Providing Paver Block With Drainage At Anna Nagar Last Street In Poochampatti Panchayat In Vadipatti Panchaya , Name Of Work:Construction Of Community Hallbuildinginroof Firstfloorgalvalume Sheet In Ramayanpatti Panchayat In Vadipatti Panchayat Under Mines & Mineral 2024-25 R 35.00 Lac , Earth Work Excavating And Depositing On Bank With Initial Lead Of 10M And Initial Lift Of 2M In Hard Stiff Clay,Stiff Black Cotton, Hard Red Earth, Shales, Murram, Gravel, Stoney Earth And Earth Mixed With Small Size Boulder Ss 20 A Hgs For Foundation. , Basement Filling For Conveyanced Earth Filling Complying With Standard Specification For Filling In Foundation And Basement. , Supply And Filling M. Sand Filling Complying With Standard Specification For Filling In Foundation And Basement. , Cement Concrete 1 : 4 : 8 Mix Using 40Mm Hbg Metal For Foundation Including Watering Wherever Necessary And Laid In Layers Of Not More Than 15Cm Thick., Compacting Etc., Complete Complying With Standard Specifications And As Directed , Supplying And Fabricating And Placing In Position Ms Steel Or Ribbed Tor Steel For All Reinforced Cement Concrete Works As Per The Design Given Including Cost Of Steel And Binding Wire In All Floors Etc,Complete Complying With Stanard Specification.(Ms , Cement Concrete 1:1.5:3 Using 20Mm Iss Hbg Metal For All Rcc Item Of Works Excluding Cost Of Rein Forcement And Fabricating Charges, Centering And Shuttering But Including Curing And Providing Fixtures Like Fan Clamps In The Rcc Floor Or Roof Slabs As Dir , Below Basement , Avove Basement , Brick Work In Cm 1:5 Mix Using Country Bricks Including All Cost And Conveyance Of All Materials And All Labour Charges Etc., Complete , Below Basement , Above Basement , Supplying & Erecting Centering For Sides & Soffiots Including Necessary Supports & Strutting Upto 3.29M Height For Plane Surfaces In All Floors With All Cross Bracings Etc., Complete Complying With Standard Specifications And As Directed By The Department , Below Basement , Above Basement , Supply Of Steeldoor Of Size 1.80X2.10M Including Cost And Conveyance Of All Materials To Site Of Work And All Labour Charges Etc Complete. , Supplysteel Window Of Size1.20X1.30M Including Cost And Conveyance Of All Materials To Site Of Work And All Labour Charges Etc Complete. , Special Ceiling Plastering And Finishing The Exposed Surface Of All Rcc Items Of Work Such As Slabs, Beams, Sunshades, Facia, Canopy Slab, Staircase Waist Slab, Landing Slab Etc., With Cement Mortar 1:3 (One Cement And Threem.Sand) 10Mm Thick Including Hacking The Surfaces, Providing Cement Mortar Nosing, Beading For Sunshades, Staircases, Steps, Landing Slabs And Curing, Etc., In All Floors Complying With Standard Specification And As Directed By The Departmental Officers ( Inner Plastering Cm 1:3 10Mm Tk) , Plastering With Cm 1:5, 12Mm Thick.In All Floors Including Curing Etc., Complete Complying With Standard Specifications And As Directed By The Departmental Officers , Weathering Course Concrete Using Best Quality Broken Brick Jelly Of Size 20Mm In Pure Slacked Lime Over The Rcc Roof Slab In Th Proportion Of Brick Jelly To Lime Being32:12.5 By The Volume And Laid Over A Single Layer And Consolidated To The Required Density. , Finishing The Top Of Roof With One Course Of Machine Pressed Tiles Of Size 20 X 20 X 2Cm Of Approved Quality Laid In Cm 1:3, 12Mm Thick. With Water Proofing Compound Confirming To Is By 2% By Weight Of Cement Used & The Joint Pointed Neatly To Full Depth , Paving The Floor With Stain Free Nano Polish Vitrifiedtiles Of Approved Quality And Colour Ofsize 600 Mm X 600 Mm X 8 Mm Of Approved Make, Quality And Colour In All Floors Over A Base Layer Of Cm 1:3, 20Mm Tk And Laid Straight Alignment And Pointed Neatly With Colour Cement At The Rate Of 0.40 Kg/M2 Laid Without Any Air Gap In The Tiles Neatly And Fixing In Position As Per The Colour & Quality Of Tiles Should Be Got Approved. , Paving The Floor With Pre-Polished Concrete Anti-Skid Tiles (Required Shape And Design) Of 20Mm Thick Of Approved Quality And Colour Laid In Cement Mortar 1:3 (One Cement And Three Crushed Stone M.Sand) 20Mm Thick And Pointed With White Cement Mixed With Colouring Pigment At The Rate Of 0.40 Kg. / Sq.M., Curing, Etc., Complete Complying With Standard Specification And As Directed By The Departmental Officers.