| 1 | Dismentling of 2x10 MVAR Capacitor Bank Unistar Make Complete comprises with following equipments properly including all cost of Men, Material and T&P etc. |
| 2 | 33 KVSeries Reactor |
| 3 | 33 KV NCT |
| 4 | 33 KV Isolator |
| 5 | 33 KV 1x5MVAR Cap. Bank |
| 6 | 33 KV CT with junction Box |
| 7 | 33 KV PT with junction Box |
| 8 | 33 KV CB with Structure |
| 9 | 33 KV 3 Phase PT |
| 10 | Dismentling of Substation structure i.e. ALP(10 NO.), ABL(5NO.), CCM(8 NO.), CGM(4 NO.), BCT (1 NO.), CPM(4) etc. |
| 11 | Dismentling of Jumpers(ASCR Panther) from Bus to Equipment and Equipment to Equipment Safely. All Clamps must be in reusable condition. |
| 12 | Destringing of 33 Kv Bus Bar(1x Panther Conductor)R,Y,B Phase for Cap Bank Approx 18 Mtr and 6 Mtr |
| 13 | Laying andStringing of 33 Kv Bus Bar ofPanther Conductorfor Cap Bank of following length of span mentioned belowincludingfitting oftensionfittings, hoisting ofInsulators, cutting of conductor and shifting of all material fromstore to working siteand other assocaiated work to complete the job satisfactorily (1 No. of each phase)(a) Approx 18Mtr |
| 14 | Erection of Substation Structures(EKR-2NO ,BBR-02NO ,YMR-2NO ,CCM-14NO ,CGM-7NO ,CPM-07 NO ,ALP-19NO ,ABL-13 NO ,BCT-1 NO) etc at 132 KV S/S Jaswantnagar.The Job includes shifting of all material from store to site then erection of structures as per drawing using proper size of Nuts and Bolts and Washer Which will be Provided by UPPTCL. All men and T&P required for Satisfactory completion of work shall be arranged by the contractor. |
| 15 | Stringing of 33kv bus barextension of main (1xMoose ACSR) andtransfer bus(1xpanther conductor ) of following length of span mentioned below including fitting of tension fittings, hoisting of insulators, cutting of conductor and shifting of all materialfrom store to switchyardand otherassociated work to complete the job satisfactorily.( 01 No. of each phase)(a). Approx 20 Mtr. |
| 16 | Erection of following equipmentsas per instruction manual and technical specification including shifting of materialfromstore toworking siteincludingall other associated work to complete the job satisfactorily. |
| 17 | 33 KV VCB With Structures |
| 18 | 33 KV Bus Isolator |
| 19 | 33 KV Line Isolator |
| 20 | 33 KV CT With Juction Box |
| 21 | 33 KV PT With Junction Box |
| 22 | 33 KV 3 Phase PT |
| 23 | 33 KV 1x5 MVAR Capacitor Cell Including Structures |
| 24 | 33 KV Series Reactor |
| 25 | 33 KV NCT |
| 26 | 33 KV Tripple Feeder C&R Panel SAS |
| 27 | Jumpering of Equipments between Bus bar to BSI, BSI to CB, CB to CT, CT to LSI and Capacitor Bank and NCT by Twin/Single ACSR Panther Conductor (02 Nos cap. bank bayand02 Nos 33kv feeder bay ) |
| 28 | Earthing of Equipments and various Structure at two Places, one is Structure and other is equipments including laying of 50x6 mm and 25x6mm MS Flat,Excavation of earth upto 0.6 Mtr below the ground level.Cutting and Welding with Earth Mat with all Cost of T&P and Man Power . (MS Flat will be provided by UPPTCL free of cost) |
| 29 | 50x6 mm MS Flat |
| 30 | 25X6mm MS Flat |
| 31 | Painting of earthing stripsabove ground level with one coat of red oxide and two coat of syntheticenamelpaint & with blackbitumenpaint below ground level |
| 32 | 50x6 mm MS Flat ( in green colour ) |
| 33 | 25X6mm MS Flat ( in green colour ) |
| 34 | Laying of following size control cable in the cable trench from variousequipments to control room / J.B. with properdressing and saddling of cablesat every 75mmdistance with MS/aluminium saddleof size25x3mm includingcarriage of cabledrums from store to site and shifting backto store and fixing of cable tray as per cable schedule . |
| 35 | 2x2.5 sq mm |
| 36 | 4x2.5 sq mm |
| 37 | 6x2.5 sq mm |
| 38 | Terminationof following size control Cable as laid of as per cable schedule including making necessary holes in glandsplate ofpanel/ box wherever required.supply and fixing of cable glands, ferrule of appropriatesize and no. respectively for each core ofcable and its termination with crimping type lugsand all associated work to completethe job satisfactory ( All Required Material, Labour and T&P will be arranged by Contractor at his own cost.(cablewill be used of size2x2.5sqmm+4x2.5qmm+6x2.5sqmm) |
| 39 | Providing and Fixing of New Generation Energy & Environment friendly long aluminium outdoor beam street Light with high power 120 watt LEDs as light source suitable for 230V AC input supply of CGL/Havels/Philips/Bajaj Make . |
| 40 | laying of 2/4 x2.5 sq mm PVC controlcable forperiphery lighting, the job alsoincluding the excavation for tench and below 0.4mtr and laidthe cable in the trench and filling the sand on the cablethencovering the same by brick . |
| 41 | Fixing of 6,10 amp single phase MCB in lighting cubical junction Box .The Job includes proper wiring work etc including all material, labour ,T&P for proper Completion of work. |
| 42 | Providing and fixing ofjucntion box MCB type with structure for cable lighting termination work |
| 43 | Providingand fixing of33kv feeder name plate of 2mm thick aluminium sheet plate size 400x200mmwithcovering Retro reflectingsheet base green colour and write feeder name by white colour |
| 44 | Loading of 2x2.5sq mm / 4x2.5sq mm/6x2.5sq mmcopper control cable drum (05 Nos) at 132kv /220kv s/s within 82Km under ETD, Etawah |
| 45 | Carriage of 2x2.5sq mm / 4x2.5sq mm/6x2.5sq mmcopper control cable drum (05 Nos) from 132kv /220kv s/sto132kv s/s Jaswantnagar within 82Kmunder ETD, Etawah |
| 46 | Unloading of2x2.5sq mm / 4x2.5sq mm/6x2.5sq mmcopper control cabledrum (05 Nos) at 132kv s/s Jaswantnagar |
| 47 | Configuration& Integration of33 KV New bay with existing Siemens Make SCADA system for Operation and Measurements from Control room Including data transmission to SLDC Lucknow and backup to ALDC Modipuram. |
| 48 | Supply |
| 49 | Single tension fitting Moose conductor |
| 50 | Single suspension fitting for Moose conductor |
| 51 | Single suspension fitting for Panther conductor |
| 52 | PG Clamp Panther to Panther |
| 53 | PG Clamp Moose to Panther |
| 54 | PG Clamp Moose to Moose |
| 55 | Spacer Panther to Panther |
| 56 | Copper Bond |