97of BOQ. |
| 85 | Supply only 3 pole power contactor with required NO+NC coil voltage 380 to 400 suitable for 7.5 HP motor as directed. |
| 86 | Supply only 3 pole power contactor with required NO+NC coil voltage 380 to 400 Volt suitable for 12 HP motor as directed. |
| 87 | Supply only 3 pole power contactor with required NO+NC coil voltage 380 to 400 Volt suitable for 15 HP motor as directed. |
| 88 | Supply only 3 pole power contactor with required NO+NC coil voltage 380 to 400 Volt suitable for 20 HP motor as directed. |
| 89 | Supply only 3 pole power contactor with required NO+NC coil voltage 380 to 400 Volt suitable for 25 HP motor as directed. |
| 90 | Supply only 3 pole power contactor with required NO+NC coil voltage 380 to 400 suitable for 180HP motor as directed. |
| 91 | Supply only 3 pole power contactor with required NO+NC coil voltage 380 to 400 suitable for 100/120HP motor as directed . |
| 92 | Supply only Thermal over load relay for 3 Phase AC Motor starter, suitable for 3 pole contactor of 180HP motor, relay setting range 125 to 200 Amps. |
| 93 | Supply only Thermal over load relay for 3 Phase AC Motor starter, suitable for 3 pole contactor of 100/120 HP motor, relay setting range 100 to 160 Amps. |
| 94 | Supply only 3 pole power contactor AC, 415 Volt, with required NO + NC & Coil voltage 380 to 400, suitable for 60HP water pump. |
| 95 | Supply only Thermal over load relay for 3 Phase AC Motor starter, suitable for 3 pole contactors of 60HP water pump. Relay setting range 63 to 80 Amps.. |
| 96 | Supply only AC VAF digital display, flush mounted, 96mmx96mm size. 0 to 600 Volt including selector switch. |
| 97 | Supply only timer relay 0 to 30 Sec.in star-delta starter. |
| 98 | Supply & fix in replacement SS fountain nozzle 25 mm dia 6\" long open mouthas per existing samplerequired at site to accommodate in existing position all asspecified and directed . Note: Tenderer is requested to visit site before tendering/quoting |
| 99 | Supply & fix in replacement brass jet /brass mist nozzle as per existing sample required at site to accommodate in existing position at Chamak/Salaria fountain all asspecified and directed. Note: Tenderer is requested to visit site before tendering/quoting |
| 100 | Supply and fix in replacementSS fountain nozzle 600mm long and 5mm dia as per existing sample required at site to accommodate to existing position all as specified and directed.Note: Tenderer is requested to visit site before tendering/quoting |
| 101 | S & F in replacement surface under water fountain light , IP 68 , round shaped with stainless steel body , high color consistency , excellent brightness , environmental friendly , compatible DMX control for RGB version , protection for 3mtr depth under water and IK07 impact resistance, life time over 25000 hrs (70% Lumen maintenance, copper housing upto 18W LED RGB with polarized light design highlight intensity empowered color changing and monochromatic LED RGB with driver and all connecting accessories including necessary water proof wiring complete all as specified and directed.Make Philips/ Crompton/Bajaj or its equivalent. |
| 102 | Material & Labour for providing and fixing in replacement of stainlesssteel (Grade 304) railing made of hollow tubes of size 50mm dia etc, including welding, grinding, buffing, polishing and making curvature (where everrequired) and fitting the same with necessarystainless steel nuts and bolts complete, including fixing the railing with necessary accessories &stainless steel dash fasteners, stainless steel boltsetc, includingfixing 05 Nos gun metal nozzle 20mm dia 100mm long incl 05 Nos gun metal gate valve ISI markedinstalled at cadetmess fountain all as specified and directed. Note : - (a) replacement of Stainless steel Pipes should be 50mm dia , outer diameter 50.8mm ,10SWG (3.2mm) thickness (wt 3.77kg/RM) round in shape (max 02 mtr dia of circle)& 1.5RM arc.(b) Contractor will be receive a Drawing from Engr-in-Charge before execute at site. |
| 103 | Excavation in trenches in soft / loose soil, not exceeding 1.5 mtr. Wide and not exc 1.5 mtr in depth, getting out forlaying of cable complete all as specified and directed |
| 104 | Returning, filling in, excavated soil, including spreading, levelling, watering and well ramming in layers, not exceeding 25 cm complete all as specified and directed |
| 105 | S & F in replacement submain wiring with 2x2.5 Sqmm + 1x2.5 Sqmm size single core PVC insulated multi stranded copper conductor cables 1100V grade along with non metallic rigid conduit of 20mm dia with all fixing accessories complete all as specified and directedNote: Two run 2.5 sqmm and one run 2.5 sqmm cable along with 20mm size conduit shall be measured as one RM |
| 106 | M & L in replacement submersible copper cable 3 core pvc insulated 1100V grade conforming IS 694 of size 6 sqmm complete all as specified and directed |
| 107 | S & F in replacement old u/s 16 Sqmm, 3 core, 1100 Volts, copper conductor flat cable for submersible pump including connecting to motor complete all as specified and directed. |
