| 1 | Earthwork in excavation in all kinds of soil with 50m initial lead and 1.5m initial lift as per the direction of the Engineer in charge |
| 2 | Filling in foundation and plinth with sand watered and rammed. |
| 3 | Cement concrete (1:4:8) with 4 cm.metal in plinth & foundation work |
| 4 | Cement concrete (1:2:4) in plinth & foundation work all complete |
| 5 | RCC work of M-25 grade with 20 mm & down grade crusher broken chips including holding & lying |
| 6 | GROUND FLOOR |
| 7 | Column Base Footing and slope footing |
| 8 | Column up to plinth level |
| 9 | Plinth Beam |
| 10 | Column upto Roof Level |
| 11 | Lintel |
| 12 | Stair Case |
| 13 | Chhaja/Sunshade |
| 14 | Roof Beam |
| 15 | Roof Slab & Portico |
| 16 | FIRST FLOOR |
| 17 | Column upto Roof Level |
| 18 | Lintel |
| 19 | Stair Case |
| 20 | Chhaja/Sunshade |
| 21 | Roof Beam |
| 22 | Roof Slab & Portico |
| 23 | SECOND FLOOR |
| 24 | Column upto Roof Level |
| 25 | Roof Beam |
| 26 | Roof Slab |
| 27 | Supplying,fitting and placing uncoated HYSD bar reinfourcement complete as per drawing and technical specification. |
| 28 | GROUND FLOOR |
| 29 | FIRST FLOOR |
| 30 | SECOND FLOOR |
| 31 | Brick work with fly ash brick having crushing strength not less than 75 Kg/sqcm in cement mortar (1:6) in plinth & foundation work |
| 32 | Brick work with fly ash brick having crushing strength not less than 75 Kg/sqcm in cement mortar (1:6) in Superstructure work |
| 33 | GROUND FLOOR |
| 34 | FIRST FLOOR |
| 35 | SECOND FLOOR |
| 36 | 16 mm thick cement plaster (1:6) over brick masonary in Ground Floor all complete |
| 37 | GROUND FLOOR |
| 38 | FIRST FLOOR |
| 39 | SECOND FLOOR |
| 40 | 12 mm thick cement plaster(1:6) over brick work in Ground Floor all complete |
| 41 | GROUND FLOOR |
| 42 | FIRST FLOOR |
| 43 | SECOND FLOOR |
| 44 | 6 mm thick Cement Plaster(1:4) finished smooth over brickwork/concrete in Ground Floor all complete |
| 45 | GROUND FLOOR |
| 46 | FIRST FLOOR |
| 47 | Providing fitting,fixing of M.S Grill made out of M.S angle at the periphery & M.S Sq bar in the inner design with hold fast made out of M.S Angle as used in periphery completed including all cost of labour,T&P,hire charge of inlcuding machine,labour chrges etc.complete. |
| 48 | Total (G. Floor + F. Floor + S. Floor) |
| 49 | Providing fitting,fixing of Aluminium Door with OEL anodized AL door section of 9202 as vertical member,9201 as top member and 9200 as bottom and middle member and 6mm plain glass in top portion with 12mm thick pre-laminated board in bottom portion fixed on door frame by means of tappered clip no-4660 and the frame to be completed by means of jointing angle no-1855 including all cost of labour,T&P,hire charge of inlcuding machine,labour chrges etc.complete. |
| 50 | Total(G. Floor + F. Floor) |
| 51 | Supplying fitting,fixing of fully glazed AIuminium framed openable windows using 15 micron anodised OEL aluminium section 2082 as ouit section,9132 as mulion section 4124 as shutter section frame with tappered clips section 4125 aluminium angle, rubber beading,friction stay with handle and 5mm black glass including cost of materials all taxes labour,T&P etc.complete. |
| 52 | Total(G. Floor + F. Floor) |
| 53 | Cement washing two coats with cost of all labour & materials etc. complete as per direction of Engg-in-Charge . |
| 54 | GROUND FLOOR |
| 55 | FIRST FLOOR |
| 56 | SECOND FLOOR |
| 57 | Priming one coat with primer of approved shade over the plastered surface of walls |
| 58 | GROUND FLOOR |
| 59 | FIRST FLOOR |
| 60 | SECOND FLOOR |
| 61 | Finishing walls with water proofing weather coat of approved shade on new work two coat to give an even shade including cost of cement paint. |
| 62 | GROUND FLOOR |
| 63 | FIRST FLOOR |
| 64 | SECOND FLOOR |
| 65 | Distempering two coat to walls with distemper of approved shade or new work to give on even shade including cost of distemper. |
| 66 | GROUND FLOOR |
| 67 | FIRST FLOOR |
| 68 | SECOND FLOOR |
| 69 | Priming one coat over the M.S Grills, Doors, Windows and grills. |
| 70 | GROUND FLOOR |
| 71 | FIRST FLOOR |
| 72 | SECOND FLOOR |
| 73 | Painting two coat Enamel paint over the M.S Doors,Windows and grills. |
