Providing Paver Block Road At Sapputhaikkal Street And Construction Of Strom Water Drainage At Poonga Nagar In Thittachery Town Panchayat , Ordinary Soil Ss20a Earth Work Excavating And Depositing On Bank With Initial Lead Of 10M And Initial Lift Of 2 M In M-Sand, Silt Or Other Loose Soil, Wet Sand Or Silt Not Under, Light Black Cotton Soil Sandy Loam And Ordinary Soil Including Excavated Earth Ss.20.A Morth No.301 , Cement Concrete Of Mix 1:4:8 (One Cement Four And Eight Aggregates) Using 40Mm Gauge Hard Broken Including Cost Conveyance Of All Materials To Site Including Labour Charges, Transporting And Placing In Position Including Shoring, Strutting Forming Protective Bunds, Cofferdams Bailing Out Of Water Labour For Mixing Compacting, Finishing And Curing, Working At Depths, Tools And Plants And Incidental Charges Such As Sheeting, Shoring And Bracing And Their Subsequent Removal Etc., Complete As Per Standard Specification. , Supplying & Erecting Centering For Sides & Soffiots Including Necessary Supports & Strutting Upto 3.29M Height For Plane Surfaces In All Floors With All Cross Bracings Using Mild Steel Sheets Of Size 90 X 60Cm & 10 Gauge Stiffened, Welded With Steel Angle Of Size 25 X 25 X 3Mm For Boarding Laid Over Silver Oak Joists(Country Wood) Of Size 10 X 6.5Cm Spaced @ About 90Cm C/C And Supported By Casurina Props Of 10 - 13Cm Dia. Spaced @ 75Cm C/C Etc., Complete Complying With Standard Specifications And As Directed By The Departmental Officers. Rate For 10M2.For The Following Items.(Rcc Floor Slab, Roof Slab, Rectangular/ Square, Tee/ Ell Beams, Lintels, Staircase Waist Slabs, Landing Slabs, Landing Beam, Portico Beam Etc., ). , Grade Beam , Supplyingandfabrication Of Steel And Placing In Position Ms / Ribbed Tor Steel Grills For Rcc Works As Per Design Given Including Cost Of Steel And Gi Binding Wire In Floors Etc,. Complete Complying With Standard Specification In Force And As Directed By Department Officials.- , Providing And Laying In Position Standardised Concrete Mix M-20 Grade In Accordance With Is 456 - 2000 Using 20Mm And Down Graded Hard Broken Granite Stone Jelly For All Rcc Items Of Works With Minimum Cement Contenet Of 325Kg/ Cum And Maximum Water Cement Ratio Of 0.55 Including Admixture (Plasticiser / Super Plasticiser) In Recommended Proportions As Per Is 9103 To Accelerate, Related Setting Of Concrete, Improve Workability Without Imparing Strength And Durability With About (5.0Cum), 7730Kg Of 20Mm Machine Crushed Stone Jelly And With About (3.3 Cum), 5156Kg Of 10 - 12Mm Machine Crushed Stone Jelly And With About (4.79Cum) 7670 Kg Of Sand, But Excluding Cost Of Reinforcement Grill And Fabricating Charges Centering And Shuttering But Including Laying, Vibrating With Mechanical Vibrators, Finishing, Curing, Etc And Providing Fixtures Like Fan Clamps In The Rcc Floor / Roof Slabs Wherever Necessary Without Claiming Extra Cost Etc., Complete Complying With Standard Specification And As Directed By The Departmental Officers - The Coarse And Fine Aggregates To Be Used Should Comply With The Requiremnents Of Is Standards. (No Separate Payment Will Be Made By The Department For The Excess Usage Of Materials) - , Plain Cement Concrete 1:2:4 (One Cement, Two Crushed Stone Sand (M- Sand) And Four Coarse Aggregates) Using 20Mm Size Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And Including For The Mixing, Laying And Labour Chargesetc., Complete As Per Standard Specification , Providing Granolithic Floor Finish Of The Following Thickness With Plain Cement Concrete 1:2:4 (One Cement, Two M.Sand And Four Aggregate) Using 10 To 12Mm Gauge Hard Broken Stone Jelly Including Laying, Finishing And The Top Rubbed Smooth With Power Trawl, Thread Lining, Curing Etc. Complete Complying With Standard Specification And As Directed By The Departmental Officers. (The Rate Is Inclusive Of Necessary Planking For Panellingwherever Necessary And As Directed By The Departmental Officers) 40Mm Thick , Providing And Laying, Spreading And Compacting Graded Stone Aggregates To Wet Mix Macadam To A Required Thick Specification Including Premixing The Materials With Water At Omc In Mechnanical Mix Plant Carriage Of Mixed Material By Tipper To Site Laying In Uniform Layers With Pavers In Sub Base/Base Course On Well Prepared Surface And Compacting With Vibratory Roller To Acheive The Desired Density Including Cost Of Material, Labour Charges, Rentals For Machinery, Fuel And All Other Incidental Charges Etc., Complete As Per Clause 406 Of Morth Rev-5 , Supplying And Laying Of Interlocking Paver Block Stone 63Mm Thickover A Base Layer Ofstone Dust Filling Incl. Cost Of Materialslaying And Labour Charges Etc Complete Complying With The Standardspecification And As Directed By The Departmental Officers , Manufacturing, Supplying And Fixing Precast Reinforced Cement Concrete Slabs Of Following Thickness In Rcc 1:11/2:3 (One Cement, One And Half Sand And Three Aggregates), Using Following Hbgs Jelly Including Cost Of Reinforcement Steel In Position But Including Cost Of Moulding Charges, Casting Of Slab, Finishing, Curing And Fixing In Position In All Floors Etc., Complete Complying With Standard Specification And As Directed.