Tender For Supply, Installation And Commissioning Of Fully Automatic Goniometer
Tender Overview
Project Description
Supply, Installation And Commissioning Of Fully Automatic Goniometer , Supply, Installation And Commissioning Of Fully Automatic Goniometer , Fully Automatic Goniometer ( Parameter 1 To 9 & 11) , 10. Portable Liquid Temperature Control Unit For Use With A Liquid Circulator. Temperature Setting By Liquid Circulator. , 12. Consumables , • Glass Syringe , • 3 Ml Disposable Syringes Set Of 100 Pcs , • Disposable Needle, Stainless Steel, With Pp Luer-Lock Connector, Diameter: 0.5 Mm, Length:38 Mm, Set Of 50 Pieces , • Disposable Needle, Pp, With Pp Luer-Lock Connector, Set Of 25 Pieces , • Disposable Needle, Ptfe, With Pp Luer-Lock Connector, Set Of 50 Pieces , • Manual Syringe: 1 Ml Volume With Continuously Adjustable Precision Syringe , • Quartz:Cuvette: (Optical Grade) , •Calibration Kit For Both Sessile Drop (Contact Angle) And Pendent Drop (Surface Tension). , • One Number Manual Dosing System , 16. Computer , 17. Standard 5 Kva Compact Ups With 1 Hour Power Backup, With Compact Battery Racks And Required Cables From The Main Unit. , 18. Laserjet Printer - A Standard Laserjet Duplex Color Printer , Non-Comprehensive Annual Maintenance Chargesfor1st Year After The Warranty Period Of 3 Years , Non-Comprehensive Annual Maintenance Chargesfor 2Nd Year After The Warranty Period Of 3 Years , Non-Comprehensive Annual Maintenance Chargesfor 3Rd Year After The Warranty Period Of 3 Years , Non-Comprehensive Annual Maintenance Chargesfor 4Th Year After The Warranty Period Of 3 Years , Non-Comprehensive Annual Maintenance Chargesfor 5Th Year After The Warranty Period Of 3 Years
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 13-Oct-2025 | Supply, installation and commissioning of Fully Automatic Goniometer | Date | 29-Oct-2025 |
| 2 | 06-Oct-2025 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 13-Oct-2025 |
BOQ
| Sl. No. | Item Description |
| 1 | Supply, installation and commissioning of Fully Automatic Goniometer |
| 2 | Fully Automatic Goniometer ( Parameter 1 to 9 & 11) |
| 3 | 10. Portable Liquid temperature control unit for use with a liquid circulator. Temperature setting by liquid circulator. |
| 4 | 12. Consumables |
| 5 | • Glass syringe |
| 6 | • 3 ml Disposable syringes set of 100 pcs |
| 7 | • Disposable Needle, Stainless Steel, with PP Luer-Lock Connector, diameter: 0.5 mm, length:38 mm, set of 50 pieces |
| 8 | • Disposable Needle, PP, with PP Luer-Lock Connector, set of 25 pieces |
| 9 | • Disposable Needle, PTFE, with PP Luer-Lock Connector, set of 50 pieces |
| 10 | • Manual syringe: 1 ml volume with continuously adjustable precision syringe |
| 11 | • Quartz:Cuvette: (optical grade) |
| 12 | •Calibration kit for both Sessile Drop (Contact angle) and Pendent drop (Surface Tension). |
| 13 | • One number manual dosing system |
| 14 | 16. Computer |
| 15 | 17. Standard 5 KVA compact UPS with 1 hour power backup, with compact battery racks and required cables from the main unit. |
| 16 | 18. LaserJet Printer - A standard LaserJet duplex color printer |
| 17 | Non-Comprehensive Annual Maintenance chargesfor1st year after the warranty period of 3 years |
| 18 | Non-Comprehensive Annual Maintenance chargesfor 2nd year after the warranty period of 3 years |
| 19 | Non-Comprehensive Annual Maintenance chargesfor 3rd year after the warranty period of 3 years |
| 20 | Non-Comprehensive Annual Maintenance chargesfor 4th year after the warranty period of 3 years |
| 21 | Non-Comprehensive Annual Maintenance chargesfor 5th year after the warranty period of 3 years |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed