| 1 | Construction ofDrainage and Verical Filter at Colony Kakkan street in V.Sathanuranchayat |
| 2 | Earth work excavation for foundation in all classes of soils and sub soil to full depthexcept in hard rock requiring blasting but inclusive of shoring struttingif required forthe sides of foundation. |
| 3 | 0-0.30m |
| 4 | Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed. |
| 5 | Cement Concrete 1:2:4 mix using 20 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed. |
| 6 | Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels, |
| 7 | below |
| 8 | Providing veritical filter |
| 9 | Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations . |
| 10 | Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jellyincluding labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc complete |
| 11 | Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete. |
| 12 | Cement Concrete : 1:2:4 with broken stone jusing 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete. |
| 13 | Fillingthe Vertical Filterwith following materials as per specification |
| 14 | 225mm Boulders |
| 15 | 40mm metal |
| 16 | 20mm metal |
| 17 | 10-12mm metal |
| 18 | Towards Cost and Supply of RCC Ring |
| 19 | Towards Cost and Supply of RCC Cover Slab |
| 20 | Towards Cost and Supply ofPrecast Slab |
| 21 | Towards labour charges for filling metal into the pipe and fixing PVC pipe |
| 22 | Provision for Name board charges |
| 23 | Provision for photographic charges |
| 24 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |