| 1 | Annexure -A ( Works ) |
| 2 | Dismantling of Transformers from double pole /plinth including openingof all connections, circuts & earthing strip etc. (25 KVA) |
| 3 | Dismantling of Transformers from double pole /plinth including openingof all connections, circuts & earthing strip etc. (63 KVA) |
| 4 | Dismantling of Transformers from double pole /plinth including openingof all connections, circuts & earthing strip etc. (100 KVA) |
| 5 | Dismantling of Transformers from double pole /plinth including openingof all connections, circuts & earthing strip etc. (250 KVA) |
| 6 | Excavation of earth of size 2.1x2.1x1.2 meter for DTR Plinth |
| 7 | Cement concreting work in ratio 1:4:8 of DTR Plinth. |
| 8 | Brick work in 1:4 ratio of DTR Plinth. |
| 9 | RR massonary work in 1:6 ratioof DTR Plinth. |
| 10 | RCC Work of 1:2:4 ratio 15 cm thickness of DTR Plinth. |
| 11 | Cement Plaster on side walls in 1:4 ratio of DTR Plinth. |
| 12 | Erection, providing and fixing of wire mesh of size 50x35 mmaround plinth and toe wall duly welded with frame of M.S angle iron 35 x35x6 mm and strip of size 35x6 mm in mid of each side along with wire mesh (width of wire mesh 1.5 meter ) with the heightof 0.5 meter above the plinth and 2 meter above the toe wall with 1 No. gateand locking arrangment in the toe wall size including grouting of 6 Nos. legs in the ratio inblock of size 0.25x0.25x0.45 meter including gravlling of shingle of size 20 to 40 mm and completepainting of wire mesh with aluminium paint with two coat (Including the cost of cement and all material). |
| 13 | Installation/ mounting of new 100 KVA Tranformer on pole structure and fixing of channel / angle etc. and making all connections ofHT and LT side and its complete commissioning. |
| 14 | Installation/ mounting of new 63 KVA Tranformer on pole structure and fixing of channel / angle etc. and making all connections of HT and LT side and its complete commissioning. |
| 15 | Installation/ mounting of new 400 KVA Tranformer on plinth structure and fixing of channel / angle etc. and making all connections of HT and LT side and its complete commissioning. |
| 16 | Installation/ mounting of new 250 KVA Tranformer on plinth structure and fixing of channel / angle etc. and making all connections of HT and LT side and its complete commissioning. |
| 17 | Cartage of the 63 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 21-50 Km) |
| 18 | Cartage of the 100 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 21-50 Km) |
| 19 | Cartage of the 250 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 21-50 Km) |
| 20 | Cartage of the 400 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 21-50 Km) |
| 21 | Laying and Fixing Insulated Cable LT XLPE Alu. Cond. Power cable. |
| 22 | Laying of LT cable & making connection at T/F LT bushing/LT pole with lug if required as per requirement. |
| 23 | Digging of Pit 3.5 mtr depth & grouting the earthing pipe withfilling of BFC (Back Filled Compound) & connect the G.I. Strip with earthing pipe & upto the equipments connecting with nut & Bolts/welding work complete work in all respect. |
| 24 | Transportation Charges from contractor works to UPCL site/Store Center including packing, forwarding, loading, unloading, stacking and transit insurance (25 KVA). |
| 25 | Transportation Charges from contractor works to UPCL site/Store Center including packing, forwarding, loading, unloading, stacking and transit insurance (63 KVA). |
| 26 | Transportation Charges from contractor works to UPCL site/Store Center including packing, forwarding, loading, unloading, stacking and transit insurance (100 KVA). |
| 27 | Transportation Charges from contractor works to UPCL site/Store Center including packing, forwarding, loading, unloading, stacking and transit insurance (250 KVA). |
| 28 | Annexure - B (Supply )(As per UPCL norms) |
| 29 | Supply of Al. Crimping Type Lugs 120 Sq.MM |
| 30 | Supply of Al. Crimping Type Lugs 70 Sq.MM |
| 31 | Supply of Al. Crimping Type Lugs 240 Sq.MM |
| 32 | Supply of Brass bolted type lugs for 400 KVA T/F |
| 33 | Supply of Al. Lug Crimping (400) Sq.MM. |