Tender For Breakdown And Major Repair, Replacement Work Of Trilochan Ghat Sps At Varanasi. - Breakdown & major repair/ replacement work of Trilochan Ghat SPS, at Varanasi. 2 Repairing of Pump no. 1,2,3 & 4 at Trilochan Ghat SPS, Varanasi. 3 Pump No.1 40 HP 2600 lpm, 25 metre head 4 Carting of pump from Trilochan ghat SPS to workshop including shifting of pump on the road and loading hand trolly etc. complete. 5 Dismantling of pump and cleaning of all parts etc. complete. 6 Supply and fitting of bearing 6309-2Nos. SKF/FAG make including allcost of material and labour charges, T&P. 7 Supply and fitting of oil seal size (72x42x10)mm and (62x45x10)mm etc. complete including all cost of material labour charges T&P. 8 Supply and fitting of 12mm nut bolt including all cost of material and labour charges, T&P. 9 Repairing of bearing housing sleeve as per old sample T&P etc. 10 Supply and fitting of rubber bush-226L. 11 Assembly of all parts of pump and carting upto Trilochan ghat SPS. 12 Lowering, installation, testing & commissioning of pump motor & starter after flood period as per the direction of EIC. 13 Pump No. 2, 3 & 4, 5300 lpm, 26 mtr. head 14 Carting of pump from Trilochan ghat SPS to workshop including shifting of pump on the road and loading hand trolley etc. complete. 15 Dismantling of pump and cleaning of all parts etc. complete. 16 Supply and fitting of bearing 6411-2Nos. SKF/FAG make 17 Supply and fitting of oil seal size (60x80x12)mm and (65x85x12)mm -2Nos. 18 Supply and fitting of gland sleeve as per old sample etc. complete. 19 Supply and fitting of 16mm nut bolt-10 Nos. etc. complete. 20 Supply and fitting rubber bush size 225L-1No. 21 After repairing of pumpassembling of all and carting back to site from workshop etc. complete including loading, unloading and shifting. 22 Lowering, installation, testing & commissioning of pump motor & starter after flood period and its verification to EIC. 23 Servicing of 200 KVA DG Set KOEL make- 24 Draining out of HSD oil from service tank and lube oil from engine sump and cleaning it properly. 25 Replacement of Diesel filter & lube filter andfitting of both new filter required ring, packing etc. complete 26 Replacement of fuel water separator filter. 27 Replacement of air filters (outer & inner both) 28 Supply andfilling (top up 40 ltr.) of coolant including all cost of material, labour charges etc. complete. 29 Complete fitting of accessories including cleaning& testing of engine on load at site with all labour T&P etc. complete. 30 Painting at Trilochan Ghat SPS 31 Rubbing, Scrubing and cleaning of following equipments at Trilochan Ghat SPS at Pumping station with all materials labours and T&P complete for preparing the surface to painting works including safety devices to prevent accident. 1. Motors 40 HP- 1 No. &75 HP - 3Nos.2. Pumps 2600 LPM-No. & 5300 LPM-3Nos.3. dewatering set– 1No.4. Change over – 1No.5. Starter panels – 4Nos., APFC Panel- 1No., LT Panel- 1No. & PLC Panel- 1No.6. All supporting structure of panels. 7. Complete header line S.V/N.R.V. and all fitting in Pump well.8. Railing, Stair/ Platform in pump well, campus railing, Pump andsump well complete.9. 200 KVA DG set with alternator oil tank etc. complete.10. Screen fitted on ground level.11. Dewatering control panel.12. Air Blower set- 2Nos. 13. MS meter box and safety box.14. Canopy of 200 KVA DG set-1No.15. Screen fitted on ground level. 32 Painting of all above by spray machine with Smoke grey/ black enamel paint as required with all materials, labours and T&P compete required for completion of works. 33 Making Name Plate (Radium stickers) of all equipment few Danger plate symbol & fire etc and fitting properly at site. 34 Repairingof 40 HP Motor at Trilochan Ghat SPS, Varanasi. 35 Opening of motor 40 HP and taking out damaged bearing supply and fitting of new bearing size 6212 set SKF/FAG make. 36 Supply and fitting of washer 36 Nos. spring type in 40 HP. 37 Supply and fitting of nut-bolt 1”- 20 Nos., ½” – 20 Nos.40 HP etc. complete. 38 Supply and fitting of Terminal plat – 1No. in 40 HP motor. 39 Supply and fitting of lugs aluminum in motor as per old size or sample. 40 Cutting and snatching of burnt copper wire from 40 HP motor cleaning of slots & rewinding of same motor with suitable size of copper wire super enameled, Varnishing, Heating of motor all T&P and labour charges. 41 Lowering, installation, testing & commissioning of pump motor & starter after flood period and its verification to EIC. 42 Repairing of75 HP Motor at Trilochan Ghat SPS, Varanasi. 43 Opening of motor 75 HP and taking out damaged bearing supply and fitting of new bearing size 6312-1set SKF/FAG make. 44 Supply and fitting of washer 36 Nos. spring type in75 HP. 45 Supply and fitting of nut-bolt 1”- 20 Nos., ½” – 20 Nos.75 HPetc. complete. 