Tender For Miscellaneous Cabling Contract For Power Plant Of 3X210mw, A’Tps, Anpara. - Routine maintenance of various cabling works which includes salvaging, laying, lugging, ferruling, glanding and end termination, straight through jointing , repairing, tracing and rectifying of fault in cables of LT power/ control cable of various sizes upto 70 sq.mm. Of any number of core.Aluminium cables- All sizes up to max. size of 70 Sq.mmCopper cables- All sizes up to max. size of 70 Sq.mm Control cables- For ATRS, DAS, Excitation System etc. 2 Salvaging Per Meter 3 HT (1X100 PLCC 35 KV,1X630 XLPE 6.6 KV, 3X150 XLPE 6.6 KV) 4 Laying per meter 5 HT (1X100 PLCC 35 KV,1X630 XLPE 6.6 KV, 3X150 XLPE 6.6 KV) 6 Termination per No. 7 HT (1X100 PLCC 35 KV,1X630 XLPE 6.6 KV, 3X150 XLPE 6.6 KV) 8 Straight jointing per No. 9 HT (1X100 PLCC 35 KV,1X630 XLPE 6.6 KV, 3X150 XLPE 6.6 KV) 10 Salvaging Per Meter 11 LT-1(1.1 KV PVC, 1X1000, 1.5X400, 3X400) 12 Laying per meter 13 LT-1(1.1 KV PVC, 1X1000, 1.5X400, 3X400) 14 Termination per No. 15 LT-1(1.1 KV PVC, 1X1000, 1.5X400, 3X400) 16 Straight jointing per No. 17 LT-1(1.1 KV PVC, 1X1000, 1.5X400, 3X400) 18 Salvaging Per Meter 19 LT-2(1X500, 3.5x300, 3x300, 3.5x240, 3x240) 20 Laying per meter 21 LT-2(1X500, 3.5x300, 3x300, 3.5x240, 3x240) 22 Termination per No. 23 LT-2(1X500, 3.5x300, 3x300, 3.5x240, 3x240) 24 Straight jointing per No. 25 LT-2(1X500, 3.5x300, 3x300, 3.5x240, 3x240) 26 Salvaging Per Meter 27 LT-3 (2x240, 3.5x185, 3x185) 28 Laying per meter 29 LT-3 (2x240, 3.5x185, 3x185) 30 Termination per No. 31 LT-3 (2x240, 3.5x185, 3x185) 32 Straight jointing per No. 33 LT-3 (2x240, 3.5x185, 3x185) 34 Salvaging Per Meter 35 LT-4 (3.5x150, 3x150, 3.5x120) 36 Laying per meter 37 LT-4 (3.5x150, 3x150, 3.5x120) 38 Termination per No. 39 LT-4 (3.5x150, 3x150, 3.5x120) 40 Straight jointing per No. 41 LT-4 (3.5x150, 3x150, 3.5x120) 42 Salvaging Per Meter 43 LT-5 (2x150, 3x120, 2x120) 44 Laying per meter 45 LT-5 (2x150, 3x120, 2x120) 46 Termination per No. 47 LT-5 (2x150, 3x120, 2x120) 48 Straight jointing per No. 49 LT-5 (2x150, 3x120, 2x120) 50 Salvaging Per Meter 51 LT-6 (3.5x95, 3x95, 2x95) 52 Laying per meter 53 LT-6 (3.5x95, 3x95, 2x95) 54 Termination per No. 55 LT-6 (3.5x95, 3x95, 2x95) 56 Straight jointing per No. 57 LT-6 (3.5x95, 3x95, 2x95) 58 Salvaging Per Meter 59 LT-7 Copper (1x120, 1x95) 60 Laying per meter 61 LT-7 Copper (1x120, 1x95) 62 Termination per No. 63 LT-7 Copper (1x120, 1x95) 64 Straight jointing per No. 65 LT-7 Copper (1x120, 1x95) 66 Salvaging Per Meter 67 LT-8 Control cable up to size of 70 Sq.mm and more than 10 mtrs. (cable length) 68 Laying per meter 69 LT-8 Control cable up to size of 70 Sq.mm and more than 10 mtrs. (cable length) 70 Miscellaneous, works related with maintenance of cable racks, trays risers,reducersm Elbows etc. 71 Replacement of deteriorated M.S. Trays. 72 Replacement of deteriorated cable rakes. 73 Erection of junction boxes. 74 provision of riser, reducer, Elbow etc. 75 Erection after modification of various type of TPN switch/starter maximum up to 400 Amp. 76 Removal, re-fixing of tray covers in Boiler area. 77 Removal and re-fixing of chequer plates or grid on Boiler floor for attending cable fault on beneath the racks 78 Fabrication fo cable racks & other steel structures 79 Providing new tray cover at different location and clamping there of as per size. 80 Work ofpart - A required to be done during holidays and oddhours 81 Repair of Hydraulic crimping tool 82 Up keeping of cable gallery, various cable trenches (Ground Level) . 