Restoration Fjb At Mohalla Dehra Chattral Reconstruction Of Damage Abutment And Approach And Superstructure Sub Division Mendhar Tehsil Mendhar District Poonch Under Permanent Restoration. Please Refer To Boq- Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil :50%.2 Ordinary Rock 30%.3 Hard Rock20% 2 Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) 3 Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 4 Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with.1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) 5 Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering,finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) 6 Providing and laying in position specified grade of reinforced cement concrete includingcuring but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) 7 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Cold twisted bars 8 Dumping stone including cost of stones.1 in Horizontal on level 9 Centering and shuttering including strutting, propping etc. and removal of form work for:1 Foundations, footings, bases for columns. 10 Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, walls (any thickness) including attached pilastersbuttresses, plinth and string course fillets, kerbs andsteps etc. 11 Carriage of material by mechanical transport including loading/unloading and stacking complete.Sand lead upto 45 kms avg. 12 Carriage of material by mechanical transport including loading/unloading and stacking complete.Stone agg.below 40 mm lead upto 10 kms avg. 13 Carriage of material by mechanical transport including loading/unloading and stacking complete.Stone agg.above 40 mm lead upto 10 kms avg. 14 Carriage of material by mechanical transport including loading/unloading and stacking complete.Stone lead upto 50 meter avg. 15 Provision for Dewatering 16 Construction of additional super structure including anchoring of ropes of the bridge and disminteling & relanching (complete Job).