|
| 1 | Scraping old painted surface including disposal of all scraped material to a distance of 30 meters (100 ft.) as directed by Enginer-in-charge. |
| 2 | Providing, laying, spreading and compacting stone aggregates of specific sizes 22.4 to 53 mm water bound macadam specification including spreading in uniform thickness, hand packing, rolling with threewheel 80-100 kN static roller in stages to proper grade and camber,applying and brooming , stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading-3 as perTechnical specification Clause-405. |
| 3 | Cement concrete with 2 cm gauge approved stone grit, coarse sand & cement in proportion of 1:1.5:3 in cc pavement (thickness as per design) cement coarse & fine aggregate confirming to IS standard mixed in concrete mixture/Plant of not less then 0.2 cum capacity & appropriate weight batcher using approved mix design, laid in approved fixed form work (steel) channel) laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the form work spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including hassion cloth for curring of concrete pavements for not less then 14 days curring compound (where as specified) and water finishing to lines & grade including supply of all material, labour, tools & plants etc. required for proper completion of work and also including complete shifting of Recron 38 fibre reinforcement material etcl & concrete etc. Asper S.I. No. 10.3 New Item 9 |
| 4 | Dismantling of old brick laid on C.C. Interlocking tiles including stacking of old Tiles. As per S.I. No.10.3 New Item IV |
| 5 | Earth work in Filling ..........20 cm. layers including remmingand dressing the surface to required levels and slopes and also including 10.00 Km cartage as directed by the Engineerincharge.(Royality removed by Govt.) for small works/Abadi area.(where machine can not move) S.I. 253a+261b+231a |
| 6 | M-150 Brick Work in (1:4) with cement and coarse sand mortar in including supply of all materials labour, Tools & plants etc. required for proper completion of the work as per S.I. No.305 (a) |
| 7 | 12 mmthick plaster with cement and coarse sand in (1:4) over brick work minimum thickness not to be less than 1cm. including supply of all materials, labour, tools & plants etc. required for proper completion of the work. S.I. No. 584(a) |
| 8 | Cement Concrete with 4 cm gauge approved stone grit, coarse sand & cement in the proportion of (4:2:1) including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. S.I. No. 279(a) |
| 9 | Supply and Fixing 80 mm thick ISI marked I shape mechanically compressed inter locking cement concrete paver Block manufactured by high pressured control vibration machine having plan dimention 200x(160+120) with minimum 5 mm thick toping of O.P. Cement mixed with 25 % marble powder. The compressive strength of concrete Paver Block shall not be less than 40 MPa and weight 4.50 kg per No. confirming to IS:15658 2006 including cost of material, labour, T & P |
| 10 | Laying of old Interlocking tiles (Labour only) Asper SI.No.New Item 13 |
| 11 | Supply and Fixing Inauguration stone with all completion. (L.S.) |
| 12 | GST 18 % |