| 1 | Earthwork in excavation of foundation in all kinds of soil with all leads, lifts & delifts including rough dressingand leveling the bed and depositing the excavated materials clear away from work site and dewatering including removing bushes, stumps and any other foreign materials from the working area as well as from the foundation trenches with cost of all labour, T&P, taxes,hire and running charges of all machineries, labour, welfare, cessetc. all complete as per the direction of Engineer-in-Charge. |
| 2 | Filling foundation and plinth with sand well watered and rammed including cost of sand with all cost, carriage, royalty, taxes, cess of all materials, labour and T& P etc. all complete as per direction of the Engineer-in-Charge. |
| 3 | Providing and layingcement concrete M-15 grade with 40 mm size and down graded crusher broken hard granite aggregates free from weathered skin and other deleterious materials of approved quality and uniform colour and texture and sharp sand of approved grading and quality conforming to the specifications with all leads, lifts, delifts and transportation by mechanical / manual means including cost, carriage, royalties and taxes,cess of all materials,labour including dewatering by suitable means, mixing concrete by concrete mixer and placingby manual / Mechanical means supplying T & P, curing for specified days by suitable means including compacting by vibrator etc. completeas per approved drawing and specifications etc. complete with all costs incidental to the work and as directed by the Engineer-in-Charge. |
| 4 | Providing and layingcement concrete M-15 grade with 20 mm size and down graded crusher broken hard granite aggregates free from weathered skin and other deleterious materials of approved quality and uniform colour and texture and sharp sand of approved grading and quality conforming to the specifications with all leads, lifts, delifts and transportation by mechanical / manual means including cost, carriage, royalties and taxes,cess of all materials,labour including dewatering by suitable means, mixing concrete by concrete mixer and placingby manual / Mechanical means supplying T & P, curing for specified days by suitable means including compacting by vibrator etc. completeas per approved drawing and specifications etc. complete with all costs incidental to the work and as directed by the Engineer-in-Charge. |
| 5 | Providing and layingRCC / cement concrete M-25 grade with 20 mm size and down graded crusher broken hard granite aggregates free from weathered skin and other deleterious materials of approved quality and uniform colour and texture and sharp sand of approved grading and quality conforming to the specifications with all leads, lifts, delifts and transportation by mechanical / manual means including cost, carriage, royalties and taxes,cess of all materials,labour including dewatering by suitable means, mixing concrete by concrete mixer and placingby manual / Mechanical means supplying T & P, curing for specified days by suitable means including compacting by vibrator etc. completeas per approved drawing and specifications etc. complete with all costs incidental to the work and as directed by the Engineer-in-Charge. |
| 6 | Supplying, cutting, placing, bending, binding, straightening the uncoated HYSD (SAIL)rod for reinforcement for RCC work and laying the grills & placing in position including all cost of rod, binding wire of 18 to 20 SWG including carriage of all materials to the work site with all taxes,cess, etc. with all leads, lifts , delifts etc. complete with all costs incidental to the work as per direction of the Engineer-in-charge. |
| 7 | Rigid & smooth centering, shuttering for RCC walls and fins including false work & dismantling them after specified days of castingincluding the cost, carriage of all materials, labour, T&P, taxes, cess, etc. complete in all respectas perdirection of the Engineer-in-Charge. |
| 8 | Providing weep holes in brick masonary / plain / reinforced concrete works in abutments / wing walls / return walls with 100mm dia AC pipe extending through the full width of the structure with slope of 1v : 20H towards drawing face with cost of all materials, all labour, all taxes, cess, T & P etc. complete including welfareness as per direction of Engineer-in-Charge. |
| 9 | Earth work in suitable type of soil in borrow areaand loading in to transport vehicle and transportation of earth by mechanical means and unloadingthe earth over the approved surface of the embankment in proper profiles with all leads, lifts,delifts includingrough dressing and breaking the clods in to 5 cm to 7 cm size including removal of all foreign materials, debrises, grass, bushes, vegetations, shrubs, roots from transport earth including laying in layers not exceeding 22.50 cm in depthexcluding compaction with hire & running charges of all machineries, T & P, cost of fuel, lubricants, cost of labour,carriage, royalty, cess , taxes etc. all complete as per specification and direction of the Engineer-in-Charge. (Measurement will be taken in level section only) |