}

Tender For Repairing Of Leakage In Existing Distribution/Rising Main/Transmission Main Ac/Pvc/Hdpe Pipe Line Up To 1.5 Mtr Depth Of Sizes As Given Below By Digging Out Suitable Size Of Pit At Site Of Work Including Dewatering And Providing Adequate Saf, Chittorgarh-Rajasthan

Public Health Engineering Department has published Tender For Repairing Of Leakage In Existing Distribution/Rising Main/Transmission Main Ac/Pvc/Hdpe Pipe Line Up To 1.5 Mtr Depth Of Sizes As Given Below By Digging Out Suitable Size Of Pit At Site Of Work Including Dewatering And Providing Adequate Saf. Submission Date for this Tender is 25-09-2025. Pipe Laying Tenders in Chittorgarh Rajasthan. Bidders can get complete Tender details and download the document.




Tender Notice

51259529
Tender For Repairing Of Leakage In Existing Distribution/Rising Main/Transmission Main Ac/Pvc/Hdpe Pipe Line Up To 1.5 Mtr Depth Of Sizes As Given Below By Digging Out Suitable Size Of Pit At Site Of Work Including Dewatering And Providing Adequate Saf
Tender
Indian
Rajasthan
Chittorgarh
25-09-2025

Tender Details

Tender for Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refilling of excavated trench/pit/road shall be done properly i.e. after a layer of 20cm with propoer watering and ramming in layers. For entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 2 1.1.1 In all type Soil AC/PVC/HDPE pipe 3 1.1.1.1 50/63/75mm Each 298.00 4 1.1.1.2 80/90mm Each 309.00 5 1.1.1.3 100/110mm Each 359.00 6 1.1.1.4 125/140mm Each 441.00 7 1.1.1.5 150/160/180mm Each 467.00 8 1.1.1.6 200/225mm Each 749.00 9 1.1.1.7 250/280mm Each 987.00 10 1.1.1.8 300/315mm Each 1009.00 11 1.1.1.9 350mm Each 1301.00 12 1.1.1.10 400mm Each 1356.00 13 1.1.2 Add on above item no. 1.1 for B.T. Road Each 5% 14 1.1.3 Add on above item no. 1.1 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only. Each 15% 15 1.1.4 Add on above no. 1.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. Each 20% 16 1.1.5 Add on above no. 1.1 item if depth of pipeline is above 3.0 mtr. Each 30% 17 1.2 Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost) 18 1.2.1 In all type Soil 19 1.2.1.1 80mm Each 356.00 20 1.2.1.2 100mm Each 406.00 21 1.2.1.3 125mm Each 447.00 22 1.2.1.4 150mm Each 528.00 23 1.2.1.5 200mm Each 731.00 24 1.2.1.6 250mm Each 1143.00 25 1.2.1.7 300mm Each 1178.00 26 1.2.1.8 350mm Each 1439.00 27 1.2.1.9 400mm Each 1692.00 28 1.2.2 Add on above item no. 1.2 for B.T. Road Each 5% 29 1.2.3 Add on above item no. 1.2 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only. Each 15% 30 1.2.4 Add on above no. 1.2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. Each 20% 31 1.2.5 Add on above no. 1.2 item if depth of pipeline is above 3.0 mtr. Each 30% 32 1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 33 1.3.1 In all type Soil 34 1.3.1.1 50/63/75mm Each 214.00 35 1.3.1.2 80/90mm Each 221.00 36 1.3.1.3 100/110mm Each 290.00 37 1.3.1.4 125/140mm Each 318.00 38 1.3.1.5 150/160/180mm Each 327.00 39 1.3.1.6 200/225mm Each 423.00 40 1.3.1.7 250/280mm Each 722.00 41 1.3.1.8 300/315mm Each 873.00 42 1.3.1.9 350mm Each 972.00 43 1.3.1.10 400mm Each 1088.00 44 1.3.2 Add on above item no. 1.3 for B.T. Road Each 5% 45 1.3.3 Add on above item no. 1.3 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only. Each 15% 46 1.3.4 Add on above no. 1.3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. Each 20% 47 1.3.5 Add on above no. 1.3 item if depth of pipeline is above 3.0 mtr. Each 30% 48 1.4 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) 49 1.4.1 In all type Soil 50 1.4.1.1 80 mm Each 617.00 51 1.4.1.2 100 mm Each 661.00 52 1.4.1.3 125 mm Each 738.00 53 1.4.1.4 150 mm Each 870.00 54 1.4.1.5 200 mm Each 1010.00 55 1.4.1.6 250 mm Each 1423.00 56 1.4.1.7 300 mm Each 1697.00 57 1.4.1.8 350 mm Each 2125.00 58 1.4.1.9 400 mm Each 2514.00 59 1.4.2 Add on above item no. 1.4 for B.T. Road 5% 60 1.4.3 Add on above item no. 1.4 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only. Each 15% 61 1.4.4 Add on above item no. 1.4 if depth of pipe line is above 1.5 mtr to 3.0 mtr Each 20% 62 1.4.5 Deduct on above item no. 1.4 if valve is fixed at plinth level / platform i.e. no excavation is required Each 20% 63 1.