| 1 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalledor unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 0 to 1.5 mtr. |
| 2 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalledor unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 1.5 to 2.25mtr. |
| 3 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. |
| 4 | Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods Item No.6.2(a) of CSR 2020 |
| 5 | Earth work undressed with combined lead upto 15mtr. including breaking of clods Item No.6.2(b) of CSR 2020 |
| 6 | Dressing of new earth work Item No.6.3(i) of CSR 2020 |
| 7 | Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed. |
| 8 | Re-handling of earthwork recently executed item No.6.2(a) of CSR 2020 note No.ii |
| 9 | Dag belling single kassi stroke minimum 7.5 cm depth item No.6.18(a) |
| 10 | Dressing of bed and preparation of sub-grade for lining.Item No.19.1 of CSR 2020 |
| 11 | First class burnt brick laid in cement sand mortar 1:6 for bed and side wall [Item No 11.3(i)]. |
| 12 | 10mm thick cement plaster 1.4 on sides walls (-) Rs.1.25/- for scaffolding. |
| 13 | 10mm thick cement plaster 1:4 on bed and top. |
| 14 | Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement (CSRItem No 10.13 (a) (i) |
| 15 | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle |
| 16 | Cement concrete 1:4:8 with brick ballast 40mm gauge |
| 17 | Fixing of frame ( Non scheduled item) |
| 18 | Supplying & Laying Dry Brick Bats.item No.10.29 |
| 19 | Lowering, jointing and cutting of RCC pipes 250 mm dia into trenches& laying same to correct alignment complete |
| 20 | Lowering, jointing and cutting of RCC pipes 300 mm dia into trenches& laying same to correct alignment complete |
| 21 | Lowering, jointing and cutting of RCC pipes 350 mm dia into trenches& laying same to correct alignment complete |
| 22 | Lowering, jointing and cutting of RCC pipes 400 mm dia into trenches& laying same to correct alignment complete |
| 23 | Lowering, jointing and cutting of RCC pipes 450 mm dia into trenches& laying same to correct alignment complete |
| 24 | Lowering, jointing and cutting of RCC pipes 500 mm dia into trenches& laying same to correct alignment complete |
| 25 | Lowering, jointing and cutting of RCC pipes 600 mm dia into trenches& laying same to correct alignment complete |
| 26 | Lowering, jointing and cutting of RCC pipes 700 mm dia into trenches& laying same to correct alignment complete |
| 27 | Lowering, jointing and cutting of RCC pipes 800 mm dia into trenches& laying same to correct alignment complete |
| 28 | Lowering, jointing and cutting of RCC pipes 150 mm dia for vent pipe into Trenches and laying same to correct alignment ( @2.50 metre / No) |
| 29 | Wrought Iron and mild steel ladders, framed grills, grating etc. complete fixed in position in D-tank.(CSR 2020 Item No.18.4) |
| 30 | Providing & fixing M.S. foot rests made of 23x25 mm square bar including fixing in Haudis complete with cement concrete 1:2:4 (CSR 2020 Item No.29.35 ) |
| 31 | Providing and fixing of Alfa Alfa Valve fitted on riser pipe to act as Nakka (D regulators) DIA-250 mm |
| 32 | Providing and fixing of Alfa Alfa Valve fitted on riser pipe to act as Nakka (D regulators) DIA-300 mm |
| 33 | Providing and fixing of Alfa Alfa Valve fitted on riser pipe to act as Nakka (D regulators) DIA-350 mm |
| 34 | Providing and fixing of Alfa Alfa Valve fitted on riser pipe to act as Nakka (D regulators) DIA-400 mm |
| 35 | Providing and fixing of Alfa Alfa Valve fitted on riser pipe to act as Nakka (D regulators) DIA-450 mm |
| 36 | Providing and fixing of Alfa Alfa Valve fitted on riser pipe to act as Nakka (D regulators) DIA-500 mm |
| 37 | Providing and fixing of Alfa Alfa Valve fitted on riser pipe to act as Nakka (D regulators) DIA-600 mm |
| 38 | Providing and fixing of Alfa Alfa Valve fitted on riser pipe to act as Nakka (D regulators) DIA-700 mm |
| 39 | Providing and fixing of Alfa Alfa Valve fitted on riser pipe to act as Nakka (D regulators) DIA-800 mm |
| 40 | Centreing & shuttering for Concerte faces |
| 41 | Providing and fixing of Steel Shutter Gates Assembly in Main Pipeline complete in all respects. |
| 42 | Dismantling of Brick work in Cement, CSR 2020 - item no- 8.5 (b) |