Civil Work - Repairing Work At Various Places; Doumamling of existing struchires like culverts, bridges, retaining walls, (Croad and other structure comprising of mawnry, cement concrete, woal work, steel work, including TAP and scolding wherever nevessary, seeting the do marated material, dopoal of unserviceable material and stacking the servicentle maieual wahallis and tead of Cement Concrete Grade M-13 and above and ICC blocks50 Earth work in excasaten om foundatim, trenches etc mchoading hersing of sides ad amg of lotioma, eclading priting est the escavated material, refilling after layong pipe foundmen and Jsposal of suplus excavated material at a lead upto 50m sustable site as pet direction of Engineer for following depths. below natinal ground/Road top level, in all types soils mated soil such as moorum, sand, sandy sult, clay, black cotton soil, Lankar, etc. Depth spea 1.5m Carmage of Maternals by mechanical transport including loading, unloading and stacking: 1 Km Providing, layang and spreading of granular sub-hase by providing coarse graded Material (Table 400-2), spreading in uniforms layers with motor grader on prepared surface, BY MIX IN PLACE METHOD with rotasior M OMC, and compacting with vibratory ruller to achieve the desired density, complete as per MoRT&II specificamon clause-401 inchshing all material, labour, machinery. bghting, guarding and maintenance of diversion Grading-III Maternal Providing and laying lean cement concrete 148 m Sub-base over a quepared sub-grade with coarse and fine aggregate conforming to IS: 333, she sue of coarse eggregate not exceeding 25 mitt, aggregate cement entio not to execed 13 1, apgregnie padation ather blending to lie as per table 600-1, cetient content not to be less than 150 kg/cun, optionam moisture content to be determined during trial length construction, concrete strength not to be Jens shan 10 ipa at 7 days, mixed in a batching plant, mansported to site, laid with a paver with electronic sensor, compacting with 8-10 tounes vibratory roller, finishing and cung complete as per clause 601, 112 of MoRT&H specification inchading all material, labour, machinery,... more in document