| 1 | SOR Item No. 15.31.1:-Dismantling and stacking within 50 metres lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base of : Iron or pipe: T’ or ‘L’ iron or pipe |
| 2 | SOR Item No. 15.33:- Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metres lead. |
| 3 | SOR Item No. 10.2:-Structural steel work using M.S. flats, angles, channels I-section, H-section etc. riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 4 | SOR Item No. 10.24.5:-Providing and fixing carbon steel galvanised (minimum coating 5 micron) dash fastener of 10 mm dia double threaded 6.8 grade (yield strength 480 N/mm2), counter sunk head, comprising of 10 mm dia polyamide PA 6 grade sleeve, including drilling of hole in frame, concrete/ masonry, etc. as per direction of Engineer-in-charge: 10x160mm |
| 5 | SOR Item No. 2.6 :-Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including dressing of sides and ramming of bottom disposal of excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly dressed. (No extra lift is payable if work is done by mechanical means) All kinds of soil |
| 6 | SOR Item No. 2.5 :- Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m lead and lift up to 1.5 m, disposed soil to be levelled and neatly dressed, All kinds of soil |
| 7 | SOR Item No. 4.1.2.3 :-Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level : M-7.5 Nominal Mix -1 Cement : 4 sand : 8 graded stone aggregate. |
| 8 | SOR Item No. 4.3.1:-Centering and shuttering including strutting, propping etc. and removal of form work for :Upto plinth: Foundations, footings, bases for columns, plinth beams, curtain walls, columns below plinth |
| 9 | SOR Item No.4.1.1.3 :- C.C. upto plinth level Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level : M-15 – Grade concrete |
| 10 | SOR Item No. 10.35 :-Providing and fixing G.I. chain link fabric fencing of required width in mesh size 25x25 mm made of G.I. wire of dia. 3mm including strengthening with 2mm dia. wire or nuts, bolts and washers as required complete, with posts of specified material and of standard design placed and embedded in cement concrete blocks 45x45x60cm of mix 1:5:10 (1cement :5 sand : 10 graded stone aggregate 40mm nominal size) every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and struts embedded in cement concrete blocks 70x45x50cm of the same mix, as per the direction of Engineer-in- Charge. (cost of post painting earth work & C.C. to be paid separately) |
| 11 | SOR Item No. 10.35 :- Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats on new work. |