|
| 1 | Comprehensive maintenance including renewal/replacement of defective parts of electrically operated1xlift =01 lifts (OTIS Make) each of 08 passengers capacity with selective controls catering for four floors including ground floor, installed at MMG Building in Tehnical\"A\" Area at IRDE Dehradun complete all as specified and directed including any other spare parts required other than mentioned under Ser item 10 to 37 below shall to be deemed included in quoted rates |
| 2 | All as per item No 1 here in above but 1xlifts =01 lifts (OTIS Make) each of 08 passengers capacity with selective controls catering for three floors including ground floor, installed at 36 M tower in Tehnical \"B\"Area at IRDE Dehradun complete all as specified and directed including any other spare parts required other than mentioned under Ser item 10 to 37 below shall to be deemed included in quoted rates |
| 3 | All as per item No 1 here in above but 1xlifts (OTIS make) each of 6 passengers capacity with selective controls catering for three floors including ground floor, installed at Photonics Building Technical \"A\" area at IRDE Dehradun complete all as specified and directed, including any other spare parts required other than mentioned under Ser item 10 to 37 below shall to be deemed included in quoted rates than mentioned under Ser item 09 to 36 below shall to be deemed included in quoted rates |
| 4 | All as per item No 1 here in above but 1xFreight Elevator=01 Freight Elevator(OTIS Make) each of 2000 Kgscapacity with selective controls catering for four floors including ground floor, installed at MMG Building Tehnical\"A\" Area at IRDE Dehradun complete all as specified and directed including any other spare parts required other than mentioned under 10 to 37 belowshall to be deemed included in quoted rates |
| 5 | All as per item No 1 here in above but 1xFreight Elevator=01 Freight Elevator (OTIS Make) each of 2000 Kgscapacity with selective controls catering for three floors including ground floor, installed at Photonic Building in Tehnical \"A\"Area at IRDE Dehradun complete all as specified and directed including any other spare parts required other than mentioned under ser item 10 to 37 below shall to be deemed included in quoted rates |
| 6 | All as per item No 1 here in above but 1xFreight Elevator=01 Freight Elevator(OTIS Make) each of 2000 Kgscapacity with selective controls catering for two floors including ground floor, installed at Optics Building Technical \"B\" area at IRDE Dehradun complete all as specified and directed, including any other spare parts required other than mentioned under Ser item 10 to 37 below shall to be deemed included in quoted rates |
| 7 | All as per item No 1 here in above but1x2= 02 lifts with one manufacturing year 2002 (ECE Make) and one manufacturing year 2023 (OTIS Make) each of 08 passengers capacity with selective controls catering for six floors including ground floor, installed at E-5 Bilding Residential Area at IRDE Dehradun complete all as specified and directedincluding any other spare parts required other than mentioned under Ser item 10 to 37 below shall to be deemed included in quoted rates |
| 8 | All as per item No 1 here in above but 1x3=3lifts with manufacturing year 2002,(ECE make) each of 13 passengers capacity with selective controls catering for six floors including ground floor, installed at D-2,D-3 & C-15 Residential area at IRDE Dehradun complete all as specified and directed,including any other spare parts required other than mentioned under Ser item 10 to 37 below shall to be deemed included in quoted rates |
| 9 | All as per item No 1 here in above but 1x1=1lifts with manufacturing year 2018, (Thyssen make) of 13 passengers capacity with selective controls catering for six floors including ground floor, installed at EOL Building Technical area \"B\" at IRDE Dehradun complete all as specified and directed, including any other spare parts required other than mentioned under Ser item 10 to 37 below shall to be deemed included in quoted rates.Notes for srl item No 1 to 9 here in above:-(i)Major/Minor spare parts replaced by the contractor will not be paid separately except supply only items in Sch \"A\" (item No 10 to 37).The contractor should note that all kinds of repair and replacement has been deemed to be included in rates quoted per month by the contractor this excludes replacement of ARD. (ii) Lifts will be handed over to contractor as and on basis, contractor have to make functional all lifts as per CA provision, the contractor is advised to visit the respective lift site before quoting the rate. (iii)The rate quoted by the contractor are deemed to be included for supply/fixing of the spare parts in lift for any type of spare parts/rewinding of the motors/fans required other than the supply of the store in item No 10 to 37.Labour for fixing these items will be deemed to included in rate quoted per month and will not be paid separetly. |
| 10 | (iv) Lift mechanic should be present from 09:00 Hrs to 17:00 Hrs for attending complaints receiving through JE, lift incharge in IRDE.(v) LED lights to be replaced as and when required at site. Rate for Lampswill be deemed to included in rate quoted per month and will not be paid separetly. (vi) General cleaning/servicing to be done on routine basis. (vi) The testing of lift with 110% load shall be conducted in the presence of JE E/M or Engr-in-Charge as and when asked.The arrangement for testing, load for testing and instrument required shall be arranged by contractor, which has been deemed to be included in rates quoted per month by the contractor. (vii) Repair/maint of lift room as well as cleaning of lift well if required alongwith checking of serviceability of 5/15 A power socket & LED light fittings etc at every floor level in the hoist way.Check the servicieability of 3 Phase supply & earthing from machine room to all equipments shall to be deemed included in quoted rates.Note for 1to 9:- (i) Contractor need toliaise with lift OEM and visit lift sites with OEM company authorised representative to check the complete lift machine roomto identify the performance of lift, comprehensive safety inspection including load testing, emergency stop functionality and other critical safety checks.