(The Make And Brand Of The Tiles Should Be Got Approved By Executive Engineer Before Use On Works)Using Anti-Skid Tiles (Observed Data) , Supplying And Painting The Walls With Two Coats Of Wall Putty As Instructed By The Departmental Officers Including Preparation Of Surface Curing, Etc., Complete In All Floors Complying With Standard Specifications (The Wall Putty Shall Be Got Approved By The Executive Engineer Before Use Of Work). , Supplying And Painting The Walls With Two Coats Of Oil Bound Distemper Over One Coat Of Water Based Cement Primer Including Cost For Distemper, Primer, Cleaning And Scrapping The Walls, Rendering The Wallssmooth With Necessary Putty, Brushes, Scaffolding Arrangements, Labour Charges, Etc., As Per Standard Specification.(The Colour And Shade Of The Distemper Shall Be Got Approved By The Executive Engineer Before Use Of Work). , Exterior Emulsion ( Plastic Emulsion )Two Coats Over A Coat Of Primer Including Preparation Of Surface By Removing Loose Particles And Other Materials Including Cost And Conveyance Of All Material And Labour Charges Etc. Complete. , Painting With Ready Mixed Synthatic Enamel Paint Two Coats Including Prepration Of Surfaces By Removing Loose Particles And Other Materials And Applying Steel Lip Wherever Required To Makethe Surface Level And Smooth Including Cost And Conveyance Of All , Supplying, Fabricating And Placing In Position Mild Steel / Ribbed Tor Steel Grills For All Rcc Works As Per Design Given Including Cost Of Steel And G.I. Binding Wire In All Floors Etc. Complete Complying With Standard Specification.(Contractor Has To Make His Own Arrangements For The Supply Of Steel And Binding Wire) , Supplying And Fixing Colour Galvalume Sheet Roof Of 0.47Mm Thickand Steel Tubular Box Section Of 100X50x3mm Of 1Meter Interval Including Priming Coat Fixing In Position With All Necessary Accessories Complete Complying With Standard Specification And As Directed By The Departmental Officers. , Wiring With Light Point Sd No. 25 , Wiring With Fanpointsd No 25 , Supply & Fixing Of Tube Light Fitting Sd 88 , Wiring With Plug Point Sd No. 38 , Supplying And Fixing Of Fan Sd No.110 , Supply And Fixing Bulk Head Fittings Sd 83 , Supply & Fixing Of Main With Board Sd No 125 , Supply & Fixing Of 32 Amp Dpic Switch Of 50W Metal Clad With Fuse Sd144 , Supply & Run Of Service Wire Sd No. 64 , Provision For Eb Caution Deposit Charges , Supplying And Fixing Ofrain Water Pipe110 Mm Dia , 110Mm Pvc Elbow , 110 Mm Pvc Tee , 110Mm Pvc Y , Provision For Bore With Water Supply Arrangement , Provision For Rainwater Strucrure , Geophysical Survey Charges , Supply Of 200Mm Pvc Pipe 6Kg/Sqcm , Supply Of 150Mm Pvc Pipe 6Kg/Sqcm , Drilling Of 6 Dia Vertical Borewell In Hard Rock Area As Per The Recommendation Of Hydrogeolegist Including The Rig Transportation Inserting Of Casting Pipeand Flushing Etc Complete , Upto 24 M , Balance , Supply Of Submersible 2.00Hp Hp Pump Set And Having Duty Of 50 Lpm X 60 M With Isi Make , Supply Of 2.0 Hp Panel Board , 32 Mm Upvc Coloumn Pipe , Cost Of 2.5Sqmm Cable , Nylon Rope For Bore Well , M.S Clampset , Supplying And Fixingbore Cap Using M.S. Flat , Labour Charges For 2.00 Hp Motor Erection , 32 Amps Fuse Carrier , 25 Mm Pvc Pipe , Earth Work Ecavation In All Types Of Soils , Refilling In Pipelineexcavated Earth In Laying , 25Mm G.I Pipe , 25Mm G.I Coupling , 25Mm G.I Bend , 25Mm G.I Gate Valve , 25Mm G.I Hexnipple , 25Mm G.I Union , 32Mm G.I Elbow , 25Mm G.I Pipe , 20Mm Tap , 25Mm Cutting And Threading Charges , Lowering Gi Pipes And Specials In The Trenches And Laying To Proper Grade And Alignment, Jointing With Gi Specials And As Directed By The Twad Officers , 25Mm G.I Pipe , 25Mm G.I Pipe , Pvc Rigid Pipes 20Mm (3/4) , Provision For 1000 Litre Sintex , Provision For Name Boardcharges , Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package}