83 A-B Bay of Unit No.-I column 01 to 15 from (-) 4.5 M to 11M. 84 A-B Bay of Unit No.-II column 15 to 25 from (-) 4.5 M to 11M 85 A-B Bay of Unit No.-III column 25 to 36 from (-) 4.5 M to 11M 86 B-C Bay column 06 to 36 from (-) 3 M to 25 M 87 C-D Bay column 06 to 15 from 0 M to deaerator level top 88 C-D Bay of column 15 to 25 from 0 M to deaerator level top 89 C-D Bay of column 25 to 36 from 0 M to deaerator level top. 90 Trenches from 6.6 KV switch gear room to CW Pump house, auxiliary pump house, and clarified water pump house including cable galleries in these plants. 91 Trenches in transformer yard beyond axis including air compressor room up to switch yard control room 92 Cable gallery of main control room of 400 KV and 132 KV system including trenches of ATPS 93 Cable trenches covering auxiliary of service house building of ATPS. 94 Cleaning of cable trenches of Boiler area from Unit switch gear up to ID Fans 95 Underground cable trenches of size 120x2.6x2.5 M3 (From Switch gear of Unit No 1 to ID Fan 1A & 1B) 96 Underground cable trenches of size 120x2.6x2.5 M3 (From Switchgear of Unit No 2 & Unit No 3 to ID Fan 2B & 3A) 97 Underground cable trench of size (80x2.6x2.5) M3(From Main trenches to Coal handling And Fire Pump House) 98 Cleaning of open trenches covered with slab of Boiler area 99 Main trench to ID Fans A&B size3x(80x1.8x1.4 ) M3 (One for each unit) 100 Main trench to PA Fans size3x(80x1.0x1.5 ) M3 (One for each unit) 101 Main trench to FD Fans size3x(80x1.5x1.5 ) M3 (One for each unit) 102 Identification of burnt cable per meter 103 Power cable up to size 200 mm and above 104 Control cable up to size of 70 Sq.mm and more than 100 mtrs. (cable length) 105 Compensating cable upto size of 70 mm and more than 100 mtrs (cable length) 106 Cable laying per meter 107 Power cable upto size 200 mm and above 108 Control cable up to size of 70 Sq.mm and more than 100 mtrs. (cable length) 109 Compensating cable upto size of 70 mm and more than 100 mtrs (cable length) 110 Termination per No. 111 Control cable up to size of 70 Sq.mm and more than 100 mtrs. (cable length) 112 Compensating cable upto size of 70 mm and more than 100 mtrs (cable length) 113 Straight jointing per No. 114 Control cable up to size of 70 Sq.mm and more than 100 mtrs. (cable length) 115 Compensating cable upto size of 70 mm and more than 100 mtrs (cable length) 116 Termination per No. 117 Fault finding and its rectification in existing underground cables by digging of cable trench, laying of new cable, if required, to replace the damage one and refilling and levelling of trench after fault rectification, as per site requirement of permanent station lighting system of ‘A’ T.P.S, Anpara. 118 Work of laying or removal of overhead lighting cable 119 Up to 50 mm square 120 Above from 50mm sq to 300 mm square 121 Work of jointing of Cable through cable jointing kit of different size 122 Work of Jointing of Cable through cable jointing kit of Size: 2.5 mm square x 6 Core 123 Work of Jointing of Cable through cable jointing kit of Size: 6 mm square x 5 Core 124 Work of Jointing of Cable through cable jointing kit of Size: 70 mm square x 3.5 Core 125 Work of Jointing of Cable through cable jointing kit of Size:120mm x3.5Core