| 1 | Safely carriage of 11 KV VCB from Store Central Muzaffarnagar to 33/11 KV Sub Station including loading and unloading to both ends with the help of heavy duty crane. |
| 2 | Safely carriage of 33 KV VCB from Store Central Muzaffarnagar to 33/11 KV Sub Station including loading and unloading to both ends with the help of heavy duty crane. |
| 3 | Safely carriage of 33 KV Control Pannel from Store Central Muzaffarnagar to 33/11 KV Sub Station including loading and unloading to both ends with the help of heavy duty crane. |
| 4 | Safely carriage of 33 KV CT from Store Central Muzaffarnagar to 33/11 KV Sub Station including loading and unloading to both ends with the help of heavy duty crane. |
| 5 | Safely carriage of earthing complete from Store Central Muzaffarnagar to Site including loading and unloading to both ends |
| 6 | Dismentling of old 11 KV VCB from the Sub Station yard including opening of all connection and carriage of VCB from contol room to out side the Sub Station yard. |
| 7 | Dismentling of old 33 KV VCB from the Sub Station yard including opening of all connection and carriage of VCB from contol room to out side the Sub Station yard. |
| 8 | Dismentling of old 33 KV Control Pannel from the Sub Station yard including opening of all connection and carriage of control pannel from contol room to out side the Sub Station yard. |
| 9 | Dismentling of old 33 KV CT from the Sub Station yard including opening of all connection and carriage of control pannel from contol room to out side the Sub Station yard. |
| 10 | Shifting of New VCB from out side the Sub Station yard to in side the Sub Station yard with the helf of heavy duty crene and its instalation with grouting and anchor bolts. |
| 11 | Shifting of New 33 KV Control Pannel from out side the Sub Station yard to in side the Sub Station yard with the helf of heavy duty crene and its instalation with grouting and anchor bolts. |
| 12 | Shifting of New 33 KV CT from out side the Sub Station yard to in side the Sub Station yard with the helf of heavy duty crene and its instalation with grouting and anchor bolts. |
| 13 | Prpoer installation and commissioning of 33 KV Control Pannel |
| 14 | Prpoer installation and commissioning of 33 KV CT |
| 15 | Making the bus-bar connection of 11 KV VCB and making connection of H.T. Cable with VCB and proper installation of bus-bar and providing the copper wire and making the connection of VCB etc, complete. |
| 16 | Making the bus-bar connection of 33 KV VCB and making connection of H.T. Cable with VCB and proper installation of bus-bar and providing the copper wire and making the connection of VCB etc, complete. |
| 17 | Doing the water level earthing and jointing to structure with GI Strip as per RESPO norms. (All material provided by contractor) |
| 18 | Doing the Chemical earthing as per norms. |
| 19 | Errection of Earthing Complete |
| 20 | Doing the Plate earthing at sub station (Plate earthing specification has been enclosed) |
| 21 | Providing of 2.5 mmsq. PVC copper wire Lugs etc. and replacement of damaged burent wiring complete of 33 KV Control Pannel at 33/11 KV Sub station Meerapur |
| 22 | Providing of 4x2.5 mmsq. control cable and replacement of damaged control cable. |
| 23 | Safely Carriage of following material from work site to ESC, Muzaffarnagar including safe loading and unloading at both ends - |
| 24 | Old 33 KV VCB. |
| 25 | Old 33 KV Control Pannel |
| 26 | Old 11 KV VCB. |
| 27 | Damage Control Cable |
| 28 | Damage 33 KV CT |