| 108 | S & F in replacement old u/s 10 Sqmm, 3 core, 1100 Volts, copper conductor flat cable for submersible pump including connecting to motor complete all as specified and directed. |
| 109 | S & F in replacement FRP Junction boxconfirm to IP 67 protection of size 125x150x100mm 1 phase supply including fixing with pole / wall with necessary clamp/nut, bolt and washerscomplete all as specified anddirected. |
| 110 | Supply ,installing, testing ,commissioningin replacement of cubical housing cabinet type LT panel of size 1200 mm x 1000 mm x500 mm, platform mounted factory made, totally enclosed dust and vermin proof openablefrom both front and rear side , outdoor type made out of 3.15 mm thick CRCA (Cold Rolled Cold Annealed) MS Sheet, Powder coated, CPRI approved, IP-58 and built upon 35 x 35 x 3 mm size angle ironframe work , having front and rear hinged doors, lifting lugs (2 Nos) , earthing strips at rear side , bottom detachable gland plate complete with suitable size zinc plated and passivated nut, bolts , spring and washers.The cabinet and all members should be chemically treated with MSR solution for anticorrosive treatment. Necessaryfoundation work as required at site and comprising of Neon RYB LED Indicator and danger sign Boardhaving opening and locking arrangement both fromfront and back side, including necessarygrouting with Aluminum busbar 300 Amps current carrying capacitycomprisingof4Aluminum strips ofappropriate size provided withheat shrinkable sleevenotless thanonemm thick and comprisingthefollowings:-(a)MCCB 4 Pole 100 amps ,415 Volt of breaking capacity 16 KA (Ics=100 % of Icu) with Adj Thermal & Fixed Magnetic Type - 01 Nos (incoming)(b) DOL starter-04 Nos (out going for 7.5 HP Pump)(c) MCB SPN 32 Amp-02 Nos (For surface lighting)(d) MCB TPN 40 Amps-01 Nos (spare)Note : DOL Starter should have following features(a) Protection from over load condition(b) Phase reversal and imbalance protection.(c) Auto restart features.(d) Indication for on/off status.(e) Voltage and Ammeter. |
| 111 | M& L for replacement of single phase submersible motor starter suitable up to 2HP Pump Motor with dry run facility ,230 Volt with ammeter and voltmeter fixing with wall with suitable size of nut, bolt and washers all as specified and directed. |
| 112 | Taking out unserviceable / defective open well submersible/Centrifugal pump set open well pump capacity 0.5/ 1 HP, AC single phase, 50 HZ, make and type by disconnecting pipe and electric connections carrying to workshop for repair (to and from). Repair works comprises with the following: -(i)Re winding of motor complete by replacing existing burnt winding as per the existing gauge & turn to achieve desired rpm and discharge. (ii) Servicing & repairing of Pump by replacing existing bushes, bearings, other defective parts as required for smooth functioning and to achieve desired discharge. (iii) Installed the pump set at its existing position after satisfactory repair and testing at site.Repair required for the pumps are given here in after. Note (i): Replacement of impeller if required shall be measured and paid separately.(ii) : Machining required to existing shaft if required shall be done by the contractor and rate for the same is deemed to be included with the quoted unit rate. |
| 113 | Ditto all as per item No 112 above but open well pump capacity 2/3 HP, AC single Phase, 50 HZ. |
| 114 | Ditto all as per item No 112 above but open well pump capacity 5/7.5HP, AC single Phase, 50 HZ. |
| 115 | Ditto all as per item No 112 above but open well pump capacity 10/12.5 HP, AC single Phase, 50 HZ. |
| 116 | Ditto all as per item No 112 above but open well pump capacity 15 HP, AC single Phase, 50 HZ. |
| 117 | Ditto all as per item No 112 above but open well pump capacity 25/30 HP, AC single Phase, 50 HZ. |
| 118 | Supply only impeller CI suitable for Open well pump of cap 1HP to 2 HP (Impeller shall be as per existing and to suit with the shaft of pump) |
| 119 | Supply only impeller CI suitable for Open well pump of cap 3HP to 5 HP (Impeller shall be as per existing and to suit with the shaft of pump) |
| 120 | Supply only impeller CI suitable for Open well pump of cap 12.5 HP (Impeller shall be as per existing and to suit with the shaft of pump) |
| 121 | Supply only impeller CI suitable for Open well pump of cap 15HP (Impeller shall be as per existing and to suit with the shaft of pump) |
| 122 | Taking out carefully unserviceable Mono block pump set with15/12/12.5/10/7.5 HP induction motor from its foundation by disconnecting suction /delivery pipes and electric connections and carrying to workshop (to and fro) for repair.The repair/ rewinding works consisting of following Job:- (i) Strip opening of pump set , removing worn out/unserviceable component from the pump and replacement of defective parts as per existing size and make, greasing, oiling of parts as required for smooth functioning , reassembling the pump re-install at its existing position, providing electric and water pipe connections and testing complete for the following capacity:Note : Cost of replacement of partsrequired for smooth functioning of pump & re-winding of motor if required shall be measured and paid separately under respective items.. |