| 74 | GROUND FLOOR |
| 75 | FIRST FLOOR |
| 76 | SECOND FLOOR |
| 77 | Fixing of Chequered tiles in floors,treads or steps and landing of staircase on 25 mm thick bed of cement mortar(1:1) joined with neat cement slurry mixed withh pigments to match the shades of the tiles including rubbing and polishing complete including cost of Kota tiles |
| 78 | GROUND FLOOR |
| 79 | FIRST FLOOR |
| 80 | Fixing of vetrified floor tiles in floors,treads or steps and landing on 25 mm thick bed of cement mortar(1:1) joined with neat cement slurry mixed with pigments to match the shades of the tiles including rubbing and polishing complete including cost of Glazed tiles |
| 81 | GROUND FLOOR |
| 82 | FIRST FLOOR |
| 83 | Fixing of vitrified tiles in dado, skirting and risers of steps special plain/printed serieson 12 mm thick bed of cement mortar(1:3) joined with neat cement slurry mixed withh pigments to match the shades of the tiles including rubbing and polishing complete including cost of tiles |
| 84 | GROUND FLOOR |
| 85 | FIRST FLOOR |
| 86 | Supplying, fitting and fixing vitrified industrial floor tile 30x30cm premium grade 8 to 10 mm thick in floorsof approved makeconfirming to IS : 4457 laid on 20mm thick C.M (1:4) & filling joints with white cement of approved quality including cost of all materials, takes labour T&P etc required for the work |
| 87 | GROUND FLOOR |
| 88 | Providing fitting,fixing of FRP door with frame completed including all cost of labour,T&P,hire charges of drilling machine,lbour charges etc.complete |
| 89 | FIRST FLOOR |
| 90 | 2.5 cm thick grading concrete (1:2:2) on roof slab with 6 mm size chips. |
| 91 | FIRST FLOOR |
| 92 | SECOND FLOOR |
| 93 | Providing,Supplying,fitting and fixing of hand railing using 50 mm steel with balustrade & bracing of roun 25 mmdia bracing completed including all cost of labour,T&P,hire charges of drilling machine,labour charges etc.complete. |
| 94 | FIRST FLOOR |
| 95 | Anti-Termite Treatment in floors of Ground floor before plinth filling all complete |
| 96 | GROUND FLOOR |
| 97 | Supply, Fitting of Wire mesh (GI) for rat prevention in floors and walls all complete |
| 98 | GROUND FLOOR |
| 99 | Installation of borewell (6\" dia) with submersible pumpset |
| 100 | Drilling charges to accommodate 5\"\" dia casing pipe as per required length |
| 101 | Supply, lowering of 5\"\" dia PVC Casing pipes of required length as per directions of EIC |
| 102 | labour charges for 5\"\" dia ribbed Filter pipe PVC pipes of required length as per directions of EIC |
| 103 | Supplying, Fitting and Fixing of 1HP submersible PUMP (APPROVED) with control panel make 8 stage motor complete in all respect as per the direction of Engineer in charge. |
| 104 | Construction of Pump Chamber (2\" x 2\") including RCC slab complete in all respect as per the direction of Engineer in charge |
| 105 | Supplying, Fitting and fixing of 25mm dia column pipe all complete as per direction of Engineer in charge |
| 106 | Supplying of electric cable for 1 HP pump as per requirement all complete as per direction of EIC |
| 107 | Supply & applying B class Gravels |
| 108 | Supply & applying Bentonite Powder |
| 109 | Internal Electrification and wiring |
| 110 | Recessed wiring to light point in with 20mm dia non metallic pvc conduit with 1 Sq mm Single Core multi strand copper wire & earth continuity in 2.24 mm all accessories & connection |
| 111 | Short Point |
| 112 | Long Point |
| 113 | Recessed wiring toFan point in with 20mm dia non metallic pvc conduit with 1 Sq mm Single Core multi strand copper wire & earth continuity in 2.24mm all accessories & connection |
| 114 | Medium Point |
| 115 | Recessed wiring to3 Pin 5Amp wall socket & plug pointin S/C multi strand copper wire and earth continuity in 2.24mm with all accessories and connectionon existing board |
| 116 | Recessed wiring to3 Pin 15Amp plug pointin S/C multi strand copper wire PP/6 on existing board |
| 117 | Recessed wiring to sub- main in 2X2.5mm sqr PVC insulated single core multistrand copper wire in 20mm dia PVC conduit S/C multi strand copper wire |
| 118 | Recessed wiring to sub- main in 2X4.5mm sqr PVC insulated single core multistrand copper wire in 20mm dia PVC conduit S/C multi strand copper wire |