(ii) After Joint visit , If any repair maintenancerequired in the lift or any spare part then contractor should do the repair maintenance of the lift through OEM supplied part only in complete prospective and specification. (ii) After necessary Checking by OEM, contractor must produce the MoU with lift OEM for eleven month comprehensive maintenance of parts that are available with OEMand submit the ink sign copy to the Engr-in-charge within 30 days of acceptance of tender.(iv) Safety parameter and smooth functioning of lift should be checked by the lift OEM as per MoU at the beginning of tender & consolidated report to besubmitted to Engr-in-charge. (v) During joint inspection, if any suggestion or specificmaintenance related point is suggested by OEM for enhanced lift operation to be submitted to Engineer-in-Charge by contractor. |
| 11 | Supply only Power Contactor 10 to 25 Amps rating (make- LT/ TC/Schneider) suitable for lift complete all as specified and directed. |
| 12 | Supply only relay cards suitable for (OTIS/Thaison/ECE/Kone Make) lift complete all as specified and directed. |
| 13 | Supplyonly in replacement of full length Infra Red Door sensor (make - TVS/Max)complete all as specified and directed |
| 14 | Supplyonly main controller card for OTIS/Thaison/ECE/Kone Make lift complete all as specified and directed |
| 15 | Supplyonly SMPS power supply (make- Delta/MAX) for OTIS/Thaison/ECE/Kone Make lift complete all as specified and directed |
| 16 | Supplyonly floor indicator 7 segment 12/24 Volt DC (make- MAX or equivalent) for OTIS/Thaison/ECE/Kone Make lift complete all as specified and directed |
| 17 | Supplyonly limit switch (make- TVS/MAX ) for OTIS/Thaison/ECE/Kone Make lift complete all as specified and directed |
| 18 | Supplyonly Reed switch (make- TVS/MAX ) for OTIS/Thaison/ECE/Kone Make lift complete all as specified and directed |
| 19 | Supplyonly stop switch (make- TVS/MAX ) for OTIS/Thaison/ECE/Kone Make lift complete all as specified and directed |
| 20 | Supplyonly Emergency alarm for OTIS/Thaison/ECE/Kone Make lift complete all as specified and directed |
| 21 | Supplyonly travelling cable12 core (0.50 sqmm) for OTIS/Thaison/ECE/Kone Make lift complete all as specified and directed |
| 22 | Supplyonly main rope(13mm) make Usha martinfor OTIS/Thaison/ECE/Kone Make lift complete all as specified and directed |
| 23 | Supplyonly door drive (make- Yaskawa/Fuji)for OTIS/Thaison/ECE/Kone Make lift complete all as specified and directed |
| 24 | Supply & fixing of electronic drive in elevator control panel (Main VVVF drive) relevant for 15 HP electric motor complete with key board built in or detachable for proper control & command inputs and proper analysis of errors & trouble shooting by an engineer for proper functioning of OTIS/Thaison /ECE/Kone Make lift complete all as sprcified and directed. |
| 25 | Supply only ARD with battery suitable for OTIS/Thaison/ECE/Kone Make lift complete all as specified and directed. |
| 26 | Supply only ARD instruction plate assembly with nut bolt and hardware complete all as specified and directed. |
| 27 | Supplyonly door shoe suitable for OTIS/Thaison/ECE/Kone Make lift complete all as specified and directed |
| 28 | Supplyonly door safety lock for OTIS/Thaison/ECE/Kone Make lift complete all as specified and directed |
| 29 | Supplyonly thimble for OTIS/Thaison/ECE/Kone Make lift complete all as specified and directed |
| 30 | Supplyonly landing operating panel (LOP) for OTIS/Thaison/ECE/Kone Make lift complete all as specified and directed |
| 31 | Supplyonly car operating panel (COP) for OTIS/Thaison/ECE/Kone Make lift complete all as specified and directed |
| 32 | Supplyonly serial card for OTIS/Thaison/ECE/Kone Make lift complete all as specified and directed |
| 33 | Supplyonly door lock rollerfor OTIS/Thaison/ECE/Kone Make lift complete all as specified and directed |
| 34 | Supplyonly Lift fan suitable for OTIS/Thaison/ECE/Kone Make lift complete all as specified and directed |
| 35 | Supplyonly Alaramsuitable for OTIS/Thaison/ECE/Kone Make lift complete all as specified and directed |
| 36 | Supply only battery 7.5 AH suitable for OTIS/Thaison/ECE/Kone Make lift complete all as specified and directed |
| 37 | Supply only break linner suitable for OTIS/Thaison/ECE/Kone Make lift complete all as specified and directed |
| 38 | Material and labour for numbering on each floor of respective building lift (as G floor, 1 st floor,2 nd floor and so on) each floor wall depending on the level of building served by the lift and writing details on a PVC board specifying JE E/M, AGE E/M, operators details and fixing on top of inside/outside of the lift car at ground floor Note : (i) Each Job is considered for all the levels of the building served & directed by Engineer-in-charge |
| 39 | Supply and replace LED recrssed ceiling light 5w square/round oras per existing type in lift complete all as specified and directed |
| 40 | Supply and replace Rubber mat 5 mm thick in lift siutable for car flooring incl necessary fixing arrangment complete all as specfied and directed |
| 41 | Material and labour forpainting of machinineries including all motors gear box LT electric panel board incl connected accessories etc , installed at lift room , painting with super emamelled Painttwo coats of approved quality with spray gunafter prepatation of surfaces complete all as specified and directed |
| 42 | Material and labour for Cleaing of lift pit and dewatring/lifting of water inside of lift pit by using pum set complete all as specified and directed |