| 123 | M & L for rewinding of electric induction motor of Monoblock pump set by using super enameled copper wire (Class -F) as per existing gauge, heating and varnishing complete. The electric motor shall be of 3 phase, 415 Volt AC induction type of any make. the repair work involves taking out burnout winding Coils from starter, cleaning of slots thoroughly, removing all dirt, grease and other unwanted particle, replacement of unserviceable parts where required (as directed). Capacity of motor 10/ 12.5 HP complete all as directed. Note:(i) Retrieved winding wire will be the contactors property & necessary credit amount is deemed to be included in the quoted rate, hence no credit has been considered in credit schedule |
| 124 | Ditto all as per item 123 here in above for motor up to capacity of 7.5 HP complete all as directed. |
| 125 | Removing unserviceable Sluice Valve and Repair / servicingby opening stuffing box, MS Nut, Bolts, etc. for replacement and repairing of Spindle, Check Nut, etc. and re-assembling repaired Sluice Valve and making functional and re-fixing the same including replacement of Gasket, Gland Packing, etc. of size 400/500mm complete all as directed. Note: Replacement of unserviceable parts shall be measured and paid separately under respective item No-128 to 132 of BOQ. |
| 126 | Ditto all as per item No 125 above but size 300/250/200 mm. |
| 127 | Ditto all as per item No 125 above but size 80/100/150 mm. |
| 128 | Supply only stainless steel Spindle with check Nut/ Hub nut andsuitable forexisting Sluice Valve of size 450 mm of any make, complete all as specified and directed. |
| 129 | All as per item No.128 but of size 400 mm sluice valve. |
| 130 | Ditto all as per item No 128 above but for 300 mm sluice valve. |
| 131 | Ditto all as per item No 128 above but for 250 mm sluice valve. |
| 132 | Ditto all as per item No 128 above but for 200/150 mm sluice valve. |
| 133 | Taking out foot valve from underground sump and repair / servicing of CI foot valves of any make and type fitted with suction lines of pumps installed in various pump houses opening body, MS Nut, Bolts, etc. and replacement of unserviceable parts, Nut, etc, re-assembling the foot valves and refix its existing position including replacement of Gasket, etc checking its serviceability complete. size of foot valve 200mm. (Unit rate includes replacement of damaged parts of foot valve) Valves complete all as specified and directed |
| 134 | Ditto all as per item No 133 above but size of foot valve 100 mm . |
| 135 | Ditto all as per item No 133 above but size of foot valve 80 mm . |
| 136 | Supply & fixingin replacementof Cast IronFoot valvesBall type flanged with strainer of 200 mm dia including all types of fittings & confirming to IS specification complete all as specified andas directed. |
| 137 | Supply & fixing in replacementof Cast IronFoot valvesBall type flanged with strainer of 150 mm dia including all types of fittings & confirming to IS specification complete all as specified andas directed. |
| 138 | Supply & fixing in replacementof Cast IronFoot valvesBall type flanged with strainer of 80 mm dia including all types of fittings & confirming to IS specification complete all as specified andas directed. |
| 139 | Pumping outmuddy water ( 25000 Ltrs Max) from the semi UG sump by installing non clog pump, De-silting and taking Out accumulated Silt, Sand, Mud, etc. From Raw water collecting chambers/ clarifier, etc of any size and any location by manually or by machine with all required tools and Scaffolding, disposing mud /silts where directed to a distance not exc. 50 meter, cleaning the internal area of walls floorsproperly all as specified and as directed and including removing mud from sump complete all as directed.Note : Cleaning of UG Sump is carried out in once in 3 months. The contractor will br responsible for clean the the sump with in the stipulated period circulated by GE |
| 140 | Pumping out muddy water (1000 Ltrs Max) from the fountain by installing non clogpump, De-silting and taking Out accumulated Silt, Sand, Mud, etc. From Raw water collecting chambers of any size and any location by manually or by machine with all required tools and Scaffolding, disposing mud /silts where directed to a distance not exc. 10 meter, cleaning the internal area of walls floorsproperly all as specified and as directed and including removing mud from sump complete all as directed. Note : Cleaning of UG Sump is carried out in once in 3 months. The contractor will be responsible for clean thesump with in the stipulated period circulated by GE. |
| 141 | S & F in replacement NRV Ball type150 mm Class PN 1.6 Ball typeISI marked as specified and directed |
| 142 | S & F in replacement NRVBall type 200 mm Class PN 1.6 Ball type ISI marked as specified and directed |
| 143 | S & Fin replacementNRVBall Type 80 mm Class PN 1.6 Ball type ISI marked as specified and directed |
