Development Of Play Field At Barsoo Pulwama- 1 FENCINGEarth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in all kinds of soil complete 2 Providing and laying of soling stone size on level (hand packed ) of size not more than 100mm incl.Consolidation with Power Road Roller 8-10 Tonne Capacity Complete and all types of carriages complete 3 P/L in position cement concrete in foundation and plinth excluding the cost of centring and shuttering all work upto plinth level (1;4;8) stone aggregate 40 mm nominal size crushed aggregate . 4 P/L in position cement concrete in foundation and plinth excluding the cost of centring and shuttering all work upto plinth level (1;2;4) stone aggregate 40 mm nominal size crushed aggregate . 5 Centring and shuttering incl strutting propping etc and removal of form work for foundation footing bases of columns Foundation and footing bases of column a) R R Wal 6 Provide and Laying 60mm th factory made cement concrete interlock paver block of M30 grade made by block making machine with strong vibratory compaction of approved size ,design and shape laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand ,filling the joints with fine sand etc all complete as per the direction of engineer in charge. 7 Provide and fixing G.I chain link fencing 50mmx50mm mesh including strengthening with 2 mm dia wire or nuts,bolts and washers as required complete as per the direction of Engineer-charge 8 Provide /fixing of structural steel angle flat of approved design cutting,hoisting,straightening,welding incl primer coat and two coats of paint of approved brand incl all carriage lead and lift incl primer and two coats painting complete 9 painting with Synthetic enamel paint of approved brand and manufacture to given an even shade two or more coats incl a coat of steel primer 10 Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth,leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge.All kinds of soil 11 Provide and laying hand packed nallah stone in crate wire incltipping of stones in crates,making knitting wire crate incl cost of nallah stone and crate wire complete job 12 carriage of material from source to site sand /aggregate For av lead 10km 13 DRAIN Earth wk excavation in foundation trenchesdrains by manual means ( not exceeding 1.5m in width as well as 10sqm on plan incl dressing of sides and ramming of bottom lift upto 1.5m incl getting out the excavated soil and disposal of surplus excavated soil 1 m from cutting edge 14 Provide and laying nallah stone soiling hand packed in trenches including watering and ramming and carriage upto site of wk 15 Providingand Laying in postion cement concreteofspecified gradeexcludigncost ofcentering,Shutteringin 1:4:8 with 40mm n/s aggregate incl all carriage lead and lift 16 Providingand Laying in postion cement concreteofspecified gradeexcludigncost ofcentering,Shutteringin 1:2:4 with 20mm n/s aggregate incl all carriage lead and lift 17 Providing and laying specified grade of Reinforced cement concrete in 1:1.5:3 with 20mm n/s aggregate excl cost of centering and shuttering ,reinforcement in beams slab etc 18 Reinfcement f R.C.C. wk including straightening, cutting, bending, placing in position and binding all complete (Thermo-mechanically treated bars) including all carriages / head load upto site of wk complete. 19 Centering and shuttering incl strutting,propping etc and removal of form work from plinth beams ,slabs etc 20 50mm thick Cement concrete floing 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 21 12 mm cement plaster l of mix 1:4 ( 1 cement : 4 coarse sand) including all carriages / head load upto site of work complete. 22 making drain holes in RCC by providing and embede 40mm dia and 75mm long app pieces of ordinary PVC pipe in RCC slab during casting of Drain Slab 23 carriage of material from source to site sand /aggregatebfor av lead 10km 24 Supply of dugout structure fabricated from MS tube having minimum dimension of 50 x 50mm Square Tube detachable framework with powder coated matt finish. The height of the dugout will be 2.05 meter at front side, Curved surface roof and 4.9 mtr length The seating capacity will be of 10 players. The structure will be covered with 3mm thick transparent or colored polycarbonate sheet on top and two sides.Wheel Assembly – Solid tyre 10” wheel attached to dugout for easy movement withoutany damage to the sports field.The Structure is Provide with HDPE Blow Molded Seat:Double-wall hollow blow mold bucket type seat having minimum dimensions as 465 mm side length x 440 mm front width x 390 mm rear height in one piece of HDPE having minimum shell thickness of 2 mm on each wall. Minimum seat density of 0.95 gram/cm3, weight of plastic chair should not be less than 1.9-2.1 kg. Chair should withstand in high temperature not less than 50°C with ultraviolet stabilizer and color fastness, having ergonomic design, the chair should be fixed with Metal Inserts moulded inside seat to connect seat with sheet metal bracket which is mounted on 40x2mmS Square tube.Chair has a warranty of 2years against significant color fading and 5 Years against breakage due to manufacturing .chair plastic part tested with xenon-Arceposure Test as per ISO 48892-2:2013. Cycle-1.TheseatpassBSEN12520: 2015 TEST 25 SYNTHETIC FOOTBALLPreparation of subgrade by excavating earth to an average of 22.5 cm depth, dressing to camber and consolidation with road roller of 8-12 tonne capacity including making good the undulation etc. and disposal of surplus earth upto 50 meters. with earth or quarry spoils etc. and rerolling the subgrade. 26 Supply and Laying of GSB/Crushed stone aggregate (63-90mm) at site of required size incl consolidation with 8-10 ton vibrator power road roller incl all carriage complete job 27 P/L of 110mm Dia perforated PVC pipes of type B in trenches of min load bearing of min 6kg per cm sq and perforations @.15m c/c in 50% area of pipe.whole pipe to be covered with geotextile sheet of 200 micron and laid perpendicular to the length of field @5m c/c with openable junction at centre or maintenance purpose .incl filling of 20-40mm size aggregate bed and wrapping of geo textile arround pipe with all fitting for the pipe.Testing of pipes for water flow to be be carried out before covering with aggregate 28 Supply and installation of Virgin Geotextile (150-200 micron) to cover entire field before laying of aggregate Base coarse 29 P/L and compacting stone aggregate of different sizes to form contour and elevation to desired level as per the drawing and instruction of Engineer in charge (size 40mm/20mm/10mm)down black stone aggregate upto a depth of 300mm from below primary backing incl all carriage .Laying of stone to be rolled as per desired slope and compaction using 8-10 road roller over open area and pitch roller over areas with drainage pipes.A(40MM) 30 20 MM SIZE 31 10 MM SIZE 32 DUST 33 Supply and Installation of Synthetic Artificial Turf for Football field from FIFA preferred producer having polythylene monofilament diamond shaped yarn,Pile height 60-65mm,triple layered PU backing,stich rate of 150-160 stiches per linear metre ,UV Resistant Silt Film Yarn structure,Dtex not less than 14000,Tape thickness not less than 130 microns,pile weight not less than 1500 gms/sqm ,total carpet weight not less than 1900 gms/sqm,infill weight not less than 38 kgs/sqm,(silica sand of 80/100 grade and SBR rubber granules of size 2-4mm),total product weight not less than 40000 gms/sqm .100mm wide line marking should be pre tufted and made of coloured turf of same quality.cost includes unloading and staged of rolls,sewing of seams with imported turf adhesive,infilling with appropriate dispensing machine,spreading and leveling equipment,brushing of fibres with hydralic controlled equipment and annual field maintenance of 3 years (regular turf Brushing by mechanical brushing machine,joints/seam rectification included in annual Maintenance for 3 years