tender for Chalachitra Satabarsha Bhaban - 31St Kiff-Repairing And Painting Work Of Power Sub- Station Building work - 1 Dismantling carefully terraced floor only (including floor finish if any) or lime terracing in ground floor roof and removing rubbish as directed within a lead of 75 m. (a) In Ground Floor including roof. In 4th floor 2 Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. 3 Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. (a) In ground floor including roof. In Firt Floor 4 Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.a) Pakur Variety In Ground Floor 5 (a) Applying 2 coats of bonding agent with synthetic multi functional rubber emulsion having adhesive and water proofing properties by mixing with water in proportion (1 bonding agent : 4 water : 6 cement) as per Manufacturers specification [Cement to be supplied by the Department] 6 Cement concrete (1:1.5:3) with graded stone chips 5.6 mm size with hexagonal square mesh wire netting, I.R.C. fabric mesh or X.P. M. fitted and fixed after tying the existing reinforcement on concrete without distributing the same and with proper scarping and cleaning the reinforcement and disturbed concrete with wire brush etc. after applying a coat of cement including the cost of wire netting I.R.C or X. P. M. & cost of all handling and scaffolding complete as per direction of Engineer-in -charge. b) 25 mm thick 7 Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.(i) Pakur VarietyIn 1st floor 8 Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof) 9 Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel I.SAIL/ TATA/RINL 10 scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](i) With 1:6 cement mortar (b) 20 mm thick plaster 11 (i) With 1:6 cement mortar (c) 15 mm thick plaster 12 (c) 10 mm thick plaster 13 Roof treatment by application of non toxic polyurethane modified acrylic based single component ( P U Roof Coat) solvent free cold applied polyurethane modified elastomeric waterproofing membrance with execellant UV resistant capasity as per ASTM D6083 water based 100% acrylic elastomeric emulsion polymer latex coaating..... used as protective coating for roofs after preparing the surface by cleaning and repairing the roof cracks by cement & sand mortar (to be paid separately) if any, apply two coats along with a priming coat (two coats of PU roof coat and one coat of primer coat compatiable with main product as per manufactures specification ) and reinforced with or without 20 gsm Geotextile Fleece including cost of primer coat and basepreparation tools & plants but excluding the cost of scaffolding and stagging complete 14 Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge 15 Bituminous filler of approved type in expansion joints of dummy joints including finishing the top surface as directed. 16 Glazed shutters of doors, windows, fan light, clerestory windows etc. as per design (with ordinary glass of 7.4kg./sq.m. 3mm. Thick) fitted with putty bed and teak wood bead and nails including fitting and fixing shutter in position but excluding the cost of hinges and other fittings. cost of glass, putty, wooded beads etc.will be paid separately. In ground floor (ii) 35mm thick shutters.(b) Sishu,Gamar, Champ,Badam,Bhola, Mogra, Hallak. 17 Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be correted upto three decimals). (d) Sal : Local. 18 Removing old scales, blisters etc. of interior surface of walls,ceiling by scraping etc. and preparing smooth and even surface with rendering or cement mortar (1:2) (as necessary), to make the surface suitable for receiving distemper. (Payment against this item will be made only when this has been done on the specific direction of the Engineer-in-charge).In ground floor 19 Acrylic Distemper to interior wall, ceiling with a coat of solvent based interior grade acrylic primer (as per manufacturers specification) including cleaning and smoothning of surface. Two Coats 20 Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturers specification and as per direction of the EIC. In Ground Floor: (a) One Coat 21 Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturers specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost ofprimer. In Ground floor (Two Coat)b) Premium 100% Acrylic Emulsion 22 Supplying, fitting & fixing UPVC pipes A- Type and fittings conforming to IS:13592-1992 with all necessary clamps nails, including making holes in walls, floor etc. cutting trenches in any soil through masonry concrete structures etc if necessary and mending good damages including joining with jointing materails (Spun Yarn, Valamoid/Bitumen/M-Seal etc) complete A) UPVC Pipes: (iii) 160 mm. Dia 23 B) UPVC Fittings c) Bend 87.5 degree (iii) 160 mm. Dia. 24 d) Shoe (iii) 160 mm. Dia. 25 Sub Total 26 GST 18% 27 CESS 1%