| 144 | M & L for preparation of Old/ existing treated Metal/ steel surface, over 10cm width or girth and applying one coat synthetic enameled paint of different tint as directed as in painting to water pipe lines & equipments/ valve pit covers or any other items as listed belowin water supply installations at Raw water pump house and New Raw Water PH complete all as directed. a) Centrifugal pump set along with motor -5 Nob)LT control Panel-02 Noc) DI Pipeof different size-35 RM (Approx)d)Sluice valves with NRV -9 Nose) Valve Pit Chamber with operating handle -4 No |
| 145 | Ditto all as per item No 144 here in above for items as listed below in water supply installations at Filtration plant having following items/Machinerya) CI/DI/GI Pipe line of various size-200RM(Approx)b) LT Control Panel-02 Noc)Pump and motor-04 Eachd) Air compressor-01 e) Valve Pit chamber cover with valve and operating handle-08 Nos(f) Clarifier Mechanism-01 Nos(g) Flocculating Mechanism-01 Nos. |
| 146 | M & L for Periodical preventing maintenance of air compressor, Screw type, FAD/Disc 2073Lit/Min working pressure 7 Kg/Cm 2900 RPM , 20 HP motor of Model No : HV20070 through authorized service person of OEM with necessary tool & Plant including all minor spare parts required for smooth functioning compressor complete all as specified and directed |
| 147 | Supply & fix in replacement 45 watt LED post top made in dia cast aluminum bottom housing with decorative clear opal acrylic diffuser and IP 65 protectionincluding Taking out existing damaged Post top lanterns from Post and complete all as specified and directed. |
| 148 | Disconnecting existingover heated or burnt cable terminal at existing panel and cutting out over heated / burnt portion of cable, stretching / opening cable to suitable required length from available rings and reconnecting cable in position properly with providing new lugs, tapes etc for cable size upto 120 sqmm complete all as specified and directed |
| 149 | M&L for repair and maint of existing unserviceable/ damaged part / portion of the existing feeder pillar box /LT panel boards with supplying and fixing new part or portion fabricated out of 2mm thick MS sheet in position including making necessary adjustments and alignments to make the existing feeder pillar box/ panel board body to required shape(s) and size(s)incl replacement of of door lock /hinges etc all as directed by Engineer-in-Charge.NOTE: (i). The panel board repaired shall be made totally enclosed, weather proof for installing incoming / outgoing MCCB / Switch fuses/ cable etc. complete all as directed (ii) The rates quoted by the contractor are deemed to be with and including necessary cutting, welding, levelling and jointing etc. as directed to match & accommodate with the existing feeder pillar box / panel board.(iii) The replaced portion shall be painted with two coats of synthetic enameled paint over a coat of red oxide primer. (iv)The rate of material like Door lock, hinges, MCCB, Changeover switch, aluminum strip are to be measured and paid separately under ser item No 151 to 160 of BOQ. |
| 150 | M & L for repairing of LT panel of any size preparation of old painted surfaces for repainting complete feeder pillar boxes/panels/ boards with applying two coats of synthetic enameled paint (as existing color) with using spray machine on prepared surfaces complete all as specified and directed |
| 151 | Supply only LT panel door lock with key chromium plated or as per existing sample. |
| 152 | Supply only LED Panel Round Indicator Light Or Lamp, IL22-AW-220V-RBGY, 220V AC, 22.5MM Plastic LED Indicator Pilot Signal Light Lamp, Red, Blue, Green & Yellow (Set of RBGY)for 240 Volts AC supply as per existing size complete including connection & testing |
| 153 | Supply only multifunction Meters 3 phase, 415 Volts, showing Amper, voltage, PF, HZ parameter ,KW, KVA, Run hours, KWh with Accuracy Class 1.0,0.5, Aux supply 80-300 VAC/DC ,CT Secondary site selectable 1A/5A, Flush mounting 96 x 96 mm inbuilt selector switch complete including connection & testing..Make of - L &T / Schnieder/AE |
| 154 | Supply only digital display volt meter 3 phaseAC 50V to 500V suitable size to existing one complete including connection & testing.Make of - L &T/Schnieder/AE |
| 155 | Supply only Digital DC Ammeter DC ± 75mV (-75mV to 75mV) shunt selectable, for Bi-Directional DC current measurement using shunt of any range, of Size 96x96mm suitable rating to existing CT complete including connection & testing testing Make of - L &T/Schnieder/AE |
| 156 | Supply only CT Coil of ratio 5/100 A, 220V with all necessary connection in existing panel all as specified and directed. |
| 157 | Supply only MCBs single pole 230Volt, 6 to 10 Amps having breaking cap 10kA, \" C\" curve completeall as specified anddirected. |
| 158 | Supply only MCBs single pole and neutral , 230Volt, 32 Amps having breaking cap 10kA, \" C\" curve completeall as specified anddirected. |
| 159 | Supply only MCBs 3 pole and neutral , 415Volt, 25 Amps having breaking cap 10kA, \" C\" curve completeall as specified anddirected. |
