|
| 1 | Scrapping and removing the damaged portions of the existing oil-bound distemper (admeasuring more than 0.10 Sqm. each in area) from the distemper-painted walls and ceilings. This includes the comprehensive removal of coatings such as dry or oil-bound distemper and waterproofing cement paint, old putty. Utilize scrapping techniques followed by sandpapering to render the substrate uniformly smooth, rectifying any defects or abrasions, and finish by scrapping, chipping, sandpapering, washing with water, etc. Subsequently, apply a water based primer of Asian Paints, Nerolac makes or the equivalent of the approved brand as and when required in two or more coats to ensure adherence to environmental standards addressing any scratches or imperfections.Address any surface anomalies/irregularities on the exposed original plastered surface and prepare the surface by applying one or more coats ofwall care putty manufactured by M/s Birla Cements or M/s J.K. Cements or with an appropriate wall care putty/Plaster of Paris/ Lappam/putty base, and leveling and finishing the surface smooth to matchwith adjacent areas at all floors, heights and locations including the cost of materials, labor, scaffolding, tools & plants etc., all complete as per specifications and directions of Engineer-in-chargeNote: The quantity of wall care putty will be measured and paid for separately under relevant Item where as water based primer (As and when Required) will not paid seperatly. |
| 2 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth completeWallCare Putty, or an equivalent approved brand, shall be used for wall surface preparation, ensuring a smooth, water-resistant finish with superior whiteness and durability. The putty must be white cement-based, with Extra HP polymers to prevent moisture penetration and flaking, and should be a certified Green Product with zero VOCs. Surface preparation involves removing loose material with sandpaper or a wire brush, followed by moistening the wall. Mix the putty with 36-38% clean water to form a paste, apply the first coat with a putty blade, allow it to dry for at least 3 hours, and then apply the second coat. After drying, remove any marks with a moist sponge or gently rub the surface with a putty blade. The putty should provide extensive coverage, a superior refractive index, and be paint-friendly, with anti-carbonation properties to resist dampness on the painted surface, at all heights, lead and lift as per Specification and as Directed by Engineer Incharge. |
| 3 | Providing and applying Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre ofM/s. Asian Paints, M/s .Nerolac Paints and or equivalent approved make with two or more coats on old work on the existing painted walls and ceilings at all floors and locations including applying additional coats wherever required to achieve even shade and colour using first-quality of approved shade and make over the prepared surface with the cost of materials, labour, scaffolding, tools & plants, cleaning the floors, etc.,all complete as per specifications and directions of Engineer-in-charge.After painting work Cleaning and washing of all rooms, passages and balconies, toilets and bath rooms of including the cost of materials, tools, labour etc., all complete as directed by Engineer-in-charge. |
| 4 | Note-1: General Notes1.For their own interest, contractors are advised to inspect the site with prior permission before quoting their rates.3. All the samples of materials which are to be used shall be approved by the department in advance. 4. The contractor shall comply with the provision of the Payment of Wages act5. Rates quoted shall be inclusive of all cost of materials, labour, carriage, taxes, GST, labourcess, water charges, elctricity charges, signorage charges, wastages etc..6. Rates quoted shall be excluding the amount of EPFO and ESIC contributions. EPFO and ESIC contributions are reimbursableon production of valid proof of payment made by the contractor as per CPWD norms. |