| 1 | Road Work |
| 2 | Picking 5cm to 10cm old metalled surface and sectioning 1Sqm depth as directed bythe departmental officers and collecting the picked up salvagedmetal and stacking the same for reuse and deposting the debris excludingcost of materials including all labour charges for picking and all othertools and plants employed of the work and including all other incidental charges etc., complete as per standard specifications as per MORTH Rev. V Clause No. 111, 112, 202,305.4.3& 501. |
| 3 | Road A |
| 4 | Road B |
| 5 | Road C |
| 6 | WET MIX MACADAMProviding, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 |
| 7 | Road A |
| 8 | Road B |
| 9 | Road C |
| 10 | Prime Coat Over WMM Surface - Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5 |
| 11 | Road A |
| 12 | Road B |
| 13 | Road C |
| 14 | Tack Coat Over Primed Surface - Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 |
| 15 | Road A |
| 16 | Road B |
| 17 | Road C |
| 18 | Tack Coat Over Existing BT Surface - Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 |
| 19 | Road B |
| 20 | Road C |
| 21 | BM (Grade-II) 50mm Thick Using VG30Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm of 50mm thick including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 |
| 22 | Road A |
| 23 | Road B |
| 24 | Road C |
| 25 | BC 30mm Thick (Grade-II) Using VG30 BitumenProviding and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm of 40mm thick including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 |
| 26 | Road A |
| 27 | Road B |
| 28 | Road C |
| 29 | Vibrated cement concrete M20 Grade using 20 mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for laying, compacting, curing, and all incidental charges etc., complete foras per standard specification |
| 30 | Road C |
| 31 | Vibrated Cement Concrete of grade M30 (design mix) using 20mm, 12mm and 6mm ISS size hard broken granite metal including cost and conveyance of all materials tosite cost of premoulded expansion joints and fixing the same in position inhcluding cost and labour charges for formwork, labour charges for laying, compacting, curring including all other incidental charges etc., complete for WEARING COAT 70mm uniform thickness. |
| 32 | Road C |
| 33 | Calculation of SubTotal, GST and Total Amount carried out by system automatically |
| 34 | Basic cost of value put to tender as per estimate |
| 35 | Add GST at 18% |
| 36 | Total Value put to Tender |
| 37 | Quoted Percentage |
| 38 | Quoted Value |
| 39 | Add GST at 18% of Final Quoted Value |
| 40 | Total Value of Contract Including 18% of GST |
| 41 | Basic cost of value put to tender as per Estimate |
| 42 | Quoted Rate in Figures (Total Value of Contract Including 18% of GST ) |
| 43 | Quoted Rate in Words |