| 1 | Safe carriage, loading-unloading with proper stacking of following materialfrom ESC-Daliganjto Work Site/JE -Dump Store- |
| 2 | 11/0.4 KV 250 KVA T/F |
| 3 | LT PVC 1X240/400 SQ MM CABLE |
| 4 | LT AB Cable (3x120+1x95+1x16) Sqmm |
| 5 | 11 KV 3x70/120 Sqmm XLPE Cable |
| 6 | 11KVO/DOOR Jointing Kit3X70/120 SQ MM |
| 7 | ST POLE 11 MT LONG |
| 8 | 11KV POLYMERIC PININSULATOR |
| 9 | Earth Rod |
| 10 | Safe carriage loading unloading with proper stacking of following materialfrom JE dump store to work site. |
| 11 | 11/0.4 KV 250 KVA T/F |
| 12 | LT PVC 1X240/400 SQ MM CABLE |
| 13 | LT AB Cable (3x120+1x95+1x16) Sqmm |
| 14 | 11 KV 3x70/120 Sqmm XLPE Cable |
| 15 | 11KVO/DOOR Jointing Kit3X70/120 SQ MM |
| 16 | ST POLE 11 MT LONG |
| 17 | 11KV POLYMERIC PININSULATOR |
| 18 | Earth Rod |
| 19 | Fabrication & erection of S/S type double pole for 11KV line on 11 M long ST pole with fixing of necessary clamps & other accessories. |
| 20 | Stringing,Sagging,winding and jumpering of LT line with AB Cable (3x120+1x95+1x16) conductor as per RESSPO Norms.(AB Cable provided by deptt.) |
| 21 | S/CCablelayinginMetalic/Damar/normalsoil Roadby Manual method as per site condition. (Allthe materialrequired for layingwillbesuppliedbythe contractorexcept 11 KV XLPE cable) |
| 22 | Laying of 3x120 sqmm XLPE Cable by manual method in HDPE Pipe |
| 23 | High Pressure testing of 11 KV XLPE cable. Testing equipment will be arranged by the contractor. |
| 24 | Hoisting of 11KVXLPE cable 3x70/185 sq mm Single Pole/Double Pole |
| 25 | ChemicalEarthingsystemwithouterpipediameter50mm,innerStrip 40x6, length 3000 mm. galvanization up to 200 micro, earthing pipe with crystalline conductive mixture filled inside the pipe with anti-corrosion & high conductive along with 50 Kg(As per required) of BFC which should becapabletoreducingthesoilresistivelywithgoodmoistureretaining capacity. (Specification ofchemical earthing and drawing is hereby enclosed). All material shall by supply by the contractor. |
| 26 | Providing earthing strip size 50x6mm and connecting from earthing pipe/m.s.earting rod to fuse unit/tronsformer body/ neutral earthing(Earthing rod & earthing strip arranged by contractor). |
| 27 | Construction of plinth for 250 KVA Transformer |
| 28 | Placement of 11/0.4 KV T/Fs from dump place to newly constructed T/Fs plinth & installation, commissioning of 250 KVA T/Fs of T/FPlinth and including jumpering with the system (Alltherequired matrial for abovejob shall be provided by contractor except T/Fs) |
| 29 | Wiremesh Fencing for 250 Kva Transformer |
| 30 | Construction of Distribution Pillar box made of MS Sheet (All the material will be arranged by the contractor). |
| 31 | Hoisting, winding and jumpering of LT cable size 1x240/400 sqmm between LT distribution box/fuse unit & constructed overhead line with proper lugging and clamping. |
| 32 | Fixing of DO Fuse Set |
| 33 | Construction of pole plinth. |
| 34 | Fixing of earth rod as per norms. (All Materials provided by contractor except Earth Rod.) |
| 35 | Grouting of pole |
| 36 | Painting of new erected pole |
| 37 | Supply & fixing of following material |
| 38 | Clamp With Nut and Bolt |
| 39 | Dropper Channel |
| 40 | Top Channel with clamp |
| 41 | AL Lug (250/400 kva) |
| 42 | CU L-Piece |
| 43 | Copper stripe of size 50x50x6 mm |
| 44 | M.S Nut & Bolts |
| 45 | 11 KV Danger Board With Clamp |
| 46 | Henless fuse unit 500 amp 650 volts |