|
| 1 | Safe cartage of PCC(8.5 Mtr/9 mtr)pole With related Instalation centralised Material from central store to JE Store/ Work Site (Including Loading, Unloading in all Respect) |
| 2 | Safly Carage of Weasel Conducterfrom central store to JE Store/ Work Site (Including Loading, Unloading in all Respect) |
| 3 | Safly Cartage of 33KV &11 KV (O/G, I/C VCB) from Centeral Store to33/11 KV Sub Station including loading and unloading to both ends in all respect with the help of heavy duty crane. |
| 4 | Safly Cartage of 3x185Sq Mm XLPE Cable With related Instalation centralised Material from central store to JE Store/ Work Site (Including Loading, Unloading in all Respect) |
| 5 | Safly Cartage of 3x300q Mm XLPE CableWith related Instalation centralised Material from central store to JE Store/ Work Site (Including Loading, Unloading in all Respect) |
| 6 | Safly Cartage of 33KV Isolater With related Instalation centralised Material from central store to JE Store/ Work Site (Including Loading, Unloading in all Respect) |
| 7 | Safly Cartage of 11 KV Bus Cupler With related Instalation centralised Material from central store to JE Store/ Work Site (Including Loading, Unloading in all Respect) |
| 8 | Safly Cartage of panther ConductorWith related Instalation centralised Material from central store to JE Store/ Work Site (Including Loading, Unloading in all Respect) |
| 9 | Digging a pit and instaled PCC Pole in it with Instalation all Line Items and Grouting of Pole Properly and energized line.(Decentralized Item As Nut Bolt, Clamp, Stone pad and Material for grouting will be provide by Contractor) |
| 10 | Dismentling of old VCB from the control room/Switch Yard including opening of all H.T. cable/ bus-bar form VCB and carriage VCB out Side Control Room/Switch Yard |
| 11 | Shifting of New VCB from out side to inside the control room/Switch Yard with the help of heavy duty crene and its instalation with grouting with anchor bolts. |
| 12 | Making the bus-bar connection of VCB and making connection of H.T. Cable with VCB and proper insulation of bus-bar and making the connection of33KV & 11KV VCB etc, completely in all respect. |
| 13 | Received Back old33KV & 11 VCB from Site to Store (Including Loading, Unloading, Cartage in all respect) |
| 14 | In the Place of Damaged WTI/OTI Providing And Fixing New WTI/OTI (Decentralised Item Provided By Cont.) |
| 15 | Providing and Fixing 33 KV Relay DamagedRelay Replacement Work (Decentralised Item Provided By Cont.) |
| 16 | Providing and Fixing11 KV Relay DamagedRelay Replacement Work (Decentralised Item Provided By Cont.) |
| 17 | Disment of old Dog Conducter From Switch Yard |
| 18 | Istalation of New Panther Conducter as Reshpo Norm |
| 19 | Providing and FixingWater Level Earthing (Decentralised Item Provided By Cont.) |
| 20 | Providing and FixingChemical Earthing (Decentralised Item Provided By Cont.) |
| 21 | Diging the Tranch and Place XLPE cable As Respo Norms(Decentralised Item Provided By Cont.) |
| 22 | Instalation of O/D Jointing Kit as Reshpo Norm. |
| 23 | Instalation of I/D Jointing Kit as Reshpo Norm. |
| 24 | Make Conection of XLPE cable As Respo Norms |
| 25 | Istalation of Bus Coupler as Reshpo Norms in S/S Control Room |
| 26 | Open Old Isolater andInstalation of New Isolater As Respo Norms |
| 27 | Received back of Old Isolater to Store |
| 28 | Receved back of Old Dog Conducter |
| 29 | Work for Earthing of Pole With MS Earthing |
| 30 | Work for Instalation of Stay Set |
| 31 | Material Received Back to Store |
| 32 | ston Pad |
| 33 | Clamp With nut and Bolt |
| 34 | Nut & Bolt |
| 35 | Alum. Binding Wire |
| 36 | LT Shackel Insulater 100x115 mm(Centralize or Decentralized) |
| 37 | Number Plate With clamp, Nut Bolt |
| 38 | Danger Board |