Providing Bell Mouth for Right angled River Bridge Junction inVaigai River Bank Roads of Madurai (H) C&M Sub Division (MDU -101)- 1 Road Work 2 Dismantling of existing structures like bridges, and other structure comprising of Reinforced cement concrete, RR masonry, cement concrete and steel work including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres 3 ROAD A 4 ROAD B 5 ROAD C 6 Earth work excavation in all classes of soils except hard rock not requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water, shoring, strutting, walling and forming protective bunds wherever necessary etc., complete as per relevent standard specification for DRESSING THE BED UPTO SILL LEVEL. 7 ROAD A 8 ROAD B 9 ROAD C 10 Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bankwith all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Pile cap under Piers and Abutments for foundation. 11 ROAD A 12 ROAD B 13 ROAD C 14 Providing Reinforced Cement Concrete cast-int-situ bored PILES of 1200mm diameter in vibrated RCC M35 (Design mix) using 20mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel and placing it in position before concreting setting up of piling equipment, shifting the same from one pile location to another pile location, dismantling them and reerceting as necessary including all labour for driving or boring and providing temporary casing where required through all soils, leading the excavated earth to a distance of 200m including forming of working platform over the river bed of acomodating piling equipment including working platform etc., forming approaches to the working platform, mixing concrete, filling it in position, compacting, cutting of pile head to cut off level for casting pile cap, including diversion of water course if necessary and all other incidental charges etc., complete as per standard specifications, forming and maintaining protective bunds and all other incidental charges etc., complete for PILES BELOW PIERS AND ABUTMENTS. 15 ROAD A 16 ROAD B 17 ROAD C 18 Providing and driving in position permenent MS liners for piles from bottom of pile cap as per cl.709.1.4 of IRC 78 - 2014 (up to maximum scour level) including cost of liners and fabricating, welded construction with consumables, labour and plants and driving MS liner 6mm thick to be left permenantly with the pile shaft as per requirement and as per specification and placing them in position with all lead and lift etc. complete. 19 ROAD A 20 ROAD B 21 ROAD C 22 Vibrated Plain Cement concrete of grade M15 using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site and cost of cement at site, including soft water, labour charges for mixing transporting, laying, compacting, curing concrete, tools and plants and all incidental chargessuch as bailing out water, maintaining protective bunds, cofferdams, shoring etc., complete for LEVELLING COURSE BELOW PILE CAPS. 23 ROAD A 24 ROAD B 25 ROAD C 26 Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20mmand below HBG graded metal including cost and conveyance of all materials to site excluding cost of steelincluding cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Tools and Plants and incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevent standard specification for PILE CAPS UNDER ABUTMENT & PIERS 27 ROAD A 28 ROAD B 29 ROAD C 30 Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20mmand below HBG graded metal including cost and conveyance of all materials to site excluding cost of steelincluding cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Tools and Plants and incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevent standard specification for ABUTMENT & RETURNS 31 ROAD A 32 ROAD B 33 ROAD C 34 Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20mmand below HBG graded metal including cost and conveyance of all materials to site excluding cost of steelincluding cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Tools and Plants and incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevent standard specification for PIERS. 35 ROAD A 36 ROAD B 37 ROAD C 38 Vibrated Reinforced cement concrete of grade M35 (Design mix) using 20mm and below HBG metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for CAPPING BEAM OVER PIER. 39 ROAD A 40 ROAD B 41 ROAD C 42 Vibrated Reinforced cement concrete of grade M35 (Design mix) using 20mm and below HBG metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Bed Block cum Dirtwall over Abutments. 43 ROAD A 44 ROAD B 45 ROAD C 46 Vibrated Reinforced cement concrete of grade M35 (Design mix) using 20mm and below HBG metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Pedsetals 47 ROAD A 48 ROAD B 49 ROAD C 50 Supply and fixing of Elastomeric bearing of size (50 x 40 x 9.6 cm) shown in the drawing including cost and conveyance to worksite, labour for fixing the bearing in correct position and all other incidental charges etc., complete. 