| 160 | Supply only 3 phase over current + earth fault Relay with CT rating 1Aor 5A as per ground requirement with following features(a) IDMT(inverse definite minimum time) & definite characteristics.(b) Last 30 trip data recording with date and time(c)Password protection. |
| 161 | S&F in replacement dialed type water pressure gauge 4\" dia upto 28 Kg/cm2 including CP stop cock 15 mm with U tube. Made of stainless steel complete all as specified and directed Make: Feibig/Heibig/ H-Guru/Clug |
| 162 | M&L for earthing complete with GI earth electrode 600x600x6.3mm thick buried directly in ground, earth pit not less than 2.25 mtr below ground level, with top edge of the plate not less than 1.5 mtrbelow normal ground level connected to both end and incl 32x6 mm GI strip 7.5 Mtr long by means of nut and bolts and washers of GI all as shown in electrical plate No 3 and including necessary exec funnel with wire mesh and watering pipe 20mm dia PCC chamber with PCC cover 50mm thick incl testing on completion complete all as specified and directed. Note :- a) The earthing resistance should be as per IS 3043 b) No payment against material at site will be paid. 3) 100% payment shall be made only after completion in all respect and testing of earthing and production of test results as per IS 3043. c) GI strip beyond 7.5 Mtr long shall be measured and paid separately |
| 163 | Supply and connect in replacement GI strip 32x6 mm in ground/ trench/ wall or such similar positions. |
| 164 | M & L for providing and fixing SS (Gde -304) railing /framed work as ladder made of hollow tubes channels ,plates etc including welding grinding buffing polishing and making curvature (where ever required), and fitting same with necessary stainless steel nuts, bolts complete including fixing the railing with necessary accessories and SS dash fasteners , SS bolts etc of require size on top of floor waist slab with suitable arrangement including dismantling of existing complete all as specified and directed. Note : Cost of cutting, welding, fabrications work, demolition of concrete etc. incl making good the disturbed/damaged surfaces complete all as specified is deemed to be included in the unit quoted rates. |
| 165 | M & L for repairing to damaged portion ofvalve pit chamber on exisiting chamber foundation with 230 mm thick brick wall in CM (1:6) 75 mm thick coping with PCC 1:2:4 type B1, 15 mm thick plaster work in CM 1:4 over all internal and external wall with white wash of both surface and Chequered plate cover of 7mm thickness for Valve Pit Chamber of size upto 750x750x750 mm with hinges, equal angle iron frame(40x40x4mm) and necessary locking arrangement painting of synthetic Enamel paint over coat of red oxide primer on Plate including dismantling existing damaged portion of chember and removal of all debris all as specified and directed . |
| 166 | Ditto all as per item No 165 herein above but for valve pit chamber of size up to900x900x750 mm |
| 167 | Ditto all as per item No 165 herein above but for valve pit chamber of size upto1200x1200x750 mm |
| 168 | Labour of Skilled category for shaft balancing of Pump and motor as per OEM setting arrangement with required T &P all as specified and directed .Note: Job to be done through authorize Rep. of OEM with T & P. |
| 169 | Supplying and laying in replacement synthetic Rubber insulated mats 2.5 mm thick for voltage upto 11 kv for electrical insulation purpose as per IS 15652-2006, (superseding IS 5424) suitable for electrical shock safety of sizes 2m x 1m complete all as specified and directed |
| 170 | Taking down unserviceable sluice valve/butterfly Valve from existing position, supply and fixing Butterfly Valve of 300mm dia PN 1.6 with SS disc , ductile iron (IS 210 FG 200) Gear box operated,Body Cast iron, Nitrile/EPDM Rubber Lining,Seat Test Pressure 1.76 MPa (Hyd.)confirm to IS 13095 including necessary arc/gas welding with flange as per existing pipe line , tail pieces made inMild steel as per site requirement length upto 50cm, dia of tail peace as per existing pipe, suitable size nuts, bolts, washer and rubber gasket all as required and directed at site.Note : (i) The rate ofMS/DI fittings like tail pieces, socket, bend etc are measured and paid separately under respective items of BOQ. (ii) if any earth work required then the rates are deemed to be included in the quoted rates. |
| 171 | Ditto all as per item No 170 above but of size of butterfly gear operatedvalve 250 mm |
| 172 | Ditto allas per item No 170above but of size of butterfly gear operatedvalve 200 mm |
| 173 | Ditto allas per item No 170above but of size of butterfly gear operatedvalve 150 mm |
| 174 | Ditto all as per item No 170above but of size of butterfly gear operatedvalve 80 mm |
| 175 | S&F in replacementSluice Valve CI class PN 1.6 flanged type 500mm, ISI markedwith hand wheel for operation, Non- Rising SS stem, bronze body seat ring, ISI markedincluding all minor fixing arrengement complete all as specified and directed |
| 176 | All as per seritem No 175 above but sluice valve size 450mm. |
