Erection Of 33 Kv Xlpe Cable Ug Emanated From Siliguri 132 33 Kv Substation To Proposed Sevoke 33 11 Kv Substation Under Siliguri Town Division, siliguri-West Bengal

West Bengal State Electricity Distribution Company Limited has published Erection Of 33 Kv Xlpe Cable Ug Emanated From Siliguri 132 33 Kv Substation To Proposed Sevoke 33 11 Kv Substation Under Siliguri Town Division. Submission Date for this Tender is 14-10-2025. XLPE Cable Tenders in siliguri West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

51273187
Erection Of 33 Kv Xlpe Cable Ug Emanated From Siliguri 132 33 Kv Substation To Proposed Sevoke 33 11 Kv Substation Under Siliguri Town Division
Tender
Indian
West Bengal
Siliguri
14-10-2025

Tender Details

Erection Of 33 Kv Xlpe Cable Ug Emanated From Siliguri 132 33 Kv Substation To Proposed Sevoke 33 11 Kv Substation Under Siliguri Town Division- 1 Erection of 4-Pole structure by H-Beam Joist Pole with all Fittings, foundation and painting but without any Insulator (SIX POLE ARRANGEMENT) 2 Erection of DP Structure by H-Beam Joist Pole with all Fittings, foundation and painting but without any Insulator.(SIX POLE ARRANGEMENT) 3 Erection of 4-Pole structure by H-Beam Joist Pole with all Fittings, foundation and painting but without any Insulator 4 Erection of DP Structure by H-Beam Joist Pole with all Fittings, foundation and painting but without any Insulator 5 Erection of Single H-Beam Joist Pole with all Fittings, Foundation and painting but without any insulator 6 Extension Of Pole complete with all fittingsupto 3 Mtr Long with painting. 7 Earthing Complete with driving of earth spike & connection of earthelectrode with non-current carryingmetallic parts of supports, stay wires, craddle guards , LA etc 8 Erection of stay set H.T complete with all fittings 9 Fixing of Pin Insulator33 kv Polymer 10 Fixing of Disc Insulator33 kv 70 KN Polymer 11 Fabrication & Fixing of CG Bracket Doublepole 12 Fixing of LA 42 KV(1 Set=3Nos.) 13 Fixing of 42 KV LA Structure 14 Fixing of Compression Joint for Wolf Conductor 15 Stringging & Sagging of Conductor Wolf 150 Sqmm 3 Wire 16 Fixing of Lead wire Above 60 mtr upto 100 mtr. 2 wire 17 Fixing of Lead wire Above 30 mtr upto 60 mtr. 2 wire 18 Making & fixing of cross lacing wire 19 Excavation of soil as per Instruction of site Engineer including Backfilling ofthe Excavated Soil 20 Supply of Bricks by the Vendor as per instruction of EIC 21 Laying of bricks in the trench 22 Erection of 33 KV 400 A CR Type Isolator with ES ( H/L) 23 Erection of Pipe Earthing 24 Laying ofheavy duty HDPE Pipe by Microtunelling work(as per guideline of WBSEDCL ) ,in rocky/semi rocky /ordinary soil without disturbing the regular railway or vehicular traffic above maintaining statutory depth under railway track or highway carriageway with sealing or plugging & earthing complete at both end including supply of 200 mm (dia) NB HDPE pipe 10 mm (thickness) and associated materials and 25 laying of 400 sqmm 33KV XLPE CABLE(3C) as per IS:4984-2016,PE 80 PN 6 26 Laying of 33 kV (E) 3C x 400 Sq.mm XLPE Cable above ground or riser cable through suitable size of Ductilepipe where excavation of earth is not required. 27 Supply & Laying of suitable size of Ductilepipe for 33 kV (E) 3C x 400 Sq.mm XLPE Cable above ground or riser up to 6 MTR with necessary clamp fitting. 28 Laying Cable loop in suitable Pit 29 Laying & dressing of33 KV XLPE cable in the excavated cable trenches as per drawing no. PLN(D)/SS/126, dt. 23.06.2018 and instruction of the Site Engineer. 30 Making of jointing pit only by the excavation of soil suitable for making of 33 KV straight through joint ofcables including laying of platform with bricks for placement of joint box & pitching up of temporary tent by providing bamboo & tarpolene & re-instatement, of the joint pit with the excavated soil after completion of jointing work 31 Making of Straight Through/Transition Joint including making of jointing pit of the 33 KV XLPE cable without supply of jointing materials excluding naking ofprotection duct for cable joint 32 Fixing cable termination support on H Beam Joist SP (Solid T-off) 33 Making & fixing of end termination joint indoor or outdoor type for 33 KV XLPE cable including fixing of the jointing box at the existing structure but without the jointing materials as per instruction of the Site Engineer. 34 Fixing Cable support angle (bracket fixing) 35 Fixing of Bow Stay Angle 36 Fixing of XLPE Cable Support Angle -33 KV 37 Supply & Erection of Cast Iron Marker 38 GIS Survey (OH & UG Nodes) 39 Survey of 33 KV HTOH Line 40 Survey for 33 KV XLPE Cable

Key Value

Document Fees
Refer document
EMD
INR 500000.0 /-
Tender Value
INR 6.59 Crore /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail