Construction Of Mpag-Cum-Dtc Building At Keonjhar- 1 Earthwork in excavation in all kinds of soil with 50m initial lead and 1.5m initial lift as per the direction of the Engineer in charge 2 Filling in foundation and plinth with sand watered and rammed. 3 Cement concrete (1:4:8) with 4 cm.metal in plinth & foundation work 4 Cement concrete (1:2:4) in plinth & foundation work all complete 5 RCC work of M-25 grade with 20 mm & down grade crusher broken chips including holding & lying 6 GROUND FLOOR 7 Column Base Footing and slope footing 8 Column up to plinth level 9 Plinth Beam 10 Column upto Roof Level 11 Lintel 12 Stair Case 13 Chhaja/Sunshade 14 Roof Beam 15 Roof Slab & Portico 16 FIRST FLOOR 17 Column upto Roof Level 18 Lintel 19 Stair Case 20 Chhaja/Sunshade 21 Roof Beam 22 Roof Slab & Portico 23 SECOND FLOOR 24 Column upto Roof Level 25 Roof Beam 26 Roof Slab 27 Supplying,fitting and placing uncoated HYSD bar reinfourcement complete as per drawing and technical specification. 28 GROUND FLOOR 29 FIRST FLOOR 30 SECOND FLOOR 31 Brick work with fly ash brick having crushing strength not less than 75 Kg/sqcm in cement mortar (1:6) in plinth & foundation work 32 Brick work with fly ash brick having crushing strength not less than 75 Kg/sqcm in cement mortar (1:6) in Superstructure work 33 GROUND FLOOR 34 FIRST FLOOR 35 SECOND FLOOR 36 16 mm thick cement plaster (1:6) over brick masonary in Ground Floor all complete 37 GROUND FLOOR 38 FIRST FLOOR 39 SECOND FLOOR 40 12 mm thick cement plaster(1:6) over brick work in Ground Floor all complete 41 GROUND FLOOR 42 FIRST FLOOR 43 SECOND FLOOR 44 6 mm thick Cement Plaster(1:4) finished smooth over brickwork/concrete in Ground Floor all complete 45 GROUND FLOOR 46 FIRST FLOOR 47 Providing fitting,fixing of M.S Grill made out of M.S angle at the periphery & M.S Sq bar in the inner design with hold fast made out of M.S Angle as used in periphery completed including all cost of labour,T&P,hire charge of inlcuding machine,labour chrges etc.complete. 48 Total (G. Floor + F. Floor + S. Floor) 49 Providing fitting,fixing of Aluminium Door with OEL anodized AL door section of 9202 as vertical member,9201 as top member and 9200 as bottom and middle member and 6mm plain glass in top portion with 12mm thick pre-laminated board in bottom portion fixed on door frame by means of tappered clip no-4660 and the frame to be completed by means of jointing angle no-1855 including all cost of labour,T&P,hire charge of inlcuding machine,labour chrges etc.complete. 50 Total(G. Floor + F. Floor) 51 Supplying fitting,fixing of fully glazed AIuminium framed openable windows using 15 micron anodised OEL aluminium section 2082 as ouit section,9132 as mulion section 4124 as shutter section frame with tappered clips section 4125 aluminium angle, rubber beading,friction stay with handle and 5mm black glass including cost of materials all taxes labour,T&P etc.complete. 52 Total(G. Floor + F. Floor) 53 Cement washing two coats with cost of all labour & materials etc. complete as per direction of Engg-in-Charge . 54 GROUND FLOOR 55 FIRST FLOOR 56 SECOND FLOOR 57 Priming one coat with primer of approved shade over the plastered surface of walls 58 GROUND FLOOR 59 FIRST FLOOR 60 SECOND FLOOR 61 Finishing walls with water proofing weather coat of approved shade on new work two coat to give an even shade including cost of cement paint. 62 GROUND FLOOR 63 FIRST FLOOR 64 SECOND FLOOR 65 Distempering two coat to walls with distemper of approved shade or new work to give on even shade including cost of distemper. 66 GROUND FLOOR 67 FIRST FLOOR 68 SECOND FLOOR 69 Priming one coat over the M.S Grills, Doors, Windows and grills. 70 GROUND FLOOR 71 FIRST FLOOR 72 SECOND FLOOR 73 Painting two coat Enamel paint over the M.S Doors,Windows and grills. 74 GROUND FLOOR 75 FIRST FLOOR 76 SECOND FLOOR 77 Fixing of Chequered tiles in floors,treads or steps and landing of staircase on 25 mm thick bed of cement mortar(1:1) joined with neat cement slurry mixed withh pigments to match the shades of the tiles including rubbing and polishing complete including cost of Kota tiles 78 GROUND FLOOR 79 FIRST FLOOR 80 Fixing of vetrified floor tiles in floors,treads or steps and landing on 25 mm thick bed of cement mortar(1:1) joined with neat cement slurry mixed with pigments to match the shades of the tiles including rubbing and polishing complete including cost of Glazed tiles 81 GROUND FLOOR 82 FIRST FLOOR 83 Fixing of vitrified tiles in dado, skirting and risers of steps special plain/printed serieson 12 mm thick bed of cement mortar(1:3) joined with neat cement slurry mixed withh pigments to match the shades of the tiles including rubbing and polishing complete including cost of tiles 84 GROUND FLOOR 85 FIRST FLOOR 86 Supplying, fitting and fixing vitrified industrial floor tile 30x30cm premium grade 8 to 10 mm thick in floorsof approved makeconfirming to IS : 4457 laid on 20mm thick C.M (1:4) & filling joints with white cement of approved quality including cost of all materials, takes labour T&P etc required for the work 87 GROUND FLOOR 88 Providing fitting,fixing of FRP door with frame completed including all cost of labour,T&P,hire charges of drilling machine,lbour charges etc.complete 89 FIRST FLOOR 90 2.5 cm thick grading concrete (1:2:2) on roof slab with 6 mm size chips. 91 FIRST FLOOR 92 SECOND FLOOR 93 Providing,Supplying,fitting and fixing of hand railing using 50 mm steel with balustrade & bracing of roun 25 mmdia bracing completed including all cost of labour,T&P,hire charges of drilling machine,labour charges etc.complete. 94 FIRST FLOOR 95 Anti-Termite Treatment in floors of Ground floor before plinth filling all complete 96 GROUND FLOOR 97 Supply, Fitting of Wire mesh (GI) for rat prevention in floors and walls all complete 98 GROUND FLOOR 99 Installation of borewell (6 dia) with submersible pumpset 100 Drilling charges to accommodate 5 dia casing pipe as per required length 101 Supply, lowering of 5 dia PVC Casing pipes of required length as per directions of EIC 102 labour charges for 5 dia ribbed Filter pipe PVC pipes of required length as per directions of EIC 103 Supplying, Fitting and Fixing of 1HP submersible PUMP (APPROVED) with control panel make 8 stage motor complete in all respect as per the direction of Engineer in charge. 104 Construction of Pump Chamber (2 x 2) including RCC slab complete in all respect as per the direction of Engineer in charge 105 Supplying, Fitting and fixing of 25mm dia column pipe all complete as per direction of Engineer in charge 106 Supplying of electric cable for 1 HP pump as per requirement all complete as per direction of EIC 107 Supply & applying B class Gravels 108 Supply & applying Bentonite Powder 109 Internal Electrification and wiring 110 Recessed wiring to light point in with 20mm dia non metallic pvc conduit with 1 Sq mm Single Core multi strand copper wire & earth continuity in 2.24 mm all accessories & connection 111 Short Point 112 Long Point 113 Recessed wiring toFan point in with 20mm dia non metallic pvc conduit with 1 Sq mm Single Core multi strand copper wire & earth continuity in 2.24mm all accessories & connection 114 Medium Point 115 Recessed wiring to3 Pin 5Amp wall socket & plug pointin S/C multi strand copper wire and earth continuity in 2.24mm with all accessories and connectionon existing board 116 Recessed wiring to3 Pin 15Amp plug pointin S/C multi strand copper wire PP/6 on existing board 117 Recessed wiring to sub- main in 2X2.5mm sqr PVC insulated single core multistrand copper wire in 20mm dia PVC conduit S/C multi strand copper wire 118 Recessed wiring to sub- main in 2X4.5mm sqr PVC insulated single core multistrand copper wire in 20mm dia