| 177 | S&F in replacement On load manualchange Over Switch 4 pole AC 415V Current rating 800Amps,confirm toIS/IEC 60947-3 in sheet steel enclosure fixing with wall including all necessary fixing arrangement complete all as specified and directed |
| 178 | S&F in replacement MCCB 800 A, 4 Pole, 50 kA, Adjustable O/L, Adjustable S/C & E/F Settings, Microprocessor Based confirm to IS/IES-60947-2, Ics=100% Icu, Adjustable over load setting from 0.25 to 1.0xIn, Adjustable short-circuit setting from 1.5 to 12xIr*, switchable thermal memory, variable trip class, transparent sealable release cover fixedin existing panel including all necessary fixing arrangement complete all as specified and directed |
| 179 | All as per serItem No 178 above but capof MCCB400Amps. |
| 180 | All as per ser Item No 178 above butcap of MCCB 200 Amps. |
| 181 | All as per ser Item No 178 above but cap of MCCB 125 Amps. |
| 182 | M&L for MS work in framed bracket of angles or Tees with web and flanges cut to shape , drilled and countersunk for screw including bending and welding angles as necessarygusset plate, riveting etc n ecx 10 kg each bracket conforming to Fe290 Gde-E-165 with tie bar screwed ends, nut, washers and MS plates all as required beneath Pumps and Motors including dismantling of existing complete all as specified and directed |
| 183 | M &L for periodical preventive maintenance and servicingof LT ACB 800 ampsAC 3 phase 415 V 50 HZ 4 polebreaking capacity 50KA Manually draw out type (MDO) with microprocessor release link switches main CTs including cleaning with chemical spray CRC-26, applying Petroleum jelly to all moving part, male and female contacts terminals spout of ACB, checking fixed contact of all phase, existing electrical, electronic/ mechanical component with control wiring etc all as per OEM instruction manual and standard practicesand testing ACB by injecting full current , fault level setting of ACB complete all as directed. |
| 184 | M & L for painting of external surface of semi underground sump of max cap 8.6 lakh liter capacity installed at Filter pump house/Booster pump house/ E-3 semi UG Sump/Bombay stadium UG Sump with one coat of acrylic water based exterior grade primer @ 0.9 litre (undiluted)/ 10sqm diluted with water in 1:1 ratio,applied with fully automatic airless spraymachine and allow 6-8 hours to dry the surface for painting of subsequent coats complete and after that used water based premium acrylic smooth exterior emulsion of approved color with silicon additive excellent dirt pickup resistance with low VOC less than 50, antifungal / anti algae properties in two coats @ 1.79 liter (undiluted) / 10 Sqm diluted with water as per manufacturer\"s instruction applied over primed surface with fully automatic airless spray machine of paint application with a flow speed of minimum 1 liter per minutehaving a pressure of 3300 PSI. Allow 6-8 hrs to dry the surface in between 1st and subsequent coats of paint complete all as specified and directed.Make: Nerolac Excel Top guard / Asian Paints Ultima Protek / Berger weather coat long life10 |
| 185 | M & L for cleaning the entire Filter water pump Houseonce in every three month of any capacity by cleaning theFilter Bed of Size 6.7 x4.6 x 3.5 meter-03 Nos, Semi underground sump of cap 8.6 lakh liter each -04 Nos, Fabulation tank of size6.1x6.1x4.0mtr -01No, Clarifier tank of capacity 2.45 lakh gallons -01 Nos, Tube Settler tank -01No , Alum Chamber of Size 7.6x2.0x1.5mtr -01 Nos,by means of copier/wire brushand wash the interior with bleaching powder and removing all loose/ sedimented sand, sludge, mud, vegetation, grit, ash, rages, fibers and string/plastic materials etc disposed off the sludge50mtr away from the pump house, using safety protection/devices for working men power while working including separate the serviceablesand filter bed media (Sand & Pebbles) for reuse and making tank leak less byplastering of 1:2 CM with Dr. Fixit or suitable water proofing compoundor any other superior mixture, preventing leakage oftank .Note: - (i) The work willstart when the engr-in charge given the site to the contractor. If contractor not taking over site or delay in work if noticed the recovery shall be made Rs 1000/- per day since the date of site handed over till completion of the job from contractor\"s Bill.(ii) The materials like Cement, bleaching, wire brush etc are deemed to be included the quoted rates.(iii) After the site taken over, the contractor must deploy sufficient man power and complete the task within the stipulated time period of 3 days in Maximum.(iv) Water supply should not be affected during the work. If contractor could not complete the work within the stipulated time period then a penaltyof 25% on estimated cost ofschedule item will be recovered from contractor\"s Bill. |
