| 1 | Cartage of the following material from central store Meerut to J.E. store including loading & unloading at both ends (maximum distance up to 50 km.) |
| 2 | 1-P.C.C.Pole 11 mtr. Long |
| 3 | 2-P.C.C.Pole 8.5 mtr./STP 11 Mtr. Long |
| 4 | Line material such as 11 K.V. cross arms/11 KV Pin insulator/conductor/GIWire/MS angle & MS channel/stay wire/stay rod, disc fitting etc. |
| 5 | Cartage of the following material from store J.E. to site of work including loading & unloading at both ends (maximum distance up to 10 km.)1-P.C.C. Pole 11 Mtr. Long. |
| 6 | 2-P.C.C.Pole 8.5 mtr./STP 11 Mtr. Long |
| 7 | Line material such as 11 K.V. cross arms/11 KV Pin insulator/conductor/GI Wire/MS angle & MS channel/stay wire/stay rod, disc fitting etc. |
| 8 | Safe cartage of Transformer from central store Meerut to J.E. store of work including loading & unloading at both ends (maximum distance up to 50 km.)1-10 KVA to 100 KVA |
| 9 | Safe cartage of Transformer from J.E. store to site of work including loading & unloading at both ends (maximum distance up to 15 km.) 1-10 KVA to 100 KVA |
| 10 | Erection of Round Pole/P.C.C. Pole 8.5 Mtr. Long including fixing all accessories and fabrication as required after digging a pit of size 1.20X0.75X1.75 Mtrs.1-P.C.C. Pole 11 Mtr. Long. |
| 11 | 2-P.C.C.Pole 8.5 mtr./STP 11 Mtr. Long |
| 12 | Erection of D/P on PCC/Round Poles after digging of pits of size 1.20X0.75X1.75 Mtrs including fabrication of Structure as per RESPO norms. |
| 13 | Mounting of 11/0.4 KV T/F on making connection of PVC Cable & Lead of HT/LT line. |
| 14 | Earthing of PCC support with MS Earth rod of 2.5 Mtr. Long including excavation of pit & driving of MS rod up to proper depth & connection the earth electrode with the help of GI wire. |
| 15 | Laying Lifting stringing and sagging of conductor complete in all respects as per RESPO norms. 1-Rabbit Conductor. |
| 16 | 2-Weasel Conductor. |
| 17 | Erection fixing & grouting of stay rod size 16X1800mm after digging the pit of size 0.60X0.30X0.30 meter in ratio 1:4:8 including fixing of stay wire clamp and nuzzling at the both ends. |
| 18 | Providing & fixing of following clamps for PCC Pole/STP, made of MS flat of size 50X6mm complete in all respect. 1-LT Pin Clamps with nut & bolt. |
| 19 | 2-Shackle Insulator with nut & bolt. |
| 20 | 3-Double Pole Clamps with nut & bolt. |
| 21 | Providing & fixing of stay clamp for PCC Pole made of MS flat of size 50X6 mm complete in all respect. |
| 22 | Providing & fixing of Stay insulator in stay wire as per site requirement. |
| 23 | Providing & Fixing of F-Clamp for PCC Pole/STP made of MS flat of size 50X6mm with nut & bolt. |
| 24 | Providing & fixing of cross arm Holding clamp for PCC Pole/STP made MS flat of size 50X6mm with nut & bolt. |
| 25 | Making section T-off for 11 KV/LT Line. |
| 26 | Cutting & Chopping of tree branches. |
| 27 | Jumpering of 11 KV/LT Line at different places/T points. |
| 28 | Guarding of 11 KV Line as per norms. |
| 29 | Cartage of 11 KV XLPE Cable Difrent Size |
| 30 | Cartage of ABC Cable with junction Box & other store materials related with the work of ABC for each site/Transformer. |
| 31 | Fixing of cable Jointing/termination kit.Different Size |
| 32 | Laying of 11 KV XLPE Cable Different Size |
| 33 | Laying Lifting of ABC Cable Different Size complete in all respect as per instruction of J.E./SDO. |
| 34 | Fixing of Junction Box & making connection & other related works. |
| 35 | Fabrication and fixing of all 11 KV H.T/L.T. line accessories. |
| 36 | Dismantling of D.P. including the work of dismanling of all accessories and connected HT/LT Line connections. |
| 37 | Fixing of Fuse Set at D/P. |
| 38 | Cartage of old/damaged T/F. from work site to JE Store including loading & unloading at both ends. 1-10 KVA to 100 KVA |
| 39 | Cartage of old/damaged T/F. from JE Store to Central Store Meerut including loading & unloading at both ends. 1-10 KVA to 100 KVA (maximum distance up to 50 km.) |
| 40 | Cartage of Weasel/Rebbit/Dog Conduter fromsite of work to J.E. store to Centarl Store including loading & unloading at both ends (maximum distance up to 50 km.) |
| 41 | Cartage of PCC Pole 8.5/Mtr/ST Pole 11/ Mtr fromsite of work to J.E. store to Centarl Store including loading & unloading at both ends (maximum distance up to 50 km.) |
| 42 | Cartage of 11KV CT/PT Unit &11 KV Pilfer Proof Cubicalfromsite of work to J.E. store to Centarl Store including loading & unloading at both ends (Maximum Distance up to 50 km.)1-11 KV CT/PT unit of Different size2-11 KV Pilfer proof Cubical of Different size |
| 43 | Laying of 11 KV CT/PT unit of Different size |
| 44 | Laying of11 KV Pilfer proof Cubical of Different size |
| 45 | Providing and fixing Piercing Clamp. |
| 46 | Providing and fixing Dead & End Clamp. |
| 47 | Providing and fixing Suspension Clamp. |
| 48 | Providing and fixing Bolt and Nuts. |