Special Repair Works In The Government Roads Of Thirumangalam (H) C M Sub Division (Mdu 107)- Road Work 2 Picking the existing BT surface upto 50mm depth as directed bythe departmental officers and collecting the picked up salvagedmetal and stacking the same for reuse and deposting the debris excludingcost of materials including all labour charges for pickig and all othertools and plants employed of the work and including all other incidental charges etc., complete, as per MORTH Specification. 3 ROAD A 4 ROAD B 5 Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam,250mm thick, including premixing the materials with water at OMC in mechnanical mix plant,conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 6 ROAD A 7 ROAD B 8 Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it,including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5 9 ROAD A 10 ROAD B 11 Providing and laying Tack Coat over WBM/ WMM surface (treated with primer)using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges,rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 12 ROAD A 13 ROAD B 14 Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 15 ROAD A 16 ROAD B 17 Advance patch work using 45mm IRC size HBG metal for making thepot holesand patching usingVG10 grade bitumen including mixing atthe rate of 44 Kg / Cum of chips after trimming the pot holes or depression to proper shape and depth side painting with tack coat and compacting the layers as directed by Departmental officers etc.,complete, as per MORTH Specification 111,112,501,900 & 3004..Patchs. 18 ROAD A 19 ROAD B 20 Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50-13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperatureusing Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site,spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc.,including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 21 ROAD A 22 ROAD B 23 Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuelcharges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 507 of MORTH Rev-5 24 ROAD A 25 ROAD B 26 Excavation including removal and satisfactory disposal of all materias necessary for theconstructionof roadway and side drains in accordance with the specifications andthe lines, grades and cross sections shown in the drawings or as indicated by the Engineer including compaction by power roller rolling as per MORTH Specification No.111, 112, 301, 305, 900 using Carted earth an average lead of 2 km Lead 27 ROAD A 28 ROAD B 29 Calculation of SubTotal, GST and Total Amount carried out by system automatically 30 Basic cost of value put to tender as per estimate 31 Add GST at 18% 32 Total Value put to Tender 33 Quoted Percentage 34 Quoted Value 35 Add GST at 18% of Final Quoted Value 36 Total Value of Contract Including 18% of GST 37 Basic cost of value put to tender as per Estimate 38 Quoted Rate in Figures (Total Value of Contract Including 18% of GST ) 39 Quoted Rate in Words