| 186 | M & L for cleaning the entire Semi UG Sump of Booster pump House/E3 Area of any size (Total -03 Nos) once in every three month by means of coier/wire brushand wash the interior with bleaching powder and removing all loose/ sedimented sand, sludge, mud, vegetation, grit, ash, rages, fibres and string/plastic materials etc disposed off the sludge50mtr away from the pump house, using safety protection/devices for working men power while workingand making tank leak less byplastering of 1:2 CM with Dr. Fixit or suitable water proofing compoundor any other superior mixture, preventing leakage oftank .Note:-(i) The work willstart when the engr-in charge given the site to the contractor. If contractor not taking over site or delay in work if noticed the recovery shall be made Rs 1000/- per day since the date of site handed over till completion of the job from contractor\"s Bill.(ii) The materials like Cement, bleaching, wire brush etc are deemed to be included the quoted rates.(iii) After the site taken over,the contractor must deploy sufficient man power and complete the task within the stipulated time period of 3 days in Maximum.(iv) Water supply should not be affected during the work. If contractor could not complete the work within the stipulated time period then a penaltyof 25% on estimated cost of schedule item will be recovered from contractor\"s Bill. |
| 187 | M & L for cleaning theSemi UG Sump of Raw water pump House of Cap 15.00 Lakh liter(Total -01 Nos) once in every Six month by means of coier/wire brushand wash the interior with bleaching powder and removing all loose/ sedimented sand, sludge, mud, vegetation, grit, ash, rages, fibres and string/plastic materials etc disposed off the sludge50mtr away from the pump house, using safety protection/devices for working men power while workingandmaking tank leak less byplastering of 1:2 CM with Dr. Fixit or suitable water proofing compoundor any other superior mixture, preventing leakage oftankand one coat of white washing of Internal Surface.Note:-(i) The work willstart when the engr-in charge given the site to the contractor. If contractor not taking over site or delay in work if noticed the recovery shall be made Rs 1000/- per day since the date of site handed over till completion of the job from contractor\"s Bill.(ii) The materials like Cement, bleaching, wire brush, Dr fixed water proofing etc are deemed to be included the quoted rates.(iii) After the site taken over,the contractor must deploy sufficient man power and complete the task within the stipulated time period of 3 days in Maximum.(iv) Water supply should not be affected during the work. If contractor could not complete the work within the stipulated time period then a penaltyof 25% on estimated cost of schedule item will be recovered from contractor\"s Bill. |
| 188 | M&L for calibration /servicing of ultrasonic digital water level indicator cum controller unit-01 Nos and ultrasonic non-contact level monitoring transmitter (Sensor) unit for UG tank -04 Nos Make - Brio instruments by rep of authorised dealer of Brio Instruments. Installed at Filter pump house all as specified and directedNote: (a) Contractor should yet the calibration done by authorised engineer and produce the calibration report to the Engr-in-Charge. (b)If the meter found unserviceable then the contractor should make the meter serviceable without any extra cost. |
| 189 | M&L for calibration /servicing of ultrasonic digital water level indicator cum controller unit-01 Nos and ultrasonic non contact level monitoring transmitter (Sensor) unit for UG tank -03 NosMake - Brio instruments by rep of authorised dealer of Brio Instruments installed at Booster Pump house all as specified and directed.Note: (a) Contractor should yet the calibration done by authorised engineer and produce the calibration report to the Engr-in-Charge. (b)If the meter found unserviceable then the contractor should make the meter serviceable without any extra cost |
| 190 | M&L for calibration /servicing of electro magnetic flow meter -01 Nos Make - Brio instruments by rep of authorisd dealer of Brio Instruments installed at Raw water pump house.Note: (a) Contractor should yet the calibration done by authorised engineer and produce the calibration report to the Engr-in-Charge. (b)If the meter found unserviceable then the contractor should make the meter serviceable without any extra cost |
| 191 | M&L for Periodical and preventive maintenance & servicing ofof AC, 3 Phase faculating mechanism with reduction gear directly coupled to motor of cap 7.5 HP by dismantling the motor completely without damaging any parts and applying air dry insulating varnish, of appropriate Grade (make Doctor Bake/Appex), cleaning bearings, refix at their existing position with bearing grease, checking terminals and thimbles, Checking of belt ,tightening the all terminal joints, replace terminal plates where necessary, changing of gear oil reinstall the motor at existing position, connecting electric connections and testing complete all as directed by Engineer-in-charge. Note :Spares part required for replacement for smooth functioning of motor shall be measured and paidseparately underrespective item as supply only |
| 192 | Ditto all as per ser item No 191 above but for 3 Phase clarifier mechanism unit . |
