1)Eos to 1 no Tariff IIB industries Three Phase new service connection to Thiru.P.Shahin Kanjiramkuzhi Vilai at Edaicode of Puthenchanthai section, 2)Dcw estimate for shifting of lT line by providing 1 n 8mtr PSC pole as per the request of Thiru.S.Rasalam Kuruvil Vilai Mukkuttuka at Manjalumoodu of PTC section, 3)Dcw estimate for shifting of 8 mtr PSC pole as per the request of Thiru.E.Robert Viralivilai at Edaicode of PTC section, 4)Eos to 1 no Tariff VI single phase new service connection to Thiru.S.SudharsananMankalai Vilai Kallupalam at Edaicode of PTC section, 5)Eos to 1 no Tariff VISingle phase new SC to Thiru.M.Vijayakumar Kizhakkey Thottam Melpalai at Devicode of PTC section, 6)Eos to 1 no Tariff I Single phase new SC to Tmy.Shobha Odal Vilai Thettikuzhi at Edaicode of PTCsection, 7)Eos to 1 no Tariff VI single phase SC to G.Reghu Pilankala VIlaiChemmankalai at Maruthancode of PTC Section, 8)Eos to 1 no Tariff V single phase new SC to Thiru.A.K.Ajin Anto Venganamcode at PTC ssec, 9)Eos to 1 no Tariff VI single phase new SC connection to Thiru.T.S.Cibin Pilankalavilai Near CSI church Madathuvilai at Edaicode of PTC section, 10)Dcw estimate for shifting of LT line by providing 3 nos 8 mtr PSC pole as per the request of Thiru.Bhuvanendran Nair, EdaiyanamKuttaicode at Cheruvalloor of PTC section, 11)Eos to 1 no Tariff VI single phase new SC to Thiru.T.Jose Kanjiramparai of PTC section, 12)Eos to 1 no Tariff VI single phase new SC to Thiru.J.B.Sam Bright Aakkottukonam of Puthenchanthai distribution section, 13)Estimate for pole dashing of 1 no 8mtr PSC pole damaged by Thiru.Jose Kallampottai at Chemmankalai of Puthenchanthai section, 14)Dcw estimate for existing meter board by providing 1 no 8mtr PSC pole for Insertion as per the request of The Paster Rehoboth IPC Church Peroorkonam in Puthenchanthai Scetion, 15)Dcw estimate for Thiru.R.Aruldev under Puthenchanthai Section, 16)Dcw estimate for shifting of LT line by provid 2 nos 8mtr PSC pole as per the request of Thiru.C.Vincent Alunilkumvilai at Melpalai of Puthenchanthai Section, 17)Estimate for pole dashing of 1 no 8mtr PSC pole damaged by Thiru.P.Vincent Raj Pottavilai at Mathar Chencodi of PTC Section, 18)Eos to 1 no Tariff IA single phase New service connection to Thiru.C.J.Kins Kalvettankuzhi at Cheruvalloor of PTC section, 19)Dcw estimate for shifting of Meter Board as per the request of The Secretary CSI District Church Chirakkarai at Kuduchivilai under Puthenchanthai scetion.1)626/A31/181/ 2024-25 dt:04.12.2024, 2)696/A31/129/ 2024-25 dt:28.10.2024, 3)696/A31/176/ 2024-25 dt:16.12.2024, 4)626/A31/155/ 2024-25 dt:29.10.2024, 5)626/A31/150/ 2024-25 dt:28.10.2024, 6)626/A31/142/ 2024-25 dt:18.10.2024, 7)626/A31/140/ 2024-25 dt:18.10.2024, 8)626/A31/137/ 2024-25 dt:15.10.2024, 9)626/A31/138/ 2024-25dt:15.10.2024, 10)696/A31/165/ 2024-25 dt:04.12.2024, 11)626/A31/177/ 2024-25 dt:28.11.2024, 12)626/A31/112/ 2024-25 dt:19.09.2024, 13)696/A31/171/2024-25 dt:11.12.2024, 14)696/A31/206/ 2024-25 dt:28.01.2025, 15)696/A31/214/ 2024-25 dt:20.12.2025, 16)696/A31/162/ 2024-25 dt:28.11.2024, 17)696/A31/148/ 2024-25 dt:12.11.2024, 18)626/A31/221/ 2024-25 dt:20.12.2025, 19)696/A31/186/ 2024-25 dt:21.12.2024.; 1 Civil works 2 Loading&unloading of all REC, RCC pole above 8 m length 3 Excavation of pole pits for pole above 8 m length by using JCB/Manual 4 Erection of RCC,REC,PSC poles above 8 m length by using crane or manual 5 Loading&unloading of all REC, RCC pole upto 8 m length 6 Excavation of pole pits for pole upto 8 m length by using JCB/Manual 7 Erection of RCC,REC,PSC poles upto 8 m length by using crane or manual 8 Transportation of all types and sizes of poles and other associated materials from road side to pole pit and vice versa upto 0.50KM 9 Erection of Vcross arm 10 Fixing of LT S phase cross arm 11 Fixing of LT 3 phase cross arm 12 Fixing of HT pin insulator with pin 11 KV 13 Fixing of LT pin insulator 14 Fixing of shackle 15 Fixing of aluminium knob 16 Erection of stay set complete with fixing up stay wire Eye, Bow, Guy shackle, Binding etc 17 Dismantling of conductors of sizes upto 7/2.11&7/2.59 mm ACSR or equivalent conductor 18 Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or equivalent conductor 19 Paving and stringing of conductors of above 7/2.59 mm ACSR or other equivalent conductor upto 7/3.35 mm ACSR or other equivalent conductor. 20 Dismantling & Re erection of conductor up to 7/2.59mm ACSR or other equivalent conductor 21 Loading&unloading of line materials 22 Dismantling& re - erection of stay set complete with fixing up stay wire Eye, Bow, Guy shackle, Binding etc 23 Drilling/less than 23mm hole per hole/slatted hole 24 Ordinary tree clearance 25 Dismantling & reerction of LT S phase cross arm 26 Dismantling & reerction of LT 3 phase cross arm 27 Dismantling & Re Erection of Single phase Service connection 28 Dismantling & Re Erection of Three phase Service connection 29 Dismantling & reerction of LT pin insulator 30 Dismantling & re erection of LT Shackle 31 Dismantling & re erection of aluminium knob 32 Dismantling of LT Singlephase cross arm 33 Dismantling of LT 3 phase cross arm 34 Dismantling of LT pin insulator 35 Dismantling of LT shackle insulator 36 Dismantling of Aluminum Knob 37 Dismantling of Stay set 38 Dismantling of 8mtr RCC,REC, PSC &metal pole including the closing of the pit