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 64 1.5.1 In all type Soil 65 1.5.1.1 75 mm Each 353.00 66 1.5.1.2 90/80 mm Each 364.00 67 1.5.1.3 110/100 mm Each 427.00 68 1.5.1.4 140/125 mm Each 496.00 69 1.5.1.5 180/160/150 mm Each 549.00 70 1.5.1.6 225/200 mm Each 1028.00 71 1.5.1.7 250 mm Each 1128.00 72 1.5.1.8 300 mm Each 1183.00 73 1.5.2 Add on above item no. 1.5 for B.T. Road Each 5% 74 1.5.3 Add on above item no. 1.5 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only. Each 15% 75 1.5.4 Add on above item no. 1.5 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. Each 20% 76 1.5.5 Add on above item no. 1.5 if depth of pipe line is above 3.0 mtr. Each 30% 77 1.6 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 78 1.6.1 In all type Soil 79 1.6.1.1 80 mm Each 394.00 80 1.6.1.2 100 mm Each 479.00 81 1.6.1.3 125 mm Each 494.00 82 1.6.1.4 150 mm Each 549.00 83 1.6.1.5 225/200 mm Each 1062.00 84 1.6.1.6 250 mm Each 1235.00 85 1.6.1.7 300 mm Each 1290.00 86 1.6.2 Add on above item no. 1.6 for B.T. Road Each 5% 87 1.6.3 Add on above item no. 1.6 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only. Each 15% 88 1.6.4 Add on above item no. 1.6 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. Each 20% 89 1.6.5 Add on above item no. 1.6 if depth of pipe line is above 3.0 mtr Each 30% 90 1.7 Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it & upto ground level for entire job contractor will use his own T&P & labour. Per Job 402.00 91 1.7.1 Add on above item no. 1.7 for B.T. Road Each 5% 92 1.7.2 Add on above item no. 1.7 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only. Each 15% 93 1.7.3 Add on above item no. 1.7 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr Each 20% 94 1.8 Removal of sluice valve in existing pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost) 95 1.8.1 In all type Soil 96 1.8.1.1 80 mm dia pipe to 100mm Each 399.00 97 1.8.1.2 125 mm dia pipe to 150mm Each 468.50 98 1.8.1.3 200 mm dia pipe to 250mm Each 726.50 99 1.8.1.4 300 mm dia pipe to 350mm Each 1264.00 100 1.8.1.5 400mm Each 1758.00 101 1.8.2 Add on above item no. 1.8 for B.T. Road Each 5% 102 1.8.3 Add on above item no.1. 8 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only. Each 15% 103 1.8.4 Add on above item no. 1.8 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr Each 20% 104 1.9 Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). 105 1.9.1 In all type Soil 106 1.9.1.1 80 mm to 110 mm Each 1532.00 107 1.9.1.2 125 mm to 165 mm Each 2043.00 108 1.9.1.3 200 mm to 300 mm Each 2665.00 109 1.9.2 Add on above item no. 1.9 for B.T. Road Each 5% 110 9.1.3 Add on above item no. 1.9 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only. Each 15% 111 1.9.4 Add on above item no. 1.9 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr Each 20% 112 1.10 Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). 113 1.10.1 In all type Soil 114 1.10.1.1 80 mm to 100 mm Each 1731.00 115 1.10.1.2 125 mm to 150 mm Each 2143.00 116 1.10.1.3 200 mm to 300 mm Each 2826.00 117 1.10.1.4 350 mm to 450 mm Each 3036.00 118 1.10.1.5 500 mm to 600 mm Each 3603.00 119 1.10.2 Add on above item no. 1.10 for B.T. Road Each 5% 120 1.10.3 Add on above item no. 1.10for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only. Each 15% 121 1.10.4 Add on above item no. 1.10 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr Each 20% 122 1.11 Labour charges for removal of complaint of polluted water supply to the consumers 123 1.11.1 Survey of the locality of polluted water supply for preliminary assessment of source of pollution during supply hours Each survey 715 124 1.12 Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size 125 1.12.1 In all type Soil 126 1.12.1.1 50 to 75 mm Each 452.00 127 1.12.1.2 80-110 mm Each 488.00 128 1.12.1.3 125 to 165 mm Each 582.00 129 1.12.1.4 200 to 300 mm Each 981.00 130 1.12.1.5 350 to 400 mm Each 1367.00 131 1.12.2 Add on above item no.1.12 for B.T. Road Each 5% 132 1.12.3 Add on above item no. 1.12 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only. Each 15% 133 1.12.4 Add on above item no. 1.12 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. Each 20% 134 1.13 Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution CI/DI/MS pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size 135 1.13.1 In all type Soil Each 136 1.13.1.1 80-100 mm Each 505.00 137 1.13.1.2 125 to 150 mm Each 599.00 138 1.13.1.3 200 to 300 mm Each 1034.00 139 1.13.1.4 350 to 400 mm Each 1405.00 140 1.13.2 Add on above item 1.13 for B.T. Road Each 5% 141 1.13.3 Add on above item no. 1.13 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only. Each 15% 142 1.13.4 Add on above item no.1.13 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. Each 20% 143 1.14 Restoration of bitumen road by patch work of WBM using crushed / broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material , cleaning of surface of WBM and providing of seal & tack coat as per site condition by using ready cold mix up to the satisfaction of engineer in charge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job. Per Sqm 681.00 144 1.15 Restoration of cement concrete road including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compacting cement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction of engineer incharge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job. Per Sqm 1066.00

Key Value

Document Fees
Refer document
Tender Value
INR 3 Lakhs /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail