| Sl. No. | Item Description |
| 1 | Mahua Prakhand Antargat Panchayat Vishunpur Hiraram Urf Paharpur Ward No-12 Sedha Jaan ke nikat Vaya Nadi par pul ka Nirman |
| 2 | FOUNDATION |
| 3 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of side |
| 4 | i) Upto 3m depth |
| 5 | Providing and laying of PCC M15 levelling course 100mm thick below the foundation |
| 6 | II. PCC Grade M-15 (Levelling Course) |
| 7 | Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m.----Pile Dia 1200mm |
| 8 | Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification |
| 9 | RCC M-35 |
| 10 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 |
| 11 | Providing steel liner 10 mm thick for 1200mm Dia Piles ,including fabricating and setting out as per detailed drawing |
| 12 | Pile Load Test on single Vertical Pile in accordance with IS:2911(Part-IV) 1985 |
| 13 | a) Initialload test |
| 14 | Routine load test |
| 15 | b) Lateral load test |
| 16 | SUBSTRUCTURE |
| 17 | R.C.C. grade M-30 in Substructure complete as per Dwg & Tech Specification |
| 18 | RCC M-35 |
| 19 | Supplying, fitting and placing TMT HYSD bar reinforcement (Fe 500) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 |
| 20 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing |
| 21 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing |
| 22 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 |
| 23 | Providing and laying filter media with granular crushedaggregates as per specification to a thickness of not less than 600 mm with smallersize towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, win |
| 24 | SUPERSTRUCTURE |
| 25 | Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 |
| 26 | Supplying, fitting and placing HYSD bar reinforcement (Fe 500) in superstructrue complete as per drawings and technical specification Clauses 1002, 1010 & 1202 |
| 27 | Providing and laying cement concrete wearing course M30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 |
| 28 | Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space |
| 29 | Drainage Spouts complete as per drawing and technical specifications Clause 1209 |
| 30 | P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211. |
| 31 | Reinforced Cement Concrete M-30 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211 |
| 32 | Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm,complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their autho |
| 33 | Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical s |
| 34 | White Washing of Parapet WallsWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning, scapping, etc. as pre technical specification Clause 1915 |
| 35 | PROTECTION WORK |
| 36 | Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 |
| 37 | Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 |
| 38 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of side |
| 39 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification |
| 40 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. |
| 41 | RETAINING WALL |
| 42 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of side |
| 43 | Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification |
| 44 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing |
| 45 | Providing and laying filter media with granular crushedaggregates as per specification to a thickness of not less than 600 mm with smallersize towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, win |
| 46 | SUB HEAD : PREPARATORY WORKS ,SITE CLEARANCE , DISMANTLING |
| 47 | Clearing and Grubbing Road Land (By manual means)including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees ofgirth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of ser |
| 48 | Construction of embankment with approved material deposited at site and obtained from road way cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specifi |
| 49 | Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technica |
| 50 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as |
| 51 | Sub Head : PAVEMENT LAYERS - GSB & WBM ITEMS |
| 52 | Granular Sub-base with Coarse Graded Material (Table 400.1) |
| 53 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method |
| 54 | WBM Grading 3 (By Mechanical Means) |
| 55 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with threewheel 80-100 kN static roller in stages to proper grade and cam |
| 56 | SUB HEAD : Surface Course |
| 57 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. |
| 58 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.3kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 59 | Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, tra |
| 60 | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 7 |
| 61 | 900 mm equilateral & triangle |
| 62 | (I)Providing and Fixing \"Logo\" of Project |
| 63 | ( II ) Providing & Fixing of LOGO of\"Citizen Information Board\" |
| 64 | ( III ) Providing & Fixing of LOGO of\"Maintenance Board\" |
| 65 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of |
| 66 | SUB HEAD : TEMPORARY DIVERSION |
| 67 | Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technica |
| 68 | Grannular Sub-Base Gr-I - Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method. |
| 69 | Laying Reinforced cement concrete pipe NP4/Prestressed concrete pipe on first class bedding in double Row. |
| 70 | LABOUR 1% |
| 71 | Seigniorage Fee |
| 72 | GST 18% |
| 73 | Maintainance for 1st year |
| 74 | Maintainance for 2nd year |
| 75 | Maintainance for 3rd year |
| 76 | Maintainance for 4th year |
| 77 | Maintainance for 5th year |
| 78 | LABOUR 1% |
| 79 | Seigniorage Fee |
| 80 | GST 18% |
| 81 | Mahua Prakhand Antargat Panchayat Singhara Ward No-09 Vaya Nadi par pul ka Nirman |
| 82 | FOUNDATION |
| 83 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial. |
| 84 | i) Upto 3m depth |
| 85 | Providing and laying of PCC M15 levelling course 100mm thick below the foundation |
| 86 | II. PCC Grade M-15 (Levelling Course) |
| 87 | Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m.----Pile Dia 1200mm |
| 88 | Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification |
| 89 | RCC M-35 |
| 90 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 |
| 91 | Providing steel liner 10 mm thick for 1200mm Dia Piles ,including fabricating and setting out as per detailed drawing |
| 92 | Pile Load Test on single Vertical Pile in accordance with IS:2911(Part-IV) 1985 |
| 93 | a) Initialload test |
| 94 | Routine load test |
| 95 | b) Lateral load test |
| 96 | SUBSTRUCTURE |
| 97 | R.C.C. grade M-30 in Substructure complete as per Dwg & Tech Specification |
| 98 | RCC M-35 |
| 99 | Supplying, fitting and placing TMT HYSD bar reinforcement (Fe 500) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 |
| 100 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 |
| 101 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 |
| 102 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 |
| 103 | Providing and laying filter media with granular crushedaggregates as per specification to a thickness of not less than 600 mm with smallersize towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specificationClause 1204.3.8 |
| 104 | SUPERSTRUCTURE |
| 105 | Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 |
| 106 | Supplying, fitting and placing HYSD bar reinforcement (Fe 500) in superstructrue complete as per drawings and technical specification Clauses 1002, 1010 & 1202 |
| 107 | Providing and laying cement concrete wearing course M30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 |
| 108 | Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. |
| 109 | Drainage Spouts complete as per drawing and technical specifications Clause 1209 |
| 110 | P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211. |
| 111 | Reinforced Cement Concrete M-30 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211 |
| 112 | Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm,complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer\"s instructions for installation.) |
| 113 | Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical specifications. |
| 114 | White Washing of Parapet WallsWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning, scapping, etc. as pre technical specification Clause 1915 |
| 115 | PROTECTION WORK |
| 116 | Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 |
| 117 | Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 |
| 118 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial. |
| 119 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification |
| 120 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. |
| 121 | RETAINING WALL |
| 122 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial. |
| 123 | Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification |
| 124 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 |
| 125 | Providing and laying filter media with granular crushedaggregates as per specification to a thickness of not less than 600 mm with smallersize towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specificationClause 1204.3.8 |
| 126 | SUB HEAD : PREPARATORY WORKS ,SITE CLEARANCE , DISMANTLING |
| 127 | Clearing and Grubbing Road Land (By manual means)including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees ofgirth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I |
| 128 | Construction of embankment with approved material deposited at site and obtained from road way cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5 |
| 129 | Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 . |
| 130 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. |
| 131 | Sub Head : PAVEMENT LAYERS - GSB & WBM ITEMS |
| 132 | Granular Sub-base with Coarse Graded Material (Table 400.1) |
| 133 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method |
| 134 | WBM Grading 3 (By Mechanical Means) |
| 135 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with threewheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. |
| 136 | SUB HEAD : Surface Course |
| 137 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. |
| 138 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.3kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 139 | Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. |
| 140 | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing |
| 141 | 900 mm equilateral & triangle |
| 142 | (I)Providing and Fixing \"Logo\" of Project |
| 143 | ( II ) Providing & Fixing of LOGO of\"Citizen Information Board\" |
| 144 | ( III ) Providing & Fixing of LOGO of\"Maintenance Board\" |
| 145 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of |
| 146 | SUB HEAD : TEMPORARY DIVERSION |
| 147 | Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 . |
| 148 | Grannular Sub-Base Gr-I - Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method. |
| 149 | Laying Reinforced cement concrete pipe NP4/Prestressed concrete pipe on first class bedding in double Row. |
| 150 | LABOUR 1% |
| 151 | Seigniorage Fee |
| 152 | GST 18% |
| 153 | Maintainance for 1st year |
| 154 | Maintainance for 2nd year |
| 155 | Maintainance for 3rd year |
| 156 | Maintainance for 4th year |
| 157 | Maintainance for 5th year |
| 158 | LABOUR 1% |
| 159 | Seigniorage Fee |
| 160 | GST 18% |
| 161 | Name of Work: Mahua Nagar Prishad Ward No-09 Mahua Medical Collage ke pichhe Vaya Nadi par pul ka Nirman |
| 162 | FOUNDATION |
| 163 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial. |
| 164 | i) Upto 3m depth |
| 165 | Providing and laying of PCC M15 levelling course 100mm thick below the foundation |
| 166 | II. PCC Grade M-15 (Levelling Course) |
| 167 | Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m.----Pile Dia 1200mm |
| 168 | Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification |
| 169 | RCC M-35 |
| 170 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 |
| 171 | Providing steel liner 10 mm thick for 1200mm Dia Piles ,including fabricating and setting out as per detailed drawing |
| 172 | Pile Load Test on single Vertical Pile in accordance with IS:2911(Part-IV) 1985 |
| 173 | a) Initialload test |
| 174 | Routine load test |
| 175 | b) Lateral load test |
| 176 | SUBSTRUCTURE |
| 177 | R.C.C. grade M-30 in Substructure complete as per Dwg & Tech Specification |
| 178 | RCC M-35 |
| 179 | Supplying, fitting and placing TMT HYSD bar reinforcement (Fe 500) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 |
| 180 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 |
| 181 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 |
| 182 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 |
| 183 | Providing and laying filter media with granular crushedaggregates as per specification to a thickness of not less than 600 mm with smallersize towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specificationClause 1204.3.8 |
| 184 | SUPERSTRUCTURE |
| 185 | Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 |
| 186 | Supplying, fitting and placing HYSD bar reinforcement (Fe 500) in superstructrue complete as per drawings and technical specification Clauses 1002, 1010 & 1202 |
| 187 | Providing and laying cement concrete wearing course M30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 |
| 188 | Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. |
| 189 | Drainage Spouts complete as per drawing and technical specifications Clause 1209 |
| 190 | P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211. |
| 191 | Reinforced Cement Concrete M-30 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211 |
| 192 | Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm,complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer\"s instructions for installation.) |
| 193 | Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical specifications. |
| 194 | White Washing of Parapet WallsWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning, scapping, etc. as pre technical specification Clause 1915 |
| 195 | PROTECTION WORK |
| 196 | Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 |
| 197 | Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 |
| 198 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial. |
| 199 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification |
| 200 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. |
| 201 | RETAINING WALL |
| 202 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial. |
| 203 | Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification |
| 204 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 |
| 205 | Providing and laying filter media with granular crushedaggregates as per specification to a thickness of not less than 600 mm with smallersize towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specificationClause 1204.3.8 |
| 206 | SUB HEAD : PREPARATORY WORKS ,SITE CLEARANCE , DISMANTLING |
| 207 | Clearing and Grubbing Road Land (By manual means)including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees ofgirth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I |
| 208 | Construction of embankment with approved material deposited at site and obtained from road way cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5 |
| 209 | Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 . |
| 210 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. |
| 211 | Sub Head : PAVEMENT LAYERS - GSB & WBM ITEMS |
| 212 | Granular Sub-base with Coarse Graded Material (Table 400.1) |
| 213 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method |
| 214 | WBM Grading 3 (By Mechanical Means) |
| 215 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with threewheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. |
| 216 | SUB HEAD : Surface Course |
| 217 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. |
| 218 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.3kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 219 | Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. |
| 220 | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing |
| 221 | 900 mm equilateral & triangle |
| 222 | (I)Providing and Fixing \"Logo\" of Project |
| 223 | ( II ) Providing & Fixing of LOGO of\"Citizen Information Board\" |
| 224 | ( III ) Providing & Fixing of LOGO of\"Maintenance Board\" |
| 225 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of |
| 226 | SUB HEAD : TEMPORARY DIVERSION |
| 227 | Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 . |
| 228 | Grannular Sub-Base Gr-I - Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method. |
| 229 | Laying Reinforced cement concrete pipe NP4/Prestressed concrete pipe on first class bedding in double Row. |
| 230 | LABOUR 1% |
| 231 | Seigniorage Fee |
| 232 | GST 18% |
| 233 | Maintainance for 1st year |
| 234 | Maintainance for 2nd year |
| 235 | Maintainance for 3rd year |
| 236 | Maintainance for 4th year |
| 237 | Maintainance for 5th year |
| 238 | LABOUR 1% |
| 239 | Seigniorage Fee |
| 240 | GST 18% |