construction of Culverts At Different Spots At Tarzoo A.- 1 Earth work in bulk excavation by mechanical means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil 2 Providing and layingdry stone soling in position including cost of stones in horizontal on level 3 Centering and shuttering including strutting, propping etc. and removal of form work for 4 Foundations, footings, bases for columns 5 Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. 6 Suspended floors, roofs, landings, balconies and access platforms. 7 Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) 8 Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) 9 Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) 10 Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) 11 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo-Mechanically Treated bars of grade Fe-500D or more. 12 Carriage of materialby Mechanical Transport from source to actual site of work including loading, unloading,Stacking etc 13 Stone Solling for an average lead 08 Kms from tujjar 14 Stone agg. 20 mmfor an average lead 20 KMs from kreeri 15 Sandfor an average lead 15 KMs from baramulla 16 cement/steel for an average lead of 01 km from local market