51 ROAD A 52 ROAD B 53 ROAD C 54 Vibrated Reinforced cement concrete of grade M35 (Design mix) using 20mm and below HBG metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for T Beam and Cross Beams. 55 ROAD A 56 ROAD B 57 ROAD C 58 Vibrated Reinforced cement concrete of grade M35 (Design mix) using 20mm and below HBG metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Deck slab, Kerb and Foot path. 59 ROAD A 60 ROAD B 61 ROAD C 62 Supplying and installation ofStrip Seal Expansion Joint system conforming to specifications forRoads and Bridge works published by the Ministry of Road Transport and Highways in the 40mm wide expansion gap provided in between decks over piers and in between decks and dirt wall over abutment with fatigue tested structural steel section at the nosing and anchorage seembly including cost and conveyance ofall materials cost of testing as per the MOST specifications including labour equipment and incidental charges for fixing the joints complete in all respects as per section 2600 of MORT&H specification. 63 ROAD A 64 ROAD B 65 ROAD C 66 VibratedReinforced Cement Concrete of grade M30 design mix using ISS size gradedHBG metal including cost & conveyance of all materials to site and cementatsite including all labour charges for mixing concrete laying, vibrating Hirecharges for Tools andPlants, compacting, curing with all leads ofsoft water,including and allotherincidental charges form work cost of premoulded expansion joints and fixing the same in position etc.,complete for wearing coat of 75mm uniform .thickness over Deck slab 67 ROAD A 68 ROAD B 69 ROAD C 70 Providing and fixing G.I Drainage spouts of 100mm Dia as per GOI drawing No. SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spouts projecting atleast 300mm beyond bottom of deck slab including cost and conveyance of all materials to site and fixing them in position etc., complete. 71 ROAD A 72 ROAD B 73 ROAD C 74 Vibrated Reinforced cement concrete of grade M40 (Design mix) using 20mm and below HBG metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Outer Crash Barrier . 75 ROAD A 76 ROAD B 77 ROAD C 78 Vibrated cement concrete M15 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges forlaying,compacting, curing all incidental charges etc., complete for BASE COURSE BELOW APPROACH SLAB. 79 ROAD A 80 ROAD B 81 ROAD C 82 Vibrated reinforced cement concrete M30 Grade (Design mix) using HBG graded metal of 20mm and below ISS size including cost and conveyanceof all materials to work site but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering, labour charges for laying, compacting, curing including all other incidental charges etc.,complete for APPROACH SLABS. 83 ROAD A 84 ROAD B 85 ROAD C 86 Providing and fixing Class I PVC seepage pipes of 110mm dia of required lengths for abutments and return walls including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain from the backfill as per section 2706 of MORTH specification (Rev- V) 87 ROAD A 88 ROAD B 89 ROAD C 90 Providing FILTER MEDIA behind abutments and return walls for 600mm thickness using filter material conforming to clause 309.3.2.B of MORTH well packedwith smaller size towards the soil and bigger size towards the wall including cost and conveyance of all materials to worksite and including labour charges and all other incidental charges etc.,complete. 91 ROAD A 92 ROAD B 93 ROAD C 94 Filling behind Abutments and return walls with clean gritty free draining gravel including cost of gravel having pi value less than 6, conveyance of gravel to worksite. Laying, handling charges and filling in layers tamping under optimum moiture content to get the maximum density, including watering, with all leads and lifts for water and all other incidental charges etc., complete. 95 ROAD A 96 ROAD B 97 ROAD C 98 Supply and fabrication of STEEL grade Fe500D with suitable anticorrsive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete. 99 ROAD A 100 ROAD B 101 ROAD C 102 Supply and fabrication of STEEL grade Fe240 with suitable anticorrsive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete. 103 ROAD A 104 ROAD B 105 ROAD C 106 Calculation of SubTotal, GST and Total Amount carried out by system automatically 107 Basic cost of value put to tender as per estimate 108 Add GST at 18% 109 Total Value put to Tender 110 Quoted Percentage 111 Quoted Value 112 Add GST at 18% of Final Quoted Value 113 Total Value of Contract Including 18% of GST 114 Basic cost of value put to tender as per Estimate 115 Quoted Rate in Figures (Total Value of Contract Including 18% of GST ) 116 Quoted Rate in Words