| 1 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 BTNDSS No 23& 24VI(S2) VII 9,10 |
| 2 | Cement Concrete of mix 1 : 4 : 8 (One Cement four sand eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including formwork and centering labour charges, transporting and placing in position including shoring, strutting, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. |
| 3 | Supplying and erecting centering for sides and soffits including supports and strutting up to 3.29mm height for plane surfaces in all floors with cross bracings using mild steel sheets of size 30cm x 55cm and 10 gauge stiffened welded with mild steel sheets of size 25mm x 25mm x 3mm for boarding and laid over silver oak (country wood). Joists of size 10cm x 6.5 cm dia spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre etc complete complying with standard specification TNDSSNo. 30 &86 |
| 4 | a). For Sqr. Column |
| 5 | b). For Plinth Beam |
| 6 | Supplying fabricating and placing in position of TMTsteel rods using M.S. or Ribbed Tor Steel including cost of binding wire, cost of labour charges for fabrication and placing in positionetc. Complete. Complying with std. specifications. TNDSSNo,97 V,VI (S6) VII (S6)VII-3 |
| 7 | Vibrated Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc.Complete with std.Specifications.(using vibrater)(TNDSSNo.30 V,VI (S3) VII-3 |
| 8 | Brick work in following Cement Mortar using best quality of country bricks of size 8-3/4\" x 4-1/4\" x 2-3/4\" for foundation and basement including curing, etc., complete complying with standard specifiction. |
| 9 | Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 10 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 11 | SupplyingandFixingofSteel Gate and Grill inusing Square rods includingallcostofmaterialandLabourincludingallincidentalchargesetc.,completecomplyingwithstandardSpecifications. |
| 12 | Painting the new iron works such as steel doors, Windows,Ventilators windows bars,balustrades etc,in all floor withtwo coats of best approved first quality and colour of synthetic enamel paint of approved quality, colour and brand (to be approved by executive engineer before use on works ) over one the existing red oxide priming coat in all floors excluding cost of priming coat etc,complete complying with Standard Specification. (The Make, Quality and colour of paint should be got approved bythe engineer in charge before use on works )( TNSS NO or NBC No 61 V VI (54) 3) |