| 1 | Safly Cartage of PCC Pole of 8.5 Mtr. With related centralised Material from central store to JE Store/ Work Site (Including Loading, Unloading in all Respect) |
| 2 | Safe cartage of250 KVA Transformer With related Instalation centralised Material from central store to JE Store/ Work Site (Including Loading, Unloading in all Respect) |
| 3 | Safly Carage of ABC(3x95+1x70+1x16)/ (3x50+1x35+1x16) Conducterfrom central store to JE Store/ Work Site (Including Loading, Unloading in all Respect) |
| 4 | Construction of Plinth in all respect According RESPO Norms of size 2x2x1.5 m (All required Decentralized material will be Provided by contractor for Construction of Plinth) |
| 5 | Installation of 250 KVAT/F on Plinth in all respect and energize after complete all work as RESPO Norms.(All required Decentralized material will be Provided by contractor) |
| 6 | According RESPO Norms laying LT AB Cable, mounting on Pole and Tying work Properly.(All required Decentralized material will be Provided by contractor) |
| 7 | Digging and Erection pole to make Dp with grauting, earthing and Complete work as per RESPO Norms Including all of accessories(Decentralized Item As Clamp,Nut bolt etc will be provide by Contractor) |
| 8 | Digging and Erection pole with grauting, earthing and Complete work as per RESPO Norms Including all of accessories (Decentralized Item AsClamp,Nut bolt etc will be provide by Contractor) |
| 9 | Installation of 3 Phase Distribution Box (Decentralized Item will be provide by Contractor) |
| 10 | Chemical Earthing work as per requirment of Site & RESPO Norms Including all of accessories (All required Decentralized material will be Provided by contractor for Earthing) |
| 11 | According RESPO Norms Instalation Stay Set |
| 12 | According RESPO Norms Installation of danger board and barbed wire on pole(All required Decentralized material will be Provided by contractor) |
| 13 | According RESPO Norms Instalation 11 KV Fuse Setwith carage from store (All required Decentralized material will be Provided by contractor for Fuse Set) |
| 14 | According RESPO Norms Wire Mesh Fencing of Distributan T/F (All required Decentralized material will be Provided by contractor for Fancing) |
| 15 | According RESPO Norms for Safty of 250KVA T/F Instalation of 01 No. Tell Less Unit with Structure In LT Side of T/F.(All required Decentralized material will be Provided by contractor for Tell Less Unit) |
| 16 | Received Back old and used 100 KVA T/F from Site to Store (Including Loading, Unloading, Cartage and Dismantle in all respect) |
| 17 | According RESPO Norms Earthing of Pole by MS earthing |
| 18 | Material Provided By Contrector |
| 19 | ston Pad |
| 20 | Clamp With nut and Bolt |
| 21 | Suspance Clamp with I Hook |
| 22 | Dead End Clamp with I Hook |
| 23 | LT Piercing Connecter 95 Sq.MM |
| 24 | E bracket for 11 KV |
| 25 | Barbard Wire |
| 26 | Nut Bolt with washer of all size |