| 119 | Recessed wiring to sub- main in 2X6.0 mm sqr PVC insulated single core multistrand copper wire in 20mm dia PVC conduit S/C multi strand copper wire |
| 120 | Supply and Fixing of B.K Angle holder complete with shade but without lamp M-7 |
| 121 | Supply and Fixing of MCB on M.S Board |
| 122 | Supply and Fixing of 15 watt CFL/LED bulb |
| 123 | Supply and Fixing of Portico light with CFL lamp |
| 124 | Supply and Fixing of Computer Point |
| 125 | Supply and Fixing of compound board with all accessories |
| 126 | Supply and Fixing of 400mm exhaust fan |
| 127 | Supply and Fixing of 56\" AC ceiling fan with all accessories and regulator |
| 128 | Supply and Fixing of 63 Amp ICTPN Main switch with all accessories on MS Box |
| 129 | Supply and Fixing of 32 Amp ICDP Main switch on MS box board |
| 130 | Supply and Fixing of 100 AMP Bus Bar |
| 131 | Supply and Fixing of 63 AMP Bus Bar |
| 132 | Supply and fitting of standard earthing as per Govt. specification and instruction of Engineer in charge |
| 133 | S/F of 4.0mm Al. service connection wire with 4mm GI wire |
| 134 | P.H. and Sanitary Fittings work all complete |
| 135 | Supplying of materials, labour and T & P and providing and fixing to wall or ceiling and floor all complete as per specification and direction of engineer-in-charge. |
| 136 | 15mm dia PVC(ASTM) pipe |
| 137 | 20mm dia PVC (ASTM) pipe |
| 138 | 25mm dia PVC(80 Sch) ASTM pipe |
| 139 | 50mm dia PVC(80 Sch) ASTM pipe |
| 140 | Cutting groove in floor and walls for taking GI/PVC pipe and as per specification and direction of engineer-in-charge. |
| 141 | Supplying, fitting and fixing brass/CP fittings of the following nominal bore as per specification and direction of engineer-in-charge. |
| 142 | 15mm dia CP long body bib Cock (Approved Quality) |
| 143 | 15mm diaangle stop Cock(Approved Quality) |
| 144 | 25mm dia Brass/Gun Metal full way valve |
| 145 | 15mm diaCP Pillar cock |
| 146 | 15mm diaCP Short Body bib cock (Approved Quality) |
| 147 | Supplying, fitting and fixing 12.50Lit /10lit capacity Flushing Cistern of approved Quality with fittings all complete as per specification and direction of EIC. |
| 148 | Supplying and fixing the vitreous Squarting Pan / Commod (Western Type) of approved quality including fittings all complete as per specification and direction of the Engineer in charge |
| 149 | Supplying, fitting and fixing PVC Water Storage Tank (2000 ltrs)of approved quality including cutting hole throgh the tank and fixing tubes and fitting all completeas per specification and direction of the Engineer in charge. |
| 150 | Supplying all materials ,labour and T & P and fitting and fixingU PVC ventilating pipes etc all complete as per specification and direction of the Engineer in charge |
| 151 | 110 MM Dia -PVCSWR pipe |
| 152 | 110 MM Dia-PVC door Tee |
| 153 | 110 MM Dia-PVCPlain Tee |
| 154 | 110 MM Dia-PVC\"P\" Trap |
| 155 | 110 MM Dia-PVC door bend |
| 156 | 110 MM Dia-PVC plain bend |
| 157 | 110 MMDia-PVC offset without ear |
| 158 | 110 MM Dia-PVC cowl |
| 159 | 110 MM Dia-PVCgrating |
| 160 | 125 MM CPgrating |
| 161 | Supplying all materials ,labour and T & P and fixing the Wash Basinof approved quality all complete as perspecification and direction of the Engineer in charge |
| 162 | Supplying all materials ,labour and T & P and fixing 600mm x 400mm Bevelled Edge Mirror of superior glass all complete as per specification and direction of the Engineer in charge |
| 163 | 600mm X 125mmPlate Glass Shelf with CP guard rails |
| 164 | Fixing standard size CP 20mm x 600mm Towel Rails complete as per specification and direction of the Engineer in charge |
| 165 | Supplying and Fixing CP Soap Holder complete as per specification and direction of the Engineer in charge |
| 166 | Supplying all materials , labour, T & P forconstructing inspection chamber all completeas per specification and direction of the Engineer in charge |
| 167 | Add Cost of Internal Partition with Ply and Aluminium |
| 168 | Earthfilling in embankmentt with road works all complete |
| 169 | Add Cost for Laying of M-40 Grade Paver blocks of 60mm thickness |