| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m,All kinds of soil 50% Ordinary rock@30% and Hard roak@20%as directed by Engineer-in-Charge. |
| 2 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth levelwith:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 4 | Providing and laying in position specified grade of cement concrete including curing but excluding the cost of centering, shuttering, finishing . All works upto plinth levelwith1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc upto floor V level, including curing but excluding the cost of centring, shutteringand finishing with.1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)With 20% plumb |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level(1:1.5:3) |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo-Mechanically Treated bars of grade Fe-500D or more |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for: retaining walls , return walls etc, |
| 10 | Edges of slabs and breaks in floors and walls Under 20 cm wide |
| 11 | Dumping stone excluding cost of stones. in Horizontal on level |
| 12 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete.Non-pressure NP-3 class (Medium duty) R.C.C. pipes5 1200 mm dia. R.C.C. pipe (laying by manual/mechanical means) |
| 13 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge: 1:3:6 or richer mix (i/c equivalent design mix) |
| 14 | A) CARRIAGES SAND (35KM) |
| 15 | B) STONE AGGERGATE BELOW 40MM(10KM) |
| 16 | C) Stone Aggergate (10KM) Above 40mm |
| 17 | Stone (5KM) |