PVC conduit S/C multi strand copper wire 119 Recessed wiring to sub- main in 2X6.0 mm sqr PVC insulated single core multistrand copper wire in 20mm dia PVC conduit S/C multi strand copper wire 120 Supply and Fixing of B.K Angle holder complete with shade but without lamp M-7 121 Supply and Fixing of MCB on M.S Board 122 Supply and Fixing of 15 watt CFL/LED bulb 123 Supply and Fixing of Portico light with CFL lamp 124 Supply and Fixing of Computer Point 125 Supply and Fixing of compound board with all accessories 126 Supply and Fixing of 400mm exhaust fan 127 Supply and Fixing of 56 AC ceiling fan with all accessories and regulator 128 Supply and Fixing of 63 Amp ICTPN Main switch with all accessories on MS Box 129 Supply and Fixing of 32 Amp ICDP Main switch on MS box board 130 Supply and Fixing of 100 AMP Bus Bar 131 Supply and Fixing of 63 AMP Bus Bar 132 Supply and fitting of standard earthing as per Govt. specification and instruction of Engineer in charge 133 S/F of 4.0mm Al. service connection wire with 4mm GI wire 134 P.H. and Sanitary Fittings work all complete 135 Supplying of materials, labour and T & P and providing and fixing to wall or ceiling and floor all complete as per specification and direction of engineer-in-charge. 136 15mm dia PVC(ASTM) pipe 137 20mm dia PVC (ASTM) pipe 138 25mm dia PVC(80 Sch) ASTM pipe 139 50mm dia PVC(80 Sch) ASTM pipe 140 Cutting groove in floor and walls for taking GI/PVC pipe and as per specification and direction of engineer-in-charge. 141 Supplying, fitting and fixing brass/CP fittings of the following nominal bore as per specification and direction of engineer-in-charge. 142 15mm dia CP long body bib Cock (Approved Quality) 143 15mm diaangle stop Cock(Approved Quality) 144 25mm dia Brass/Gun Metal full way valve 145 15mm diaCP Pillar cock 146 15mm diaCP Short Body bib cock (Approved Quality) 147 Supplying, fitting and fixing 12.50Lit /10lit capacity Flushing Cistern of approved Quality with fittings all complete as per specification and direction of EIC. 148 Supplying and fixing the vitreous Squarting Pan / Commod (Western Type) of approved quality including fittings all complete as per specification and direction of the Engineer in charge 149 Supplying, fitting and fixing PVC Water Storage Tank (2000 ltrs)of approved quality including cutting hole throgh the tank and fixing tubes and fitting all completeas per specification and direction of the Engineer in charge. 150 Supplying all materials ,labour and T & P and fitting and fixingU PVC ventilating pipes etc all complete as per specification and direction of the Engineer in charge 151 110 MM Dia -PVCSWR pipe 152 110 MM Dia-PVC door Tee 153 110 MM Dia-PVCPlain Tee 154 110 MM Dia-PVCP Trap 155 110 MM Dia-PVC door bend 156 110 MM Dia-PVC plain bend 157 110 MMDia-PVC offset without ear 158 110 MM Dia-PVC cowl 159 110 MM Dia-PVCgrating 160 125 MM CPgrating 161 Supplying all materials ,labour and T & P and fixing the Wash Basinof approved quality all complete as perspecification and direction of the Engineer in charge 162 Supplying all materials ,labour and T & P and fixing 600mm x 400mm Bevelled Edge Mirror of superior glass all complete as per specification and direction of the Engineer in charge 163 600mm X 125mmPlate Glass Shelf with CP guard rails 164 Fixing standard size CP 20mm x 600mm Towel Rails complete as per specification and direction of the Engineer in charge 165 Supplying and Fixing CP Soap Holder complete as per specification and direction of the Engineer in charge 166 Supplying all materials , labour, T & P forconstructing inspection chamber all completeas per specification and direction of the Engineer in charge 167 Add Cost of Internal Partition with Ply and Aluminium 168 Earthfilling in embankmentt with road works all complete 169 Add Cost for Laying of M-40 Grade Paver blocks of 60mm thickness