| 1 | Safe cartage of PCC(8.5 Mtr/9 mtr)pole With related Instalation centralised Material from central store to JE Store/ Work Site (Including Loading, Unloading in all Respect) |
| 2 | Safly Cartage of 33KV & 11 KV (O/G, I/C VCB) from Centeral Store to33/11 KV Sub Station including loading and unloading to both ends in all respect with the help of heavy duty crane. |
| 3 | Safly Carage of ABC(3x120+1x95+1x16)/ (3x95+1x70+1x16) Conducterfrom central store to JE Store/ Work Site (Including Loading, Unloading in all Respect) |
| 4 | Dismentling of old VCB from the control room/Switch Yard including opening of all H.T. cable/ bus-bar form VCB and carriage VCB out Side Control Room/Switch Yard |
| 5 | Digging a pit and instaled PCC Pole in it with Instalation all Line Items and Grouting of Pole Properly and energized line.(Decentralized Item As Nut Bolt, Clamp, Stone pad and Material for grouting will be provide by Contractor) |
| 6 | Shifting of New VCB from out side to inside the control room/Switch Yard with the help of heavy duty crene and its instalation with grouting with anchor bolts. |
| 7 | Safly Cartage of XLPE Cable (3x185) from Centeral Store to33/11 KV Sub Station including loading and unloading to both ends in all respect with the help of heavy duty crane. |
| 8 | Instalation of LT Distribution Box |
| 9 | Digging Tranch and pulout old cable and placed new XLPE cable In tha Tranchin all respect Acording Respo Norms |
| 10 | Work of Spread ABC, mounting and tying the wire on the pole with installation of all necessary line Item properly as Reshpo Norms |
| 11 | Safly Cartage of Jointing Kitt(I/D & O/D) form centeral store to 33/11 kv S/S andInstalation work inXLPE cable, connected properly with RESPO norms in all respect. |
| 12 | Work for Earthing of Pole With MS Earthing |
| 13 | Work for Instalation of Stay Set |
| 14 | Making the bus-bar connection of VCB and making connection of H.T. Cable with VCB and proper insulation of bus-bar and making the connection of33KV & 11KV VCB etc, completely in all respect. |
| 15 | Received Back old33KV & 11 VCB from Site to Store (Including Loading, Unloading, Cartage in all respect) |
| 16 | Material Provided By Contrector |
| 17 | ston Pad |
| 18 | Clamp With nut and Bolt |
| 19 | Suspance Clamp with I Hook |
| 20 | Dead End Clamp with I Hook |
| 21 | LT Piercing Connecter 95 Sq.MM |