|
| 1 | Supply and fabrication of new stainless steel plate/flat (AISI - 304) of suitable size on seal beam / roller track/ slide track/ side seal seats/ top seal seat by welding (SS) as per direction of the Engineer- in-charge including cost of Materials, Machinaries , Manpower, Cutting, Aligning, Welding, Finishing, Consumables, Carriage and all overheads with all leads and lifts complete as per specification. |
| 2 | Supply & Deliveryof Deep Groove Ball Bearing -No-6306. |
| 3 | Supply & Deliveryof Deep Groove Ball Bearing -No-6205. |
| 4 | Supply & Deliveryof Deep Groove Ball Bearing -No-6310. |
| 5 | Supply & DeliveryofTapered Roller Bearing No-30207 J2/Q |
| 6 | Supply & Deliveryof Thrust Ball Bearing -No-51110. |
| 7 | Supply & DeliveryofTapered Roller Bearing No-BT1-0525/VU1006 (32209 type) |
| 8 | Supply, installation, testing and commisioning of following items for hoisting system and gear box as mentioned bellow as per direction including cost of materials, machinaries, manpower, cutting, machining, aligning, anchoring, welding, finishing, consumables,Carriage and all overheads with all leads and lifts complete as per specification ( without painting) |
| 9 | Base frame (MS) |
| 10 | Shaft /Pin with key ways made of ss-304 |
| 11 | Coupling (Mat: C45) |
| 12 | Gear and Pinion ( Forged steel) |
| 13 | Supply of Gear Oil as per direction of Engineer in charge. |
| 14 | Supply of Grease. |
| 15 | Supply fitting Fixing of ss (AISI 304) bolts, nut & washer. i) dia 10 mm to 20 mm a) Length upto 75 mm |
| 16 | Servicing of headstock assembly i.e. opening the hand wheel from screw rod, including opening the thrust bearing from top and bottom thrust plate of bearing housing, nut, coller etc and cleaning all the components with the help of Kerosine and emery paper and re-fitting the same including changing necessary nuts & bolt after greasing the thrust bearing if Ok otherwise replaced by new one (excluding the cost of bearing, supplied separately) and fileing work if required for fixing to the pedestal upto the satisfaction of E.I.C. The cost includes cost of materials, man power employed, kerosene, grease, consumables like emery paper, cloths, blots & nuts, hire chargesof tools & tackles etc. |
| 17 | Oiling greasing of hoisting gear boxes ( for rope drun and chain hoist) ofregulator gates of canal/rivers by cleaning, checking,greasing /lubricating the gears, plummer bocks, bearings, manual drive etc including all charges of man and materials which include oiling greasing refilling of gear oil excluding supply of gear oil and grease and fixing of damaged oil seals & missing nuts & biltsetc complete as per direction of EIC.( Gear oil and Grease provided Extra) |
| 18 | Servicing/ Overhauling of Driving Motor 2 HP/ 3 HP, Heat burnishing to achive desire IR value with all rectifisations/ replcement of damaged bearings, alignment checking, connections and terminal wires as per the desired standard and to the satisfaction of E.I.C. |
| 19 | Rewinding with approved quality Super Enamel copper winding wire of standard guage as provided by motor manufacturer including slot insulation as per Indian Electrical Rules, shouldering the cable joints properly, taping with 660 V. Grade water proof tape, making new loop terminals heating and vernishing with \"E\" class golden vernish (Jhonson & Nicolson make) so as to develop original rated rpm, supplying all necessary materials as mentioned above and reassemblying the motor (a) 3 H.P./5 H.P. 3 Phase, 410-440 votls, 50 Hz, 2/4 pole induction Motor (i) Supply of super enamelled dual coated copper wire conforming IS 13730, 1996, part 13 (18 swg to 22 swg). required max. weight of super enamelled copper wire is given as:For Crompton/NGEF/Sabar/Anil Venus etc. - 3.6 Kgs For GEC-4.5 Kgs |
| 20 | (ii) Labour charge for rewinding, soldering, heat varnishing, bearing changing, reassemling etc. including supply of all materials excluding bearing as mentioned above complete in all respect as per direction of E.I.C |
| 21 | Cost for supplying and fitting fixing of Flat rubber seal (Make : Universal Moulders & Engineer/Popular Rubber Works (Pvt) Ltd/ SAB Industries/Unique Polymer Works/equivelant approved make conforming to lS : 11855 -2011/Latest Revision) for different types of gate shutter as per direction of E.I.C. The cost includes cost of man power employed for fitting fixing, cost of rubber seal, hire charges of tools & tackles, scaffolding and safety equipments etc including carriage loading & unloading but excluding supply of ms clamp/ flat plate, bolts, nuts and washer. Size-100 x 12 mm |
| 22 | Painting hoist structural components, tressle bridge ,crane, lifting beam, cat work bridge and other similar structure on prepared surfaces with two coats of zinc phosphate primer (airless spray preferred) 40 microns/coat and followed by two coats of synthetic enamel paint 25 microns/coat including cost of all materials, labour, scaffolding etc., complete with all leads and all lifts. |
| 23 | Add:GST @ 18% |
| 24 | Add: LWC @ 1% |
| 25 | Less: Scrap value @5% for sl item no. 1 to 8 (8.01 to 8.04) and @8% for sl item no.15 will be deducted from the final tendered amount during billing. |