|
| 1 | Supply, Cartage, Erection and Commissioning of the following work on semi Turn Key Basis |
| 2 | Supply of Required Material As per approved GTP of DVVNL/UPPCL |
| 3 | TAILLESS UNIT STAND |
| 4 | TAILLESS UNIT 500 A |
| 5 | 11 KV STAY INSULATOR |
| 6 | ALUMINIUM CRIMPING LUG 240 SQMM |
| 7 | ALUMINIUM LUG 200A |
| 8 | T/F FENCING COMPLETE |
| 9 | STONE PAD |
| 10 | CHEMICAL EARTHING OF T/F |
| 11 | EYE HOOK |
| 12 | PEARCING CONNECTOR FOR ABC 3*120 |
| 13 | NUT & BOLT |
| 14 | LT CLAMP FOR STP |
| 15 | SUITABLE POLE CLAMPS WITH N&B |
| 16 | LT INCOMING PANEL AMI METERING 63 KVA |
| 17 | DEAD END CLAMP |
| 18 | SUSPENSION CLAMP WITH EYE HOOK |
| 19 | Cartage, Erection and Commissioning of 33/11 KV Line on Single/Double STP/PCC Pole & Establishment of New Transformer/Augumentation of Transformer work includes Earthing,Grouting, Laying, Sagging, Strengthing, Painting,Binding of conductor and all work required to erect the line as per Respo Manual and rates. Work includes carriage of all required line material from ESC Hasari to work site (Grouting material will be provided by the contractor)as per Respo manual and rates. |
| 20 | M.S T-OFF CHANNEL 100*50*5*1300 MM |
| 21 | TAILLESS UNIT STAND |
| 22 | TAILLESS UNIT 500 A |
| 23 | 11 KV STAY INSULATOR |
| 24 | DISTRIBUTION BOX CLAMP |
| 25 | M.S TOP CHANNEL 100*50*5*2240 MM |
| 26 | DISTRIBUTION BOX 3 PHASE |
| 27 | M.S DROPPER CHANNEL 100*50*5*2028 MM |
| 28 | ALUMINIUM CRIMPING LUG 240 SQMM |
| 29 | T-OFF CHANNEL HOLDING CLAMP WITH NUT& BOLT |
| 30 | ALUMINIUM LUG 200A |
| 31 | LT PVC 3.5*150/70 SQMM CABLE |
| 32 | T/F BASE ANGLE 65*65*6*2028 MM |
| 33 | T/F FENCING COMPLETE |
| 34 | STONE PAD |
| 35 | CHEMICAL EARTHING OF T/F |
| 36 | EYE HOOK |
| 37 | PEARCING CONNECTOR FOR ABC 3*120 |
| 38 | NUT & BOLT |
| 39 | LT CLAMP FOR STP |
| 40 | SUITABLE POLE CLAMPS WITH N&B |
| 41 | LT INCOMING PANEL AMI METERING 63 KVA |
| 42 | DEAD END CLAMP |
| 43 | SUSPENSION CLAMP WITH EYE HOOK |
| 44 | EARTHING COMPLETE |
| 45 | 11 KV FUSE SET |
| 46 | STAY COMPLETE |
| 47 | 63 KVA 11/0.4 KV TRANSFOMER NEW |
| 48 | 250 KVA 11/0.4 KV TRANSFORMER NEW |
| 49 | PCC POLE 8.5 MTR LONG |
| 50 | ST POLE 9 MTR |
| 51 | STP POLE 11 MTR |
| 52 | LT ALU.XLPE CABLE 3.5*240 SQMM ARMOURED |
| 53 | SMC LT DIST BOX 3 PHASE |
| 54 | A.C.S.R WEASEL CONDUCTOR |
| 55 | DISC FITTING 45 KN(T&C) |
| 56 | ABC(3*120 + 1*95 + 1*16) SQMM |
| 57 | A.B. CABLE L.T.(3*95 + 1*70 + 1*16) SQMM |
| 58 | LT XLPE CABLE 3.5 * 150 SQ MM |
| 59 | ABC 1*16 + 1*25 |
| 60 | 11 KV DISC INSULATOR WITH FITTING |
| 61 | 11 KV POLYMER DISC INSULATOR(T&C) 45KN |
| 62 | PIN INSULATOR WITH PIN 11KV |
| 63 | 11 KV COMPOSITE POLYMER PIN INSULATOR |
| 64 | 11 KV GI PIN WITH NUT |
| 65 | LT AL.XLPE CABLE 1*240 SQMM |
| 66 | D.P.CLAMP FOR PCC 8.5 MTR POLE |
| 67 | 11 KV TPMO WITH POLYMER INSULATOR |
| 68 | 11 KV F CLAMP FOR PCC POLE 8.5 MTR LONG |
| 69 | 11 KV CROSS ARM CLAMP FOR PCC POLE 8.5 MTR |
| 70 | 11 KV V-TYPE STEEL CROSS-ARM 65*65*6 MM |
| 71 | G.I. WIRE 6 SWG |
| 72 | T/F PLINTH 2*2*1.6M |
| 73 | CONCREATING OF STAY |
| 74 | CONCREATING OF POLE |