| 1 | Carrage of following line materials from ESC to work site inculding safe loading and unloading at both ends as per site condition:- |
| 2 | ST Pole 11 mtr Long |
| 3 | PCC Pole 8.5 Mtr. Long |
| 4 | ACSR Weasel conductor |
| 5 | 11 KV Pin Insulator |
| 6 | 11 KV Pin Disc Insulator with fitting |
| 7 | Stay set complete |
| 8 | 11 KV X-arms V-Type |
| 9 | LT XLPE armoured Cable 3.5x50 sqmm |
| 10 | Earthing set complete |
| 11 | LT Distribution Box 3 Phase |
| 12 | LT ABC Cable(3x120+1x95+1x16) Sqmm. |
| 13 | LT ABC Cable(3x95+1x70+1x16) Sqmm. |
| 14 | MS channel/angle |
| 15 | Errection of ST Pole 11 Mtr Longand fixing all accessories as per norms (Nut, bolts, and clamps will be provided by contractor) |
| 16 | Errection of PCC Pole 8.5 Mtr Longand fixing all accessories as per norms (Nut, bolts, and clamps will be provided by contractor) |
| 17 | Errection of Double ST Pole Structure and fixing all accessories as per norms (Nut, bolts, and clamps will be provided by contractor) |
| 18 | Errection of Double PCC Pole Structure and fixing all accessories as per norms (Nut, bolts, and clamps will be provided by contractor) |
| 19 | Earting of Pole by MS earthing complete |
| 20 | Laying of weasel Condouctor |
| 21 | Febrication of MS channel/angle |
| 22 | Laying of LT ABC Cable(3x120+1x95+1x16) Sqmm. (Nut, bolts and clamps will be provided by contractor) |
| 23 | Laying of LT ABC Cable(3x95+1x70+1x16) Sqmm. (Nut, bolts and clamps will be provided by contractor) |
| 24 | Installation and commissioning of LT distribution box 3 phase |
| 25 | Laying of LT XLPE Cable 3.5x50 sqmm |
| 26 | Errection of stay complete and Grouting of stay rods including all work of excavation, cementconcreet in size .60x.60x.30mm in ration 1:4:4 (Cement, sand, 40mm brick ballast) as per drg. including back filling & proper ramming etc. with fixing tightening & nuzzling of stay set with the pole (all material provided by contractor). |
| 27 | Grouting of Pole with cement, sand, bricks CC ratio 1:4:4 as per RESPO norms (all material provided by contractor). |
| 28 | Dismentiling of 25 KVA transformer form D/P and disconnection of LT and HT side |
| 29 | Dismentiling of 63 KVA transformer form D/P and disconnection of LT and HT side |
| 30 | Mounting of 25 KVA/63 KVA T/F on D/P and making connection properly. |
| 31 | Dismentiling of following materials and carrage of materials from site to JE Store inculding safe loading and unloading at both ends as per site condition - |
| 32 | ST Pole old and used |
| 33 | ACSR Weasel scrap |
| 34 | R-S Joist Pole off size |