}

Tender For Electrification Work Of Bisanda Nagar Panchayat Payjal Punargathan Yojana Under Full Deposit Under Edd Atarra - The Work Of Erection Of 11 Kv Ht/Lt Lines & 25/63 Kva Sub-Stations For Electrification Of 08 No. Tubewells At Various Places As Tube, banda-Uttar Pradesh

Dakshinanchal Vidyut Vitran Nigam Limited has published Tender For Electrification Work Of Bisanda Nagar Panchayat Payjal Punargathan Yojana Under Full Deposit Under Edd Atarra - The Work Of Erection Of 11 Kv Ht/Lt Lines & 25/63 Kva Sub-Stations For Electrification Of 08 No. Tubewells At Various Places As Tube. Submission Date for this Tender is 20-09-2025. Electrification Work Tenders in banda Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

51208790
Tender For Electrification Work Of Bisanda Nagar Panchayat Payjal Punargathan Yojana Under Full Deposit Under Edd Atarra - The Work Of Erection Of 11 Kv Ht/Lt Lines & 25/63 Kva Sub-Stations For Electrification Of 08 No. Tubewells At Various Places As Tube
Tender
Indian
Uttar Pradesh
Banda
20-09-2025
BootCamp

Tender Details

Tender For Electrification Work Of Bisanda Nagar Panchayat Payjal Punargathan Yojana Under Full Deposit Under Edd Atarra - The work of erection of 11 KV HT/LT Lines & 25/63 KVA Sub-Stations for electrification of 08 No. Tubewells at various places as Tubewell No. 1 Jal Sansthan Water Works Campus Bisanda, Tubewell No. 1 Muktidham Parisar (Shiv Road) Bisanda, Tubewell No. 2 Mani Talab (In North Side), Tubewell No. 3 Mani Talab (In South Side), Tubewell No. 1 Muktidham Parisar (Baberu Road) Bisanda, Tubewell No. 2 Gaushala Parisar (Baberu Road) Bisanda,Tubewell No. 4 Mohan Talab (Infront of Sugreev Yadav Home) Bisanda,Tubewell No. 5 Mohan Talab (Infront of Chauba Prajapati Home) Bisanda etc. of Bisanda Nagar Panchayat Payjal Punargathan Yojana under FULL DEPOSIT SCHEME 2025-26 under EDD, Atarra, including carriage of all required material from ESC Banda to work site, alongwith its loading, unloading & dragging at the respective ends and also safe carriage of old line material/scraped from site to store centre, if any. The bidder shall be responsible for complete execution of the work under the scope of tender specification. Any work/activity not specifically indicated but is required for systematic execution of job shall be carried out by the contractor without any extra payment. The material supplied by contractor should be the best quality and as per standard including transportation, if any. Details of the work as given below ;- 2 SUPPLY OF FOLLOWING MATERIALS :- 3 Supply of Stone Pad as per RESSPO manual (arranged by tenderer at his own cost). 4 Supply of 3x70 Sq.mm. 11 KV O/D Type Cable Jointing Kit (Cable Box) (as per site requirement) (arranged by tenderer at his own cost). 5 Supply G.I. Pipe 6 dia as per RESSPO manual (arranged by tenderer at his own cost). 6 Supply of Cross Arm Holding Clamp with Nuts-bolts & washers as per RESSPO manual (arranged by tenderer at his own cost). 7 Supply of F-Clamp with Nuts-bolts & washers as per RESSPO manual (arranged by tenderer at his own cost). 8 Supply of MS Top Channel with clamp & nut-bolts 11 KV as per RESSPO manual (arranged by tenderer at his own cost). 9 Supply of MS Dropper Channel 100x50x2028 mm. with clamp & nut-bolts as per RESSPO manual (arranged by tenderer at his own cost). 10 Supply of MS T-Off Channel with clamp & nut-bolts as per RESSPO manual (arranged by tenderer at his own cost). 11 Supply of MS Angle 75x75x6x2028 mm. with clamps & Nuts-bolts & washers as per RESSPO manual (arranged by tenderer at his own cost). 12 ERECTION WORKS AS FOLLOWING :- 13 Safe cartage of 8.5 Mtr. long PCC poles from store centre to the respective site of work. 14 Safe cartage of line material viz. conductor, cable, G.I. earth wire, cross arm, angle, channel, insulator, clamps and other line material from store centre or from any other place to the respective site of work. 15 Erection & grouting of SP structure on 8.5 Mtr. long PCC poles, including complete H.T./L.T. fittings as per RESSPO manual and as per direction of Engineer incharge. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each). All grouting material arranged by contractor at his own cost. 16 Erection & grouting of DP structure on 8.5 Mtr. long PCC poles, including complete H.T./L.T. fittings as per RESSPO manual and as per direction of Engineer incharge. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each). All grouting material arranged by contractor at his own cost. 17 Erection and grouting of stay set with nozelling & binding as per norms. All grouting material arranged by contractor at his own cost. 18 Erection & fixing of earthing rod as per RESSPO manual. 19 Laying, sagging, stringing, binding and jumpering etc. of ACSR Weasel/Dog Conductor on the newly erected pole with complete fitting/fixing of all associated materials as per direction of supervising engineer/RESSPO manual. 20 Laying, stringing, binding and termination etc. of LT PVC Cable 3.5x220 Sq.mm. for connection to T/F LT bushing to LT Cable with complete fitting/fixing of all associated materials as per direction of supervising engineer/RESSPO manual. 21 Laying of 11 KV XLPE Cable 3x70 Sq.mm. through GI Pipe, including fixing/mounting of cable with G.I. Pipe 6 dia alongwith fitting of all accessories as per RESSPO manual 22 Laying of 11 KV XLPE Cable 3x70 Sq.mm. in cable trench, where trench is to be prepared by contractor, if required. Making of trench with sand, concrete & bricks etc. (All trench material arranged by contractor at his own cost. Only XLPE Cable provided by department). 23 Safely installation of 25 KVA Transformers in newly ereted double pole in proper alignment complete work alongwith fitting of all accessories, including the work of its cartage, loading & unloading at the respective ends. 24 Safely installation of 63 KVA Transformers in newly ereted double pole in proper alignment complete work alongwith fitting of all accessories, including the work of its cartage, loading & unloading at the respective ends. 25 Erection & fixing of 11 KV Fuse set with fitting of all accessories as per RESSPO manual. 26 Erection & fixing of 11 KV TPMO set with fitting of all accessories as per RESSPO manual. 27 Erection/commissioning of 3x70 Sq.mm. 11 KV O/D Type Cable Jointing Kit (Cable Box) (as per site requirement) for 3x70 Sq.mm. XLPE cable and making all suitable arrangements to get the work done. 28 Chopping of Tree Branches Coming in the vicinity of the lines during execution of the above works (One Job means each site of work). 29 Note: Any quantity of item from sl no. 1 to sl no. 27 may vary to any limit within the financial value of agreement against this tender.

Key Value

Document Fees
INR 1180 /-
Tender Value
INR 6.20 Lakhs /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail