|
| 1 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 2 | Reinforced cement concrete work in arches, archribs, domes, vaults shells, folded plate and roofs having slope more than 15° upto floor five level level including curing but excluding the cost of centering, shuttering finishing and reinforcement with: 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 3 | Extra for Reinforced cement concrete work in super structure above floor 5 level for each four floor or part there of |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for:A)walls |
| 5 | B) Beams,lintel,cantilever |
| 6 | C) Suspended floors, roofs, landings, balconies and access platforms |
| 7 | D) ) Arches, domes, vaults upto 6 m span |
| 8 | E) Edges of slabs and breaks in floors and walls |
| 9 | F) Extra for arches, domes, vaults exceeding 6 m span |
| 10 | G)Extra for additional height in centering, shuttering where ever required with adequate bracing, propping etc. including cost of de-shuttering and de-centering at all levels, over a height of 3.5 m, for every additional height of 1 meter or part thereof (Plan area to be measured).Suspended floors, roofs, landings, beams and balconies (plan area to be measured |
| 11 | Providing and applying CEMENT PLASTER (IN FINE SAND) 12mm Cement plaster of mix:1 : 4 ( 1 cement : 4 fine sand) |
| 12 | Extra for plastering exterior walls of the height more than 10m from ground level for every additional height of 3m or part thereof |
| 13 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth leveThermo-Mechanically Treated bars of grade Fe-500D or more. |
| 14 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates |
| 15 | Providing and fixing of 1 mm thick MS sheet door with frame of 40x40x6mm thick angle iron and 3mm M.S. gusset plate at the junction and corners all neccesary fitting complete including applying a priming coat of approved steel primer |
| 16 | Extra forProviding and mixing water proofing material in cement concrete work in doses by weight of cement as per manufacturer’s specification. |
| 17 | Supply,installation,testing,commissioning of lightening conductor made of 25mm dia 300mm long copper tube having single prong at top with base plate |
| 18 | Supply and fixing of 25x5mm copper strip in 40mm dia G.I. pipe FRI earth electode including connection with brass nuts bolts,washer,excavation and refilling |
| 19 | Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etcA) 150 MM |
| 20 | B) 100 MM |
| 21 | Providing and fixing of 10mm thick M.S. flanges to G.I.pipes including cost of nuts,bolts,washer,wielding,and cutting of threadesA) 150 MM |
| 22 | D) 100 MM |
| 23 | Providing and fixing ofsluice valve of different denomination for regulating supplies from O.H.T.including all carriageE) 150 MM |
| 24 | F) 100 MM |
| 25 | Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm) |
| 26 | Providing and fixing triple tyre scaffolding system(cup lock type) on exterior side of structure upto 25 mtrs of height above ground level,including additional rows of scaffolding in stepped manner as per requirement of site,made with 40mm dia M.S tube,placed 1.5 mtrc/c,horizontal and vertical tubes joint with cup and lock system with M.S tube maintaining it in a serviceable condition of execution of work for cleaning,pointing,applying chemical and removing it their after the scaffolding system shall be stiffened with bracing,runners connecting with the building etc where ever required.if feasible for inspection of work at req. location with essential safety features for the work men etc,complete job or as per direction of site engineer in charge |