|
| 1 | Cutting holes exc 150 Sqcm & not exc 400 sqcm superfacial area intothrough reinforced cement concrete slabs, chajjas, wall, column, beam etc. orthrough brick walls built in cement mortar and making good in cement mortar 1:3 or cement concrete 1:2:4 type B-l as required complete all as specified and directed.Note :- Work to be carried out in multy storey bldgs upto 10 storey and necessary steel scafolding shall be included in the rate. |
| 2 | Demolition of brick work or stone boulder masonary/ jaffri wall built in cement mortar including all quoins arches pillars etc. including ashlar facing dressed stone work and precast concrete articles complete all as specified and directed.Note :- Work to be carried out in multy storey bldgs upto 10 storey and necessary steel scafolding shall be included in the rate. |
| 3 | Dismantling cast iron or mild steel work of any description not otherwise provided for complete all as specified and directed.Note :- Work to be carried out in multy storey bldgs upto 10 storey and necessary steel scafolding shall be included in the rate. |
| 4 | Supply, fabrication and fixing of framed work such as grills, gratings,angles etc. with ends of bars shouldered and/or riveted, or forged into spikes; framed guard bars; barred iron doors; ladders; framed balusters; walk ways; railings; framework of water tanks or landing platform and similar work conforming to Fe.290.Gde-E-165. Thickness of metal to be welded exc 6mm but not exc 10mm and length of welding not less than 5cm complete all as specified and directed.(MS ladder and framed work to be fixed in high rise buildings upto 10 storey) Note :- Necessary steel scafolding shall be included in the rate. |
| 5 | S&F iron pintle hinges for MS foldable platform of size 100MM heavy duty complete all as specified and directed.Note :- Work to be carried out in multy storey bldgs upto 10 storey and necessary steel scafolding shall be included in the rate. |
| 6 | S&F Hold fastner stay of dia 16mm and 150mm long steel or iron bar to be fixed in RCC Column/Beams complete all as specified and directed.Note :- Work to be carried out in multy storey bldgs upto 10 storey and necessary steel scafolding shall be included in the rate. |
| 7 | M&L for Preparation of new steel and iron surfaces exceeding 10cms width or girth and applying two coats of synthetic enamel paint over one coat of red oxide zink chrome primer complete all as specified as directed.Note :- Work to be carried out in multy storey bldgs upto 10 storey and necessary steel scafolding shall be included in the rate. |
| 8 | M&L Rendering 10mm thick on fair faces of brick work or concrete surfaces in CM (1:4) mixed with WPC finished the surfaces even and smooth without using extra cement complete all as specified and directed.Note :- Work to be carried out in multy storey bldgs upto 10 storey and necessary steel scafolding shall be included in the rate. |
| 9 | M&L for preparation of newly plastered surface of wall and applying Two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm over new surfaces complete all as specified and directed.Note :- Work to be carried out in multy storey bldgs upto 10 storey and necessary steel scafolding shall be included in the rate. |
| 10 | M&L for preparation of old plastered surface of wall and applying one or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm complete all as specified and directed.Note :- Work to be carried out in multy storey bldgs upto 10 storey and necessary steel scafolding shall be included in the rate. |
| 11 | M & L for Cement concrete in foundations, filling and mass concrete, Type B-2, 1:2:4 (40mm graded aggregate) complete all as specified and directed. |
| 12 | S&F and fabrication steel rolled sections as in main and cross beams, hip and jack rafters; purlins where connected to common rafters androof trusses (framed), trussed, purlins, crane gantries, rails andfastenings and heavy bracket framing (Beam, tee, angle, channelor flat sections) including distance pieces, cleats etc. complete all as specified and directed.Note :- Work to be carried out in multy storey bldgs upto 10 storey and necessary steel scafolding shall be included in the rate. |
| 13 | S&F Pre- painted galvalume aluminum zinc coating GI based corrugated steel sheet 0.50mm thick of an colour having tensile strength of 550 Mpa as in roof covering/cladding to wall, fixed with self tapping screws complete all as specified and directed.Note :- Work to be carried out in multy storey bldgs upto 10 storey and necessary steel scafolding shall be included in the rate. |
| 14 | Removing/cleaning vegitation/weed and small plants from external wall surface of high rise buildings and making good the broken surface withCM 1:4 complete all as specified and directed.Note :- Necessary steel scafolding shall be included in the rate. |