| 1 | Supply Item |
| 2 | Aluminium bus bar 700X75X10 mm.(As per Specification of RESPO & UPCL) |
| 3 | 11 KV Fuse Set(As per Specification of RESPO & UPCL) |
| 4 | LT XLPE 1X400 SQ.MM.-D(As per Specification of RESPO & UPCL) |
| 5 | Wire Mesh Fencing(As per Specification of RESPO & UPCL) |
| 6 | AL CRIMPING TYPE LUGS 400 SQ. mm(As per Specification of RESPO & UPCL) |
| 7 | Earth Electrode(As per Specification of RESPO & UPCL) |
| 8 | DTR Maintenance Work |
| 9 | CEMENT PLASTER WORK |
| 10 | Earthing of support with M.S. Earth rod of 2.5 meter long by hammaring of M.S. Rod to proper depth and connecting the earth electrode with the helpof G.I. wire as per construction manual. |
| 11 | Fabrication of M.S. Channel Angle iron after cutting in requiredsizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc. as per RESSPO sehedule and local approved drawing. |
| 12 | Dismantling of 160 KVA Transformers from double pole /plinth including openingof all connections, circuts & earthing strip etc. |
| 13 | Dismantling of 250 KVA Transformers from double pole /plinth including openingof all connections, circuts & earthing strip etc. |
| 14 | Dismantling of 400 KVA Transformers from double pole /plinth including openingof all connections, circuts & earthing strip etc. |
| 15 | PAINTING OF YARD |
| 16 | EXCAVATION OF EARTH FOR DTR PLINTH |
| 17 | CEMENT CONCRETING WORK DTR PLINTH |
| 18 | BRICK WORK IN 1:4 RATIO DTR PLINTH |
| 19 | RR MASSONARY WORK FOR DTR PLINTH |
| 20 | RCC WORK OF DTR PLINTH. |
| 21 | FENCING OF DTR |
| 22 | Installationof 400/500 KVA Tranformer on plinthstructure and fixing of channel / angle etc. and making all connections of Ht and LT side and its complete commissioning. |
| 23 | Installationof 250 KVA Tranformer on plinthstructure and fixing of channel / angle etc. and making all connections of Ht and LT side and its complete commissioning. |
| 24 | Installationof 160 KVA Tranformer on plinthstructure and fixing of channel / angle etc. and making all connections of Ht and LT side and its complete commissioning. |
| 25 | fixing of fuse set with complete in all respect. |
| 26 | Cartage of other material (other than poles) by vehicle fro Store Center to nearest construction site Store including loading and unloading at both ends,21-50 KM |
| 27 | Headload cartage of Small material. Rates are per Km/Quintal including loadingand Unloading.(0-1 KM) |
| 28 | Erection of LT ACB 800 A CT with panel |
| 29 | INST. OF DANGER BOARD/NUMBERPLATE |
| 30 | INSTALLATION OF T/F TROLLEY INC.CARTAGE |
| 31 | BACK CARTAGE OF PETTYMATERIAL,0-20 KM |
| 32 | Laying & Fixing LT XLPE Cable |
| 33 | DISMANTELLING OF EXITING FUSE SET |
| 34 | RECONNECTION OF JUMPERS CABLE& EARTHING |
| 35 | DISMENT. OF OLD/ DEFECTIVE LT ACB/MCCB |
| 36 | BACK HEAD LOAD CART. OF PETTYMAT. 0-1KM |
| 37 | PAINTING OF TRANSFORMER |
| 38 | Chemical Earthing:Earthing of distribution transformer including digging of pit of size 2.5 Mtr depth and make hole of size 150 mm. Placing of earthing electrode (to be supplied by contractor as per drawing No. A) as drawing B, connecting the same with G.I.Strip (to be supplied by contractor ) of size 35x6 mm as per drawing C for a minimum lenght 6 m. treatment of soil with highly condctive substance as per IS 30343 complete in all respect, result of earthing resistance to be recroded in M.B. before and after installation of earthing. The earth resistance after earthing should be less than 1 Ohm. |
| 39 | LOOPING AND CHOPPING OF TREEBRANCHES |
| 40 | ERECTION OF NAME PLATES |
| 41 | CLEANING OF T/F TANK, RADIATORETC. |
| 42 | Painting of poles with angle and channel and all steel part by one coat of Rod Oxide Primer and two coats of aluminium Paint and two strip of fluorescent altemate Red and White paint 30 Cm wide upto 1.5 Mtrs. From ground level. |