46 Supply and fitting of Terminal plat – 1No. in 75 HP motor. 47 Supply and fitting of lugs aluminum in all motor as per old size or sample. 48 Cutting and snatching of burnt copper wire from 75 HP motor cleaning of slots & rewinding of same motor with suitable size of copper wire super enameled, Varnishing, Heating of motor all T&P and labour charges. 49 Lowering, installation, testing & commissioning of pump motor & starter after flood period and its verification to EIC. 50 Repairing/SITC of ladder, mesh, MS Rod size - 12mm x 175 mtr. C channel size 100mm x 5mm x 50mm gudder size 100mm x 15mm x 15mtr.MS angle in Pump well- 18mtr. deep, & pump well - 18mtr. Deep and MS plateform size (2.6 x 3 feet)- 3Nos. as per old structure and dismantling of old Mesh gadder, ladder etc. including all cost of material labour charges etc. complete. 51 SITC of LED Bulb with cover injector- 9 watt-12 No. inBridge withbathroom, etc. 52 SITC ofexhaust fan (300mm dia ) inLT Panel room, bathroom 53 SITC ofselling fan - 2 Nos inLT Panel room, store room,. 54 SITC ofLEDJhalar on festival of Dev dipawali including all cost of material and labour charge etc. complete. 55 Repairing/Replacement of 12 volt self for 200 KVA DG set- 1No. 56 Supply, fabrication and fitting of DG room, Tin shed size (20x10), making MS Pipeincluding painting tow coat enamel paint etc. complete. All cost of material and labour charge T&P. 57 SITC of Electric resistance sheet 10mm thickness size 1mtr.x 2mtr. forLT, PLC Panel, HT Panel, change over, DG set, APFC panel, APRU panel etc. complete. 58 Supply of fibrer Chair - 6 Nos., fiber Table - 1No. , Empty new drum for diesel carting- 2Nos.,Tarch - 1No. Table fan- 1No. Stand fan, 2000 watt Room heater. 59 SITC 150 AH Battery with Invertor2 No. for PLC & DG set Including all cost of material and labour charge etc. complete. 60 SITC of 24 inch wall fan reputedmake in Pump house. 61 Repairing of Dewatering Pump - 5 HP including all cost of material, labour charges etc. Complete. 62 Miscellaneous work (like as Supply of broom-12, cloth-10 kg, damaged parts, harpic, Acid, Dettol shop, mustard oildiesel carting- charge, electric fault, with Greasing, Gland dori of pumpcampus and Transformer sidegrass cutting (1 year) etc. on periodic basis as per requirement. 63 Comprehensive maintenance, Repairing of 75 HP Star delta starter, 60 HP ATS starter and replacement of burnt motor connection plate, lug including all cost of material labour charge etc. - 1Year 64 Comprehensive maintenance of APFC Panel- 200 KVAR with its calibration certificate Including all cost of material and labour charges T&P.( One Year) 65 Comprehensive maintenance ofLT Panel (main SFU-250 Amp. 1 Nos., SFU-150 Amp. 2 Nos.,- 100 Amp.- 5 Nos., and 63 Amp. 3 Nos., etc) & AMF Panel, replacing of burnt or non-working items, Including all cost of material and labour charges. ( One Year) 66 Repairing/Replacement of existing IP Cameras along with its 12 Month recharge. etc. complete Subjected to verification of EIC. 67 Comprehensive maintenance, Repairing of suction sluice valve/Reflex vlaves with pipe fitting 200/250/300/350 mm - 4Nos.of chock ages from NRV, Pumps and dewatering,(1 year) whenever necessary as per requirement and direction of EIC. 68 Delegation and other officials Site visit arrangement throughout the year as per requirement and direction of engineer in charge.( 1Year) 69 Repairing of bypass gate actuator, gear box and filling of fresh grease with Comprehensive maintenance of by pass gate including all cost of material, labour charge etc. complete. 70 Supply of tools set,This shall be a set of tools comprising of following items: (i) D-spanner set (6-17 mm)1 Set.(ii) Ring spanner(6-17mm) 1 Set(iii) Insulated cut Plier 1 No. (iv)Pipe wrench 18 1 No.(v) Screw driver 12”1 No. (vi)Hammer (500gm) with handle 1 No. (vii) Screw driver 8” 1 No. (viii) Tool box suitable size 1 No. (ix) Tonge tester (AC/DC- 500A) 1 No. (x) Electric safety hand gloves 1 Set(xi) Multimeter (AC/DC- 500A)1 No. (xii) Megger (AC/DC- 500V) 1 No. (xiii) Crimping tools 1 No. 71 Repairing/Preventive maintenance of earthing by GI Strips (size 50x6mm) of 2 No. & checking and testing earth pit all electrical equipment-Pumping Plant. of GI Strips as per side condition. ( One Year) 72 Refiling of ABC type/CO2 fire extinguisher - 6 Nos. direction of EIC at Trilochan Ghat SPS, Varanasi 73 Calibration of flow meter 400mm dia (Burahan make) with totalizer in PLC baises including all cost of material, labour charges etc. complete. 74 Miscellaneous and emergency work any damaged E&M Equipment, Delivery pipe line, common hedder, Y Pieces, Pump & motor, DG set etc complete ( one year) as per requirement and direction of EIC.