| 1 | Conducting Geo-Physical survey including conveyance the instrument etc., complete |
| 2 | Drilling of150mm dia vertical bore well upto the recommended depth etc., complete |
| 3 | Supply and inserting of6 Ksc PVC casing pipe etc., complete |
| 4 | Earthwork excavation and depositing on bank with initial lead of 10m and lift of 2.00m in Hard stiff clay.Stiff Black Cotton soil. Hard red earth, Shales, Murrams and earth mixed with small size boulders etc. as per SS 20 B |
| 5 | Plain Cement Concrete 1:4:8 (one cement four sand and eight aggregate) using 40mm HBS for foundation including the cost of mixing concrete, ramming, curing etc. complete and as directed by Officers etc., complete |
| 6 | Brick Work in CM 1:5 (one Cement five sand) using country bricks of size 8 ¾ x4 ½ x2 including curing etc. complete and as directed by departmental officers etc., complete |
| 7 | Plastering with CM 1:5 (one cement and five sand) 12mm thick over brick work including finishing curing etc. and as directed by departmental officers etc., complete |
| 8 | Supply and delivery and fixing of HDPE tank including loading and unloading, transportation fixing and necessary GI Pipe and specials for pipe connection works including cutting, threading and fixing charges as directed by depart-mental officers etc., complete |
| 9 | Painting two coats with approved cement paint over one coat of priming over the cement plastered exposed surface etc. complete and as directed by the departmental officers. |
| 10 | Supply and delivery of MS Kiosk of size 0.75 x 0.45 x 0.75 for fixing of meter board, switch board with MS door and lock and key arrangements |
| 11 | Supply and delivery of Three-phase pump set with motor as per ISI 50 lpm x 40 head with out panel board consist of following.Submersible Pump(WD-M1614) |
| 12 | Supply and delivery of Three-phase panel board with 2 level guard and auto start (2 HP Panel Board) |
| 13 | Supply and delivery of32mm UPVC - Column pipe including all labour charges |
| 14 | Supply and delivery of PVC Insulated and Sheathed 3 core flat type 4 sq.mm copper cable conforming to IS 694/1990 |
| 15 | Supply and delivery ofGI & PVC specials confirming to ISI Specifications32mm GI clamp set |
| 16 | 25mm PVC Pipe |
| 17 | 25mm PVC Coupling |
| 18 | 25mm PVC Elbow |
| 19 | 150 mm bore cover |
| 20 | 32 mm GI flangh set |
| 21 | 32mm GI Bend |
| 22 | 32mm GI NRV |
| 23 | 25mm GI service pipe |
| 24 | 25mm GI service pipe Bend |
| 25 | 7/20 copper wire for service connection |
| 26 | 16 amps main switch |
| 27 | 20mm CI Tap |
| 28 | 20mm GI Pipe nipple |
| 29 | 20mm GIcoupling |
| 30 | Nylon rope for Bore wWell |
| 31 | Earthwork excavation above water level in light or sandy soil for infiltration gallery, syphon or connecting pipeline and connected works including refilling complete. |
| 32 | Laying and Joining of Supplied 90mm PVC pipes |
| 33 | REFILLING of PVC PIPES |
| 34 | Labour charges for erection of pump set in the deep bore well including connection of submersible cable etc. |
| 35 | Labour charges for tap connection and inter connection etc., including cutting of GI pipes fixing of specials etc., complete |
| 36 | Internal wiring with copper insulated wire through conduct pipes, with necessary switches, distribution boxes with bulkhead fittings and bulbs. |
| 37 | Internal wiring with copper insulated wire through conduct pipes, with necessary switches, distribution boxes with bulkhead fittings and bulbs. |
| 38 | E B Service charges etc., completed |