| 193 | Supply onlyGear oil of Grade 80W 90all as specified and directed |
| 194 | M&L for Providing services for removal of Filter Bed Media (Gravel & Sand) from Filter Bed of Size 6.5 x 4.5 mtr up to 1.5 mtr in depth as per existing arrangement and as per standard practices as mentioned below within the stipulated time period by employing suitable numbers of labour with necessary tool and plant to complete work on or before the stipulated time including cleaning of filter bed media (Gravels only) with fresh/clean water till complete removal of tiny dirt deposited on gravel and make it suitable to reuse and proper segregation of Gravels and sand for taking down old cracked tiles complete all as directed. A)Existing Layer of Media :-1) First Layer with Gravels of size 40mm size upto 300mm at the bottom of Bed. 2) Second Layer with Gravels of 30mm size upto 300mm above the first layer.3) Third layer with Gravels of 20mm size upto 300mm above the second layer.4) Fourth layer with sand 0.35-0.5mm size upto 600mm above the third Layer. Note : 1)One bed will be handed over at a time to complete said Job. 2) Contractor is responsible to complete the said job within stipulated time period of shutdown by deploying sufficient labour and material at a time. |
| 195 | M&L for Providing services for Refilling (Loose) of Filter Bed Media (Old Gravel andQuartz sand) inside Filter Bed of Size 6.5 x 4.5 mtr upto 1.5 mtr in depth as per existing arrangement and as per standard practices as mentioned belowwithin the stipulated time period by employing suitable numbers of labour with necessary tool and plant to complete work on or before the stipulated time after necessary repair worksinside bed complete all as directed :A) Laying of Media :-1) First Layer with Gravels of size 40mm size upto 300mm at the bottom of Bed. (Old Gravel retrieved from Item No 172 above)2) Second Layer with Gravels of 30mm size upto 300mm above the first layer. (Old Gravel retrieved from Item No 172 above)3) Third layer with Gravels of 20mm size upto 300mm above the second layer. (Old Gravel retrieved from Item No 172 above)4) Fourth layer with sand 0.35-0.5mm size upto 600mm above the third Layer.Note : 1)One bed will be handed over at a time to complete said Job. 2) Contractor is responsible to complete the said job within stipulated time period of shutdown by deploying sufficient labour and material at a time |
| 196 | Taking out existing spoiled sand ,accumulated mud/quartz sand etc.(Fine filter media) from the Rapid Gravity feedtype Filter Bed / Pressure filter of any size installed at Filter pump houseat NDA Khadakwasla, washingthoroughly, sieving and stacking size wise for reuse good quality sand andremoving the spoil from site complete all as directed |
| 197 | Taking out existing pavels/ Gravels of any size(filter media) from the Rapid Gravity type Filter Bed / pressure filter carefully, stacking the materials (size wise) where directed. Washing the Gravells/pavells thoroughly, sievingfor stacking size wise for re use of serviceable qtyall as specified and directed. |
| 198 | Labour only for Refilling (loose filling) of Pavels/Gravels of size as removed against item No 197 abovein the Filter Bed of rapid gravity filter complete all as directed. |
| 199 | Labour Only for Refilling (loose filling) quartz sand ofsize 02- 15mmas retrieved from item No 196 in the Filter Bed of rapid gravity filter complete all as directed . |
| 200 | M&L for Fresh quartz sand of size 0.45mm to 0.70mm and coefficient of uniformity shall be between1.3 to 1.7,and silica content should be not less than 90%, filling in layers in the Filter Beds, complete all as specified and directed.Note for item no 195 to 200 : The unit rate is deemed to be included for necessary T & P and scaffolding required for removing and refilling of sand/gravels from the filter beds. |
| 201 | M& L for replacement ofold brokenUPVC pipe 50mm dia from sand bed connecting with new pipe of dia 50mm fixing as per existing pipe all as specified and directed., |
| 202 | Cleaning/ levelling of surface, abroute of vegetation by mechanical means using JCB earth equipment, all as specified and directed. |
| 203 | S&F Open well submersible Pump, 5 HP/3.7 KW, Electric driven 415 V, 3 PH Suction / Delivery of 50/50mm, Head 30-48Mtr, Discharge 425-100 LPMcomplete all as specified anddirected. |
| 204 | S&F Open well submersible Pump, 3 HP/2.2 KW, Electric driven 240 V, single PH Suction / Delivery of 50/40mm, rated voltage 380Volt Head 24 to 30 Mtr, Discharge 6-4.2 LPScompleteall as specified anddirected. |
| 205 | M& L in PCC type D2 1:3:6 (40mm graded aggregates) as in foundation filling and mass concrete of all as specified and directed. |
| 206 | M & L for preparation of old/ existing treated Metal/ steel surface of any description not otherwisedescribesover 10cm width or girth and applying two coats synthetic enamelled paint different tint as directed as in painting to air pressure tank includingwelding the surface where required complete to make the tank